Laserfiche WebLink
NOW, THEREFORE, BE IT RESOLVED THAT the City Council does hereby approve the 10a' <br />and Lake Elmo School Addition Final Plat request subject to the following conditions: <br />1. The Applicant must enter into a Development Agreement, in the City's standard form, prior <br />to issuance of a notice to proceed or any building permit for work on site. <br />2. Prior to the City signing or approving recording of the Final Plat or Development <br />Agreement, the Applicant shall fully address all continents in the following review memos, <br />or any subsequently revised memo, to the satisfaction of the City: <br />a. City Engineer's memo dated January 29, 2025, <br />b. City Landscape Architect's memo dated December 13th 2024, <br />c. City Fire Chief s memo dated December 41h 2024. <br />d. City Attorney's Plat Opinion dated December 201h, 2024. <br />e. Washington County Engineering memos dated September 18, 2024 and January 3, <br />2025. <br />3. The Applicant may not allow any queuing of traffic accessing this site from occurring on the <br />abutting Lake Elmo Avenue (CSAH 17) and loth Street (CSAH 10). <br />4. The applicant must provide, at applicant's sole cost, dedicated right and left turn lanes along <br />Lake Elmo Avenue (CSAH 17) and loth Street (CSAH 10), at both new access locations. <br />Turn lanes must be constructed meeting Washington County standards. <br />5. The Applicant must provide a separate trail connection along the Lake Elmo Avenue North <br />Corridor. <br />6. The Applicant must provide at applicant's sole cost, Traffic Control Improvements to be <br />operational with the opening of the school, including a permanent traffic control signal at the <br />new access location along 1 Oth Street North (CSAH 10), complete with crosswalks, and <br />including a temporary wood -pole traffic signal at the intersection of Lake Elmo Avenue <br />(CSAH 17) and loth Street (CSAH 10), complete with crosswalks. The applicant must enter <br />into a cost reimbursement agreement to reimburse the County for design and construction <br />related engineering services for these improvements. <br />7. The Plat must dedicate right-of-way along Lake Elmo Avenue (CSAH 17) and 1 Oth Street <br />(CSAH 10) as required by Washington County and the City. <br />8. All easements as required by the City Engineer and Public Works Director shall be <br />documented on the Final Plat prior to the release of the Final Plat for recording. <br />9. The Final Plat shall not be recorded until the City approves the Final Construction Plans. <br />10. The City will require a cost participation from the Applicant at no more than 50% of the <br />City's cost for the applicant's cost -share of the future intersection improvements at Lake <br />Elmo Avenue (CSAH 17) and loth Street (CSAH 10). <br />11. The Applicant shall provide stormwater management mitigation for all required site <br />improvements, including the County roadway and intersection improvements, County <br />roadway turn lanes, all bituminous trails, and including additional future impervious <br />surfaces, as estimated by Washington County, for the future County roadway improvements <br />along CSAH 17 and CSAH 10 to be constructed by the County at a firture date. <br />12. The storm water management facilities and BMPs will remain privately owned and <br />maintained. A Storm Water Maintenance and Easement Agreement in the City's standard <br />