Laserfiche WebLink
  <br />  <br />TASK ORDER No. 4 – Well #2 PFAS Treatment – Amendment #1                 Page 1 of 2  <br />  <br />TASK ORDER                 No. 4 – A1   <br />CITY OF LAKE ELMO, MINNESOTA ‐ STANTEC CONSULTING SERVICES INC.  <br />PROFESSIONAL ENGINEERING SERVICES AGREEMENT  <br />  <br />In accordance with ARTICLE 1 of the Master AGREEMENT between the City of Lake Elmo (“CITY”) and  <br />Stantec Consulting Services Inc. (“ENGINEER”), dated May 1, 2012 (“AGREEMENT”), the ENGINEER  <br />agrees to provide Professional Engineering Support Services as follows:  <br />  <br />WELL 2 PFAS TREATMENT – AMENDMENT #1  <br />  <br />PROJECT OVERVIEW/PROFESSIONAL ENGINEERING SERVICES:    <br />  <br />Task Order No. 4: The Well 2 PFAS Treatment Task Order 4 was authorized for Professional Engineering  <br />Services to evaluate the status and potential uses for Well 2, due to the new EPA standards for PFAS  <br />and the current PFAS levels found in the well. The Professional Services were retained to evaluate the  <br />feasibility for providing PFAS treatment, for temporary and/or permanent use by the CITY, in order to  <br />continue the full production use of Well 2 until a permanent replacement source is online.  <br />  <br />Amendment #1: Task Order No. 4 Amendment #1 provides a partial engineering services budget  <br />increase to proceed with design and construction phase services to initiate the Well 2 PFAS Treatment  <br />Plant Project in accordance with the Engineering Technical Memorandum approved by the City Council  <br />and dated March 15, 2024.  The budget increase is limited by the MPCA Grant Authorization amounts.  <br />  <br />CITY RESPONSIBILITIES:  The CITY (or its consultants) will provide the following:  <br />1. Meet with ENGINEER on a periodic basis to discuss the work in progress.  <br />2. Assist with property access for field survey and site review.  <br />3. Provide information on the existing water infrastructure as needed, including water demands  <br />and water quality testing.   <br />TIMES FOR RENDERING SERVICES:  The work to be completed under this Task Order is considered  <br />urgent due to the CITY’s need to increase its firm water supply capacity and restore Well 2 to full  <br />capacity operation. All work shall be completed in accordance with the attached milestone schedule  <br />and the Well 2 PFAS water treatment plant substantial completion shall be May 30, 2025, contingent  <br />upon equipment availability and MPCA fully funding the Project by October 15, 2024.  <br />CITY’S REPRESENTATIVE AND CONTRACT ADMINISTRATION:  The CITY’s representative with respect  <br />to  services  rendered  by  ENGINEER  under  this  TASK  ORDER  shall  be the City Engineer.  Project  <br />correspondence must be addressed to:  <br />Jack Griffin, P.E., City Engineer   <br />City of Lake Elmo   <br />3800 Laverne Avenue North  <br />Lake Elmo, MN 55042  <br />651.300.4264  <br />Email: Jack.griffin@focusengineeringinc.com