  <br />    PAGE 3 of 6  <br /> Additional design detail is required to support the proposed street connection at the existing Lake Elmo  <br />Heights cul‐de‐sac. As presented to design appears to raise the grades adjacent to an existing property  <br />and will require off‐site temporary construction easements. It is recommended that the design match  <br />into the existing conditions to minimize impacts to existing properties and to alter the transition of the  <br />street  into  the  subdivision.  A  detailed  vertical  profile  is  needed  to  review  the  proposed  street  <br />connection and drainage.  <br /> The temporary easement area must be shown on the preliminary plans.  <br />10. The Preliminary Plans must be revised to include a dedicated right and left right turn lane along 24th Street  <br />North at the subdivision entrance at Inwood Avenue (CSAH 13). Additional right‐of‐way will be required to  <br />accommodate the turn lane. A typical section must be added to the Preliminary Plans to address the turn  <br />lane details and additional right‐of‐way. The Preliminary Plat must be revised to include the additional right‐ <br />of‐way.  <br />11. Sidewalks. City design standards require a six (6) foot sidewalk along all residential streets. The Preliminary  <br />Plans show a 6‐ft. concrete sidewalk along the south and west sides of the proposed streets as required,  <br />except that no sidewalk is shown along the short stub of the proposed cul‐de‐sac.  <br /> The Preliminary Plans should be revised to reflect a concrete sidewalk along the full extents of 24th  <br />Street, thereby eliminating the short segment of bituminous trail (400+/‐ feet) in lieu of sidewalk, and  <br />creating a consistent pedestrian facility.  <br /> Revise the typical section for 24th Street and Imperial Avenue to provide a consistent pedestrian path  <br />The transition from trail to sidewalk is not recommended as presented on the Preliminary Plans.  <br />12. Trail Requirements. The Open Space PUD ordinance requires a trail system to be established equal in length  <br />to the sum of the centerline length of all public roads within the development. The Open Space PUD  <br />ordinance also requires all trails to be paved. The Preliminary Plans and Narrative propose an extensive  <br />grass trail system to be privately owned and maintained.   <br /> Should the unpaved trails be approved by the City, it is strongly recommended that the trails be paved  <br />in the vicinity of each street crossing, providing paved trails within the full extents of the right‐of‐way.  <br />13. Ten (10) foot utility easements are required on either side of all public right‐of‐way. The 10‐ft. easement  <br />corridor  must  be  preserved  for  the  installation  of  small/dry  utilities  and  remain  free  from  all  <br />encroachments, and graded to a maximum 4% grade per city detail 805.  <br /> Landscape plan revisions are necessary to remove all tree and monument encroachments.   <br />14. Driveways. No driveways were shown as part of the Preliminary Plans. All driveways must be installed in  <br />accordance  with  all  city  ordinances,  including  minimum  distance  from  intersections,  driveway  angles  <br />installed at 90‐degrees as they cross public right‐of‐way, and distance between driveways. Revisions to the  <br />lot layouts may be necessary for driveway compliance.  <br />15. Streetlights. A separate street light plan was submitted that remains inconsistent with the City design  <br />standards in regards to the standard fixture and pole. The City requires the fixtures and poles to be Xcel  <br />Energy fixture/poles, installed by the developer, and owned and maintained by Xcel Energy.  <br /> Street light fixtures shall by 4000 Lumen Type B Traditional Colonial LED (Black in Color)  <br /> Street light pole shall be 15 ft. Washington Fluted Aluminum pole (Black in Color).  <br /> The Preliminary Plans should be revised to include a street pavement marking, signing and lighting plan  <br />as required by the City design standards. The street light locations appear to be consistent with City  <br />requirements, including at the entrance at Inwood Avenue, at the intersection with Imperial Court, at  <br />the end of the cul‐de‐sac of Imperial Court, and at each trail crossing.  <br />  <br />STORMWATER MANAGEMENT/GRADING  <br />1. The proposed development is subject to a Stormwater Management Plan (SWMP) meeting State, Valley  <br />Branch Watershed District (VBWD) and City rules. A VBWD permit is required. Storm water facilities  <br />proposed as part of the development to meet State and watershed permitting requirements must be  <br />constructed in accordance with the City Engineering Design Standards Manual dated January 2022.  <br />2. Preliminary Plat approval must be conditioned on revisions to the SWMP as follows:  <br /> The SWMP must be combined into a Report document with a Table of Contents, executive summary  <br />and all supporting calculations. The Report must be signed by a registered professional engineer.