My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#16 - Highpointe Crossing Preliminary Plat and OP PUD
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
08-20-24
>
#16 - Highpointe Crossing Preliminary Plat and OP PUD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2025 1:35:27 PM
Creation date
10/18/2024 2:17:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> PAGE 3 of 6 <br /> Additional design detail is required to support the proposed street connection at the existing Lake Elmo <br />Heights cul‐de‐sac. As presented to design appears to raise the grades adjacent to an existing property <br />and will require off‐site temporary construction easements. It is recommended that the design match <br />into the existing conditions to minimize impacts to existing properties and to alter the transition of the <br />street into the subdivision. A detailed vertical profile is needed to review the proposed street <br />connection and drainage. <br /> The temporary easement area must be shown on the preliminary plans. <br />10. The Preliminary Plans must be revised to include a dedicated right and left right turn lane along 24th Street <br />North at the subdivision entrance at Inwood Avenue (CSAH 13). Additional right‐of‐way will be required to <br />accommodate the turn lane. A typical section must be added to the Preliminary Plans to address the turn <br />lane details and additional right‐of‐way. The Preliminary Plat must be revised to include the additional right‐ <br />of‐way. <br />11. Sidewalks. City design standards require a six (6) foot sidewalk along all residential streets. The Preliminary <br />Plans show a 6‐ft. concrete sidewalk along the south and west sides of the proposed streets as required, <br />except that no sidewalk is shown along the short stub of the proposed cul‐de‐sac. <br /> The Preliminary Plans should be revised to reflect a concrete sidewalk along the full extents of 24th <br />Street, thereby eliminating the short segment of bituminous trail (400+/‐ feet) in lieu of sidewalk, and <br />creating a consistent pedestrian facility. <br /> Revise the typical section for 24th Street and Imperial Avenue to provide a consistent pedestrian path <br />The transition from trail to sidewalk is not recommended as presented on the Preliminary Plans. <br />12. Trail Requirements. The Open Space PUD ordinance requires a trail system to be established equal in length <br />to the sum of the centerline length of all public roads within the development. The Open Space PUD <br />ordinance also requires all trails to be paved. The Preliminary Plans and Narrative propose an extensive <br />grass trail system to be privately owned and maintained. <br /> Should the unpaved trails be approved by the City, it is strongly recommended that the trails be paved <br />in the vicinity of each street crossing, providing paved trails within the full extents of the right‐of‐way. <br />13. Ten (10) foot utility easements are required on either side of all public right‐of‐way. The 10‐ft. easement <br />corridor must be preserved for the installation of small/dry utilities and remain free from all <br />encroachments, and graded to a maximum 4% grade per city detail 805. <br /> Landscape plan revisions are necessary to remove all tree and monument encroachments. <br />14. Driveways. No driveways were shown as part of the Preliminary Plans. All driveways must be installed in <br />accordance with all city ordinances, including minimum distance from intersections, driveway angles <br />installed at 90‐degrees as they cross public right‐of‐way, and distance between driveways. Revisions to the <br />lot layouts may be necessary for driveway compliance. <br />15. Streetlights. A separate street light plan was submitted that remains inconsistent with the City design <br />standards in regards to the standard fixture and pole. The City requires the fixtures and poles to be Xcel <br />Energy fixture/poles, installed by the developer, and owned and maintained by Xcel Energy. <br /> Street light fixtures shall by 4000 Lumen Type B Traditional Colonial LED (Black in Color) <br /> Street light pole shall be 15 ft. Washington Fluted Aluminum pole (Black in Color). <br /> The Preliminary Plans should be revised to include a street pavement marking, signing and lighting plan <br />as required by the City design standards. The street light locations appear to be consistent with City <br />requirements, including at the entrance at Inwood Avenue, at the intersection with Imperial Court, at <br />the end of the cul‐de‐sac of Imperial Court, and at each trail crossing. <br /> <br />STORMWATER MANAGEMENT/GRADING <br />1. The proposed development is subject to a Stormwater Management Plan (SWMP) meeting State, Valley <br />Branch Watershed District (VBWD) and City rules. A VBWD permit is required. Storm water facilities <br />proposed as part of the development to meet State and watershed permitting requirements must be <br />constructed in accordance with the City Engineering Design Standards Manual dated January 2022. <br />2. Preliminary Plat approval must be conditioned on revisions to the SWMP as follows: <br /> The SWMP must be combined into a Report document with a Table of Contents, executive summary <br />and all supporting calculations. The Report must be signed by a registered professional engineer.
The URL can be used to link to this page
Your browser does not support the video tag.