My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#10 - Washington County CIP Comments
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
10-15-24
>
#10 - Washington County CIP Comments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 4:34:43 PM
Creation date
2/20/2025 2:43:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIP 2025-2029 <br />Description <br />The project scope includes the following improvements to County State Aid Highway (CSAH) 15 (Manning <br />Avenue) from 30th Street to CSAH 14 (Stillwater Boulevard/40th Street South): <br />1) highway expansion from two-lane undivided to four-lane divided highway <br />2) construction of trails on both east and west side of highway <br />3) drainage improvements, including storm water treatment facilities <br />4) railroad crossing review <br />Preliminary design, along with public engagement, will determine the final project scope, right-of-way <br />acquisition required, and cost estimates. <br />The estimated cost is based on past per mile costs of similar improvements. <br />Justification <br />CSAH 15 is the backbone of the county's transportation system, thus, is an important north-south route <br />connecting Interstate 94 to Lake Elmo, Stillwater, and beyond. These highway improvements are necessary to <br />ensure the ongoing safe and efficient operation of this highway segment. <br />RB-2801 Expenditures <br />Account Name 2025 Budget 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Total <br />Planning/Design $0 $0 $0 $400,000 $400,000 $800,000 <br />Right-of-Way $0 $0 $0 $0 $400,000 $400,000 <br />$0 $0 $0 $400,000 $800,000 $1,200,000 <br />RB-2801 Funding Sources <br />Account Name 2025 Budget 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Total <br />Local Contributions $0 $0 $0 $100,000 $200,000 $300,000 <br />State Aid $0 $0 $0 $300,000 $600,000 $900,000 <br />$0 $0 $0 $400,000 $800,000 $1,200,000 <br />Budget Impact/Other <br />The project will increase operation and maintenance costs because of the added pavement widths and storm <br />water infrastructure. <br />Capital Project Category: Road & Bridge <br />Location: Various/Other <br />District: District 3 <br /> <br />Total Estimated Project Cost: $1,200,000 <br />Prior Year(s) Total Cost: <br />Project #: RB-2801 <br />Project Name: CSAH 15 - 30th Street to CSAH 14 <br />ϭϬϱ
The URL can be used to link to this page
Your browser does not support the video tag.