Laserfiche WebLink
Highpointe Crossing - 2298 Inwood Ave N – Lake Elmo – Preliminary Plat Narrative <br />June 7, 2024 <br />Page 22 <br /> <br />22 <br /> <br />• Stormwater Reuse – We are proposing a stormwater reuse system that will be installed to <br />irrigate 100% of the sodded and landscaped areas on the lots along with a portion of the open <br />space and entry landscaping. We have previously installed these types of systems with success <br />in other neighborhoods. <br /> <br />• Sanitary Sewer - Community Septic – We have completed soil and infiltration tests as well as <br />test pits to identify the best location(s) for a community septic system. That location is along <br />the north boundary of the property. Community treatment systems today are like package <br />plants they include a series of underground tanks including one called a Sequencing Batch <br />Reactor (SBR). These tanks basically function as a sewage treatment plant. A more detailed <br />report and explanation of the system has been included with our preliminary plat submittal. <br />Below is the preliminary plan for the community system. <br /> <br /> <br /> <br />• City Water/ Water Allocation <br />• The City has asked that we provide City water to this neighborhood along with a loop <br />connection to the Lake Elmo Heights neighborhood. This includes a City watermain as shown