My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#10 - Washington County CIP Comments
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
10-15-24
>
#10 - Washington County CIP Comments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 4:34:43 PM
Creation date
2/20/2025 2:43:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIP 2025-2029 <br />Description <br />The project scope includes the following improvements at the intersection of County State Aid Highway <br />(CSAH) 10 (10th Street) and CSAH 17 (Lake Elmo Avenue). <br />1) improved intersection control- likely with a roundabout or signal <br />2) highway drainage and surface water management <br />3) pedestrian and bicycle facility improvements <br />Preliminary design along with public engagement will determine the final project scope, right-of-way <br />acquisition required, and cost estimates, which will be included in a future capital improvement plan. <br />Justification <br />Stillwater Public School District is planning to construct a new elementary school in the northwest corner of <br />CSAH 10 and CSAH 17. This new school will increase traffic volumes at this intersection, which is currently <br />controlled with all-way stop signs. <br />RB-2808 Expenditures <br />Account Name 2025 Budget 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Total <br />Planning/Design $400,000 $250,000 $0 $0 $0 $650,000 <br />Construction $0 $0 $0 $3,100,000 $0 $3,100,000 <br />Right-of-Way $0 $300,000 $0 $0 $0 $300,000 <br />$400,000 $550,000 $0 $3,100,000 $0 $4,050,000 <br />RB-2808 Funding Sources <br />Account Name 2025 Budget 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Total <br />Local Contributions $0 $100,000 $0 $500,000 $0 $600,000 <br />State Aid $0 $450,000 $0 $2,400,000 $0 $2,850,000 <br />Planned Use of Fund Balance-R&B $400,000 $0 $0 $0 $0 $400,000 <br />TAA - Other $0 $0 $0 $200,000 $0 $200,000 <br />$400,000 $550,000 $0 $3,100,000 $0 $4,050,000 <br />Budget Impact/Other <br />This project will increase operation and maintenance costs because of the added infrastructure. <br />Capital Project Category: Road & Bridge <br />Location: Lake Elmo <br />District: District 3 <br /> <br />Total Estimated Project Cost: $4,050,000 <br />Prior Year(s) Total Cost: <br />Project #: RB-2808 <br />Project Name: CSAH 10 and CSAH 17 Intersection <br />ϭϭϭ
The URL can be used to link to this page
Your browser does not support the video tag.