Laserfiche WebLink
  <br />  <br />TASK ORDER No. 5 – South Area Water Treatment Plant – Amendment #1                  Page 1 of 2  <br />  <br />TASK ORDER                 No. 5 – A1  <br />CITY OF LAKE ELMO, MINNESOTA ‐ STANTEC CONSULTING SERVICES INC.  <br />PROFESSIONAL ENGINEERING SERVICES AGREEMENT  <br />  <br />In accordance with ARTICLE 1 of the Master AGREEMENT between the City of Lake Elmo (“CITY”) and  <br />Stantec Consulting Services Inc. (“ENGINEER”), dated May 1, 2012 (“AGREEMENT”), the ENGINEER  <br />agrees to provide Professional Engineering Support Services as follows:  <br />  <br />SOUTH AREA WATER TREAMENT PLANT – AMENDMENT #1  <br />  <br />PROJECT OVERVIEW/PROFESSIONAL ENGINEERING SERVICES:    <br />  <br />Task Order No. 5: The South Area Production Well and Treatment Study, Task Order 5, was authorized  <br />for  Professional  Engineering  Services  to  review  and  identify  potential  sites  for  at  least  two  new  <br />production Wells (Well 6, and Well 3 or 7), and identify the proposed scope of improvements for  <br />permanent PFAS treatment for the south area production Wells.  <br />  <br />Amendment #1: Task Order No. 5 Amendment #1 provides a partial engineering services budget  <br />increase  to  continue  with  preliminary  design  services  necessary  to  secure  property  for  the  water  <br />treatment plant on the sites identified, and to continue working with the MPCA to refine and finalize  <br />the scope of improvements to be approved by the MPCA for the South Water Treatment Plat full project  <br />grant application.  <br />  <br />CITY RESPONSIBILITIES:  The CITY (or its consultants) will provide the following:  <br />1. Meet with ENGINEER on a periodic basis to discuss the work in progress.  <br />2. Assist with property access for site reviews. Provide property information and record drawings  <br />available for proposed sites to be evaluated.  <br />3. Provide information on the existing water infrastructure as needed.   <br />  <br />TIMES FOR RENDERING SERVICES:  The work to be completed under this Task Order is considered  <br />urgent due to the CITY’s need to have at least 1 new production well and the South Area Water  <br />Treatment Plant online by May 30, 2027. The work shall be prioritized to provide preliminary design  <br />findings and recommendations as needed to assist the City in the identification and acquisition of  <br />property for locating the South Water Treatment Plant.   <br />CITY’S REPRESENTATIVE AND CONTRACT ADMINISTRATION:  The CITY’s representative with respect  <br />to  services  rendered  by  ENGINEER  under  this  TASK  ORDER  shall  be the City Engineer.  Project  <br />correspondence must be addressed to:  <br />Jack Griffin, P.E., City Engineer   <br />City of Lake Elmo   <br />3800 Laverne Avenue North  <br />Lake Elmo, MN 55042  <br />651.300.4264  <br />Email: Jack.griffin@focusengineeringinc.com