My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#07 - Bridgewater Village DA
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
09-17-24
>
#07 - Bridgewater Village DA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2025 2:42:11 PM
Creation date
10/18/2024 2:23:16 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br />LA515\137\947791.v5 <br />observation shall include, at the discretion of the City, part- or full-time inspection of proposed <br />public utilities and street construction. The City will bill for the services on an hourly basis. <br />The direction and review provided by the City through the inspection of the Subdivision <br />Improvements should not be considered a substitute for the Developer-required management of <br />the construction of the Subdivision Improvements. The Developer must require the Developer’s <br />contractor(s) to furnish the City with a schedule of proposed operations at least five days prior to <br />the commencement of construction for each type of Subdivision Improvement. The City shall <br />inspect all Developer-installed Subdivision Improvements during and after construction for <br />compliance with the Plans, the City approvals, the City Code, the City’s Engineering Design and <br />Construction Standards Manual, and the City’s Landscape and Irrigation Standards. The <br />Developer will notify the City at such times during construction as the City requires for inspection <br />purposes based on a schedule established for this purpose. Such inspection is pursuant to the <br />City’s governmental authority, and no agency or joint venture relationship between the City and <br />the Developer is thereby created. <br />9. CONTRACTORS/SUBCONTRACTORS. City Council members, City employees, <br />and City Planning Commission members, and corporations, partnerships, and other entities in <br />which such individuals have greater than a 25 percent ownership interest or in which they are an <br />officer or director may not act as contractors or subcontractors for the Subdivision Improvements <br />identified in paragraph 6 above. <br />10. TIME OF PERFORMANCE. Subject to unavoidable delays including adverse weather <br />conditions, the Developer shall install all required Subdivision Improvements by June 1, 2026. <br />The Developer may, however, request an extension of time from the City, and the City agrees to <br />grant a reasonable extension for delays. Such extension will not be the basis for placing the <br />Developer in default based on the schedule of improvements. If the City grants the time <br />extension, it shall be conditioned upon updating the Security or escrow posted by the Developer
The URL can be used to link to this page
Your browser does not support the video tag.