My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#07 - Bridgewater Village DA
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
09-17-24
>
#07 - Bridgewater Village DA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2025 2:42:11 PM
Creation date
10/18/2024 2:23:16 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15 <br />LA515\137\947791.v5 <br />from Stillwater Way depicted and shaded gray in Exhibit C that is identified as <br />the Emergency and Construction Access Road; <br />2. A grading as-built plan approved by the City for Lot 2, Block 2 to include the <br />commercial buildings and all downstream drainage facilities; <br />3. All storm water drainage facilities that include and are downstream from Lot 2, <br />Block 2 are in place, meet the approved project plans, and are verified by the <br />City; and <br />4. The Developer has installed adequate parking, and sanitary sewer and municipal <br />water to Lot 2, Block 2. <br />C. The City will not issue a certificate of occupancy for any building on a Commercial <br />Lot until: <br />1. The Commercial Lot has paved street access, parking, and circulation and <br />meets all City Code requirements; <br />2. The Developer has installed all the curb and gutter and sidewalks in the <br />phase of the development in which the Commercial Lot is located; <br />3. The Developer has installed all storm water facilities for and adjacent to the <br />Commercial Lot and the storm water facilities down-stream from the <br />Commercial Lot: <br />4. All other building and City Code requirements, including but not necessarily <br />limited to, connection to sanitary sewer and water and all conditions and <br />improvements identified in paragraph 25 (A) above have been completed, <br />inspected, verified by as-built surveys, and approved and accepted by the <br />City. <br />D. Breach of the terms of this Agreement by the Developer, including nonpayment of <br />billings from the City, shall be grounds for denial of building permits, certificates of
The URL can be used to link to this page
Your browser does not support the video tag.