Laserfiche WebLink
CIP 2025-2029 <br />Description <br />The project scope includes an annual program comprised of pavement preservation projects including: <br />1) seal coating <br />2) crack filling <br />3) pavement milling <br />4) overlays <br />5) hot and cold-in-place recycling <br />6) pavement reclamation <br />7) full-depth reclamation <br />8) minor subgrade corrections <br />9) right-of-way <br />2025 may include: <br />1) CSAH 13 (Inwood Avenue North) - CSAH 10 to CSAH 6 <br />2) CSAH 15 (Manning Avenue North) - TH 36 to 80th Street <br />3) CSAH 25 (Century Avenue South) - South Century Avenue to Brookview Drive East <br />Justification <br />These projects are scheduled to interrupt the normal deterioration of highways to extend the pavement life. <br />Pavement condition is measured/calculated annually and reported as the system-wide Pavement Condition <br />Index (PCI) that assigns a value to each roadway segment on a scale of 1-100, with higher numbers equating <br />to better pavement condition. Public Works Performance Measures set two goals: 1) system-wide average PCI <br />= 72 or greater, and 2) no roadway PCI should be lower than 40. <br />RB-2204 Expenditures <br />Account Name 2025 Budget 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Total <br />Planning/Design $300,000 $300,000 $300,000 $300,000 $300,000 $1,500,000 <br />Construction $6,350,000 $6,900,000 $5,300,000 $6,850,000 $8,150,000 $33,550,000 <br />$6,650,000 $7,200,000 $5,600,000 $7,150,000 $8,450,000 $35,050,000 <br />RB-2204 Funding Sources <br />Account Name 2025 Budget 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Total <br />State Aid $150,000 $2,050,000 $150,000 $1,800,000 $2,750,000 $6,900,000 <br />Wheelage Tax $2,950,000 $2,950,000 $2,950,000 $2,850,000 $3,000,000 $14,700,000 <br />County Transportation Sales Tax (Road & Bridge)$0 $0 $0 $0 $100,000 $100,000 <br />TAA - Preservation $3,050,000 $2,200,000 $2,500,000 $2,500,000 $2,600,000 $12,850,000 <br />TAA - Other $500,000 $0 $0 $0 $0 $500,000 <br />$6,650,000 $7,200,000 $5,600,000 $7,150,000 $8,450,000 $35,050,000 <br />Budget Impact/Other <br />Projects completed under the Pavement Preservation Program reduce operation and maintenance costs. <br />Capital Project Category: Road & Bridge <br />Location: Various/Other <br />District: Multiple <br /> <br />Total Estimated Project Cost: $35,050,000 <br />Prior Year(s) Total Cost: <br />Project #: RB-2204 <br />Project Name: Pavement Preservation & Rehab <br />ϳϬ