My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#16 - Highpointe Crossing Preliminary Plat and OP PUD
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
08-20-24
>
#16 - Highpointe Crossing Preliminary Plat and OP PUD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2025 1:35:27 PM
Creation date
10/18/2024 2:17:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> PAGE 2 of 6 <br />6. When not located within the public right‐of‐way, minimum 30‐foot easements are required for public <br />watermain and storm sewer, centered over the pipe/hydrant/structure and without encroachments from <br />retaining walls, trees, other small/dry utilities, or storm water management BMPs. Utility easements must <br />be dedicated to the City as part of the plat. All utility easements must be shown on all grading, utility, and <br />landscape plans. <br />7. If not address through a right‐of‐way permit, the privately owned sanitary sewer collection system will <br />require a utility easement agreement as prepared by the City Attorney and Public Works Director, to <br />address the ongoing ownership and maintenance of the private sanitary sewer collection system located <br />within the public right‐of‐way. <br /> <br />STREETS AND TRANSPORTATION <br />1. Inwood Avenue Right‐of‐way dedication. Right‐of‐way dedication will be required as part of the Plat <br />including 75‐feet as measured from the existing roadway centerline. Right‐of‐way dedication has been <br />shown on the Preliminary Plat and Plans as required. <br />2. Access Management. Site access is shown from a new street (24th Street North) extending west into the <br />subdivision from Inwood Avenue (CSAH 13). The Access location is subject to final approval by Washington <br />County. <br />3. Inwood Avenue (CSAH 13) Improvements. The development will be responsible to make improvements to <br />Inwood Avenue at developer’s sole cost. Improvements will include right and center left turn lanes at the <br />intersection of the new local street (24th Street north) consistent with Washington County Standards. The <br />Preliminary Plans include turn lane improvements as required. The turn lane plans are subject to review <br />and final approval by Washington County. <br />4. Secondary access to the site is required for residential units exceeding 30 homes. Secondary access will be <br />accomplished through a connection to Imperial Avenue, connecting into the existing Lake Elmo Heights <br />residential neighborhood. <br />5. Phasing Plan. The development phasing will require the secondary connection to Imperial Avenue to be <br />operational before the 31st building permit will be issued. Access for the initial phases of development <br />should be prohibited from Imperial Avenue to avoid construction traffic through the existing Lake Elmo <br />Heights neighborhood. Temporary cul‐de‐sacs meeting City design standards will be required as the <br />development is phased. <br /> A phasing plan was included in the Narrative of the application. The Preliminary Plans must be revised <br />to incorporate the Phasing Plan as part of the Preliminary Plan set. <br /> Phase 1 of the phasing plan includes 31 lots. The Phasing Plan must be revised to show one of the 31 <br />lots as an Outlot in Phase 1 to be platted as a lot with Phase 2 and available for a building permit once <br />the secondary roadway connection is complete. <br /> The Phasing Plan must include a temporary cul‐de‐sac consistent with City design standards at the end <br />of the Phase 1 street. Add City detail 807B (temporary cul‐de‐sac) to the Preliminary Plan detail sheets. <br />6. The public streets are proposed at 28‐ft wide within a 60‐ft right‐of‐way. No Parking signs will be required <br />as part of the final construction plans to designate parking on one side, as determined by the Fire <br />Department and Public Works Director. <br />7. All streets must be designed to meet the City’s Engineering Design Standards, including cross slopes, <br />boulevard grades and utility easement grades. Surmountable concrete curb and gutter shall be installed <br />along the frontage of properties with future driveways and B618 curb installed along entrance roads. <br />8. Street intersections must connect at 90 degrees and maintain 50‐feet of tangent with maximum slopes of <br />2.5%. Residential maximum longitudinal grade is 6%. All cul‐de‐sacs must meet City design standards for <br />minimum diameter of 90‐feet, minimum right‐of‐way diameter of 120‐feet, and signed “No parking” <br />throughout. <br /> The Preliminary Plans must be revised to incorporate proposed street improvement Plan Sheets, <br />including vertical profiles meeting City design standards. Minimum vertical curve K‐values of K=19 <br />(crest) and K=37 (sag), including stop conditions. <br />9. The street connection to the Lake Elmo Heights neighborhood at Imperial Avenue will require the removal <br />of the existing cul‐de‐sac.
The URL can be used to link to this page
Your browser does not support the video tag.