My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#07 - Bridgewater Village DA
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
09-17-24
>
#07 - Bridgewater Village DA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2025 2:42:11 PM
Creation date
10/18/2024 2:23:16 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 <br />LA515\137\947791.v5 <br />the City may draw down the Security at any time during the warranty period to perform the work <br />if the Developer fails to take corrective measures after being provided reasonable notice by the <br />City. <br />25. BUILDING PERMITS/CERTIFICATES OF OCCUPANCY. <br />A. The City will not issue any building permits for any lot within the Subdivision, or within <br />a completed phase of the Subdivision in a City preapproved phasing plan, until such <br />time that sanitary sewer, water, storm sewer, curbing and one lift of asphalt has been <br />installed and tested for all public streets; boulevard grading has been completed <br />within the entire right-of-way (without hold down grading for the future sidewalk or <br />any other improvements); street and traffic control signs are installed; property <br />monuments have been installed, grading as-built plans have been submitted and <br />approved by the City, and the Management Plan for the Stormwater Reuse Irrigation <br />System has been submitted and approved by the City. A “preapproved phasing <br />plan” is defined as a phased construction plan that has been submitted by the <br />Developer and approved by the City in advance of the preconstruction meeting for <br />the Subdivision. Once the construction has started, the City will not consider <br />revisions to the phasing plan for the purpose of issuing building permits. <br />B. The City may issue a building permit for Lot 2, Block 2 if authorized by the City <br />Community Development Director before the completion of the Subdivision <br />Improvements described in paragraph 25 (A) above. However, Lot 2, Block 2 shall <br />have the following in place before the City will allow construction of buildings on Lot <br />2, Block 2 to proceed: <br />1. Adequate safe public access for emergency services and contractors, including <br />a paved bituminous road to the building pad for any buildings which is sufficient <br />to allow construction to proceed, which may include a temporary bituminous road
The URL can be used to link to this page
Your browser does not support the video tag.