Laserfiche WebLink
  <br />  <br />TASK ORDER No. 9 – Pedestrian Crossing Study and Policy Development                   Page 2 of 3  <br />  <br />6. Provide a technical memorandum documenting the process and findings with one round of  <br />input from staff.  <br />7. Includes one workshop or council meeting for council review and comment.   <br />  <br />Task 3 – Pedestrian Crossing Policy  <br />1. Develop a specific crossing policy for Lake Elmo using local examples and coordination with  <br />staff.   <br />2. Draft a crossing policy for review and comment by the council. Includes one workshop or  <br />meeting facilitated by SRF with the council to determine final steps.   <br />3. Complete a final crossing policy document assuming two rounds of review by staff and the  <br />council.   <br />  <br />CITIES RESPONSIBILITIES:  The City (or its consultants) will provide the following:  <br />   <br />1. Feedback of concepts and cost estimates  <br />2. Setting up meetings  <br />  <br />TIMES FOR RENDERING SERVICES:  ENGINEER shall perform its services and provide deliverables in  <br />accordance with the following schedule:  <br />1. Agreed based on available meeting times with agencies and council  <br />2. Completion of this study by December 31, 2024.   <br />  <br />CITY’S REPRESENTATIVE AND CONTRACT ADMINISTRATION:  The CITY’s representative with respect  <br />to  services  rendered  by  ENGINEER  under  this  TASK  ORDER  shall  be the City Engineer.  Project  <br />correspondence must be addressed to:  <br />Jack Griffin, P.E., City Engineer   <br />City of Lake Elmo   <br />3800 Laverne Avenue North  <br />Lake Elmo, MN 55042  <br />651.300.4264  <br />Email: Jack.griffin@focusengineeringinc.com  <br />  <br />  <br />COMPENSATION:  Compensation to ENGINEER shall be on an hourly rate basis using the hourly billing  <br />rates provided in the ENGINEER’s Proposal for the work, in a not to exceed amount of $7,000 for Task  <br />1, an additional $10,000 for Task 2, and an additional $5,000 for Task 3. The total for all three tasks  <br />would be $22,000.  <br />Payment for Services shall be in accordance with ARTICLE 3.2 of the Master AGREEMENT. Invoices  <br />should be sent to the attention of the City Engineer.  <br />