My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#13 - South Water Treatment Plant Amendment 1
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
08-20-24
>
#13 - South Water Treatment Plant Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 4:36:09 PM
Creation date
10/18/2024 2:06:03 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />TASK ORDER No. 5 – South Area Water Treatment Plant – Amendment #1 Page 1 of 2 <br /> <br />TASK ORDER No. 5 – A1 <br />CITY OF LAKE ELMO, MINNESOTA ‐ STANTEC CONSULTING SERVICES INC. <br />PROFESSIONAL ENGINEERING SERVICES AGREEMENT <br /> <br />In accordance with ARTICLE 1 of the Master AGREEMENT between the City of Lake Elmo (“CITY”) and <br />Stantec Consulting Services Inc. (“ENGINEER”), dated May 1, 2012 (“AGREEMENT”), the ENGINEER <br />agrees to provide Professional Engineering Support Services as follows: <br /> <br />SOUTH AREA WATER TREAMENT PLANT – AMENDMENT #1 <br /> <br />PROJECT OVERVIEW/PROFESSIONAL ENGINEERING SERVICES: <br /> <br />Task Order No. 5: The South Area Production Well and Treatment Study, Task Order 5, was authorized <br />for Professional Engineering Services to review and identify potential sites for at least two new <br />production Wells (Well 6, and Well 3 or 7), and identify the proposed scope of improvements for <br />permanent PFAS treatment for the south area production Wells. <br /> <br />Amendment #1: Task Order No. 5 Amendment #1 provides a partial engineering services budget <br />increase to continue with preliminary design services necessary to secure property for the water <br />treatment plant on the sites identified, and to continue working with the MPCA to refine and finalize <br />the scope of improvements to be approved by the MPCA for the South Water Treatment Plat full project <br />grant application. <br /> <br />CITY RESPONSIBILITIES: The CITY (or its consultants) will provide the following: <br />1. Meet with ENGINEER on a periodic basis to discuss the work in progress. <br />2. Assist with property access for site reviews. Provide property information and record drawings <br />available for proposed sites to be evaluated. <br />3. Provide information on the existing water infrastructure as needed. <br /> <br />TIMES FOR RENDERING SERVICES: The work to be completed under this Task Order is considered <br />urgent due to the CITY’s need to have at least 1 new production well and the South Area Water <br />Treatment Plant online by May 30, 2027. The work shall be prioritized to provide preliminary design <br />findings and recommendations as needed to assist the City in the identification and acquisition of <br />property for locating the South Water Treatment Plant. <br />CITY’S REPRESENTATIVE AND CONTRACT ADMINISTRATION: The CITY’s representative with respect <br />to services rendered by ENGINEER under this TASK ORDER shall be the City Engineer. Project <br />correspondence must be addressed to: <br />Jack Griffin, P.E., City Engineer <br />City of Lake Elmo <br />3800 Laverne Avenue North <br />Lake Elmo, MN 55042 <br />651.300.4264 <br />Email: Jack.griffin@focusengineeringinc.com
The URL can be used to link to this page
Your browser does not support the video tag.