My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#16 - 2025 Street and Utility Improvements
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
09-17-24
>
#16 - 2025 Street and Utility Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2025 2:42:52 PM
Creation date
10/18/2024 2:23:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />TASK ORDER NO. 25 – 2025 STREET AND UTILITY IMPROVEMENTS Page 2 of 4 <br /> <br />SERVICES TO BE PROVIDED BY ENGINEER: Bolton and Menk, Inc., Inc. shall provide the following <br />Professional Engineering Services: <br /> <br />1. Project management throughout the course of work for preparation of preliminary design <br />documents including a monthly PMT meeting, and submittal of a weekly progress memo and <br />job to date budget form. <br />2. Work with city staff to develop success criteria for the project, obtain project information and <br />formalize the budget and schedule. <br />3. Review of existing as‐built plans as made available by the CITY. <br />4. Site visit to review existing pavement conditions, drainage patterns and to define project <br />limits based on existing pavements. <br />5. Survey: Coordinate Gopher State One Call utility locates and perform topographic survey of <br />existing conditions within project limits for the purposes of preparing design documents. <br />6. Perform condition review of existing drainage and storm sewer systems, perform unconfined <br />visual observations, and make recommendations regarding additional storm sewer televising, <br />if needed. <br />7. Make recommendations of storm sewer repairs and new storm sewer improvements to be <br />completed as part of the project. <br />8. Review Geotechnical Report findings and recommendations obtained by the CITY. <br />9. Prepare preliminary design including street rehabilitation recommendations, watermain <br />layout, where applicable, and stormwater management. <br />10. Review County GIS maps and half section maps to review existing right‐of‐way and easements <br />within the project area. Identify right of way and easement needs to construct the proposed <br />infrastructure. <br />11. Identify any major utility conflicts related to the proposed preliminary design. <br />12. Identify permits required to complete the proposed work. <br />13. Prepare Preliminary Design Memorandum outlining the proposed scope of improvements and <br />a summary of the stormwater management plan for meeting watershed permit requirements. <br />14. Prepare opinion of probable cost based on the preliminary design layout. Project Costs shall <br />be categorized as directed by the CITY for the purpose of preparing preliminary assessment <br />calculations and for use in the feasibility report. Assessment calculations to be performed by <br />the CITY. <br />15. Prepare Exhibit(s) showing the proposed improvements for use in the Feasibility Report. <br /> <br />DELIVERABLES: <br /> Preliminary Plans in electronic format (PDF). <br /> Preliminary Opinion of Total Probable Project Costs. <br /> Preliminary Design Memorandum summarizing preliminary final design assumptions, <br />proposed scope of improvements, watershed management requirements and <br />mitigation measures, and other performance criteria incorporated into the project. <br /> Identification of easements needed for the construction of the Project. Preliminary <br />easement needs Exhibit(s), if needed. <br /> Feasibility Report Exhibit(s). <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.