Laserfiche WebLink
d) If the proposed PUD involves construction over two or more phases, the applicant has demonstrated that <br />each phase is capable of being a stand-alone development independent of other phases. <br />105.12.1080 Open Space PUD Review Procedure <br />All requests to establish an open space planned unit development shall be initiated by following the steps below: <br />a) PUD preliminary plan. <br />1) Pre-application conference. Before filing of an application for OP planned unit development with <br />the city, the applicant of the proposed OP planned unit development shall arrange for and attend a <br />conference with the planning community development director, city engineer and other city staff. <br />The primary purpose of the conference shall be to provide the applicant with an opportunity to <br />gather information and obtain guidance as to the general suitability of his proposal for the area for <br />which it is proposed and its conformity to the provisions of this subchapter before incurring <br />substantial expense in the preparation of plans, surveys and other data. No application for an open <br />space PUD preliminary plan will be accepted by the city unless an applicant's proposal is distinctly <br />similar to one reviewed by city staff in the required pre-application conference. <br />2) PUD preliminary plan submittal requirements. Except as may be waived by the director of <br />planning community development director, the following information shall constitute a complete <br />application for an open space PUD preliminary plan. <br />a. All required information for a preliminary plat per LEC 105.12.1200(c) and LEC <br />105.12.1210. <br />b. A separate open space PUD preliminary plan which includes the following information: <br />1. Administrative information including identification of the drawing as an open space <br />PUD preliminary plan, the proposed name of the project, contact information for <br />the developer and individual preparing the plan, signature of the surveyor and civil <br />engineer certifying the document, date of plan preparation or revision, and a graphic <br />scale and north arrow; <br />2. Area calculations for gross land area, wetland areas, right-of-way dedications, and <br />proposed public and private parks or open space and net land area for calculating <br />project residential density; <br />3. Existing zoning districts on the subject land and all adjacent parcels; <br />4. Layout of proposed lots with future lot and block numbers. The perimeter boundary <br />line of the subdivision should be distinguishable from the other property lines. <br />Denote outlots planned for public dedication and/or open space schools, parks, etc.; <br />5. The location of proposed septic disposal areas; <br />6. Area calculations for each parcel; <br />7. Proposed setbacks on each lot forming the building pad. and calculated buildable <br />area; <br />8. Proposed gross hardcover allowance per lot if applicable.; <br />9. Existing contours at intervals of two feet. Contours must extend a minimum of 200 <br />feet beyond the boundary of the parcels in question; <br />10. Delineation of wetlands, wetland buffers, and/or watercourses over the property; <br />11. Delineation of the ordinary high water levels of all water bodies; <br />12. Location, width, and names of existing and proposed streets within and <br />immediately adjacent to the subdivision parcel; <br />13. Easements and rights-of-way within or adjacent to the subdivision parcels; <br />14. The location and orientation of proposed buildings; <br />15. Proposed sidewalks and trails; <br />16. Vehicular circulation system showing location and dimension for all driveways, <br />parking spaces, parking lot aisles, service roads, loading areas, fire lanes, <br />emergency access, if necessary, public and private streets, alleys, sidewalks, bike <br />paths, direction of traffic flow and traffic control devices;