My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#16 - 2025 Street and Utility Improvements
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
09-17-24
>
#16 - 2025 Street and Utility Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2025 2:42:52 PM
Creation date
10/18/2024 2:23:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />TASK ORDER NO. 25 – 2025 STREET AND UTILITY IMPROVEMENTS Page 1 of 4 <br /> <br />TASK ORDER No. 25 <br />CITY OF LAKE ELMO, MINNESOTA – BOLTON AND MENK, INC. <br />PROFESSIONAL CONSULTING SERVICES AGREEMENT <br /> <br />In accordance with ARTICLE 1 of the Master AGREEMENT between the City of Lake Elmo (“CITY”) and <br />Bolton and Menk, Inc. (“ENGINEER”), dated MARCH 20, 2013 (“AGREEMENT”), the ENGINEER agrees <br />to provide Professional Consulting Support Services as follows: <br /> <br /> <br />2025 STREET AND UTILITY IMPROVEMENTS <br /> <br />PROJECT OVERVIEW: This Project includes Professional Engineering Services for the 2025 Street and <br />Utility Improvements, to be authorized in phases and beginning with preliminary design and <br />feasibility report support services. Upon completion of the preliminary design and feasibility report <br />support services, this Task Order may be later amended to authorize the preparation of plans and <br />specifications and/or construction phase support services as may be applicable. <br /> <br />The improvements include the rehabilitation of the public streets, consisting of approximately 8,000 <br />feet (1.5 miles) of local streets located in 6 neighborhoods as follows: <br /> <br /> Prairie Hamlet: 59th Street Circle North, from Keats Avenue to the west loop. <br /> Judith Mary Manor: 55th Street North, from 57th Street to the north cul‐de‐sac. <br /> Rolling Hills Estates: 57th Street North, from 55th Street to Julep Way. <br /> Lake Elmo Vista: Julep Way North, from 57th Street to the south cul‐de‐sac; and 55th Street <br />North, from Keats Avenue to the west cul‐de‐sac. <br /> Teal Pass Estates: Jasper Avenue North, from Jane Road to the north cul‐de‐sac; 49th Street <br />North, from Jasper Avenue to Jerome Avenue; and Jerome Avenue North, from 49th Street to <br />the east cul‐de‐sac. <br /> Irish Court North, from Lake Jane Trail to south end cul‐de‐sac. <br /> <br />The improvements will consist of either a full street reconstruction or full‐depth pavement <br />reclamation, to be determined through a detailed geotechnical investigation. New concrete curb and <br />gutter will be installed to replace the existing bituminous curb. In addition to the street <br />improvements, the storm sewer or drainage along each street will be reviewed and upgraded as <br />necessary to prevent water from standing on or along the street, and to repair or replace existing <br />storm sewer infrastructure as recommended through the preliminary design site investigations. <br /> <br />Due to the proximity to existing public watermains, the preliminary design will also include a <br />recommended layout and cost estimate to extend City water to serve each property along 59th Street <br />Circle (Prairie Hamlet); 55 Street (Lake Elmo Vista), and Irish Court. The preliminary cost estimates will <br />be presented to the property owners and City Council as part of the feasibility report for <br />consideration to incorporate watermain extensions in one or more area of the project. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.