My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#03 - Village Pkwy UPRR Crossing Improvements Task Order
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
07-02-24
>
#03 - Village Pkwy UPRR Crossing Improvements Task Order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 3:10:00 PM
Creation date
8/16/2024 2:27:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />TASK ORDER No. 8 Amendment #1 – VILLAGE PARKWAY UPRR CROSSING IMPROVEMENTS Page 4 of 5 <br /> <br /> Design Memorandum summarizing final design assumptions and performance criteria <br />incorporated into the project design. <br /> Identification of easements needed for the construction of the project, including <br />easement descriptions and exhibits for UPRR parcels. <br /> Final Project Plans and Specifications. <br /> Construction Administration documentation as completed throughout the Project. <br /> Weather logs, daily progress reports, reports on quantities installed on a construction <br />site, and other reports as outlined in a project’s Contract Documents. <br /> Field notes and field ties for completion of as‐built plans. <br /> Record drawings in electronic format (AutoCAD and PDF). <br /> <br />CITIES RESPONSIBILITIES: The City (or its consultants) will provide the following: <br /> Coordination with the public and conduct public meetings. <br /> Presentation(s) to the City Council. <br /> Easement negotiations and acquisition, if needed. <br /> Coordination with small utility companies if conflicts are identified. <br /> Hire geotechnical firm for geotechnical investigation. <br /> Responsible for UPRR’s Subconsultant plan review costs. <br />TIMES FOR RENDERING SERVICES: CONSULTANT shall perform its services and provide deliverables in <br />accordance with the following schedule: <br />1. Services will be initiated upon execution of Task Order by City and SEH, and will proceed <br />diligently until the project is permitted and advertised for construction. The timeframe will be <br />highly dependent upon Union Pacific permitting and application processes. <br />2. Construction phase services will be performed in accordance with the City constructor’s schedule <br />and UPRR construction activities. <br />CITY’S REPRESENTATIVE AND CONTRACT ADMINISTRATION: The CITY’s representative with respect <br />to services rendered by CONSULTANT under this TASK ORDER shall be the City Engineer. Project <br />correspondence must be addressed to: <br />Jack Griffin, P.E., City Engineer <br />City of Lake Elmo <br />3800 Laverne Avenue North <br />Lake Elmo, MN 55042 <br />651.300.4264 <br />Email: Jack.griffin@focusengineeringinc.com <br /> <br />COMPENSATION: Compensation to CONSULTANT for Project Management and preliminary design <br />work for the Village Parkway UPRR Crossing Improvements shall be on an hourly rate basis in a not to <br />exceed amount of $82,100. Invoices shall be submitted once each month and should be sent to the <br />attention of the City Engineer.
The URL can be used to link to this page
Your browser does not support the video tag.