My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-015
LakeElmo
>
City Council
>
Resolutions (1970's to 2020)
>
2020's
>
2025
>
2025-015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2025 2:11:13 PM
Creation date
3/12/2025 3:51:51 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
form of agreement must be executed and recorded with the Final Plat for all privately owned <br />stonnwater facilities. <br />13. The Applicant shall pay an in -lieu fee of $325 per caliper inch for umnitigated tree removal <br />on site, up to a total of $50,000 <br />14. The Applicant shall not locate any proposed tree plantings south of the bituminous trail <br />proposed at the southeast corner of the site. <br />15. The Applicant shall provide a planting plan for 106 additional trees on site, with flexibility <br />to tree species and size and without a requirement for irrigation or warranty after <br />installation. The planting plan must be approved by the City. <br />16. Any intensification of the use or expansion of the use within the buffer area of the Oakdale <br />Gun Club shall comply with Minnesota State Statutes Chapter 87A, as may be amended. <br />17. After establishment of the use on site, any grading or removal of healthy specimen trees in <br />required buffer areas, including the buffer of the Oakdale Gun Club, shall be reviewed by <br />the City against applicable design standards. <br />18. Upon substantial completion of the project, as defined in the required development <br />agreement, the school building must be connected to City water and sewer. <br />19. The Applicant must provide plans for the water and sewer connection to the satisfaction of <br />the City Engineer, Public Works Director, and Fire Chief prior to the release of the building <br />permit with connections made at the Applicant's sole cost. <br />20. Water and Sewer Availability Charges, and other fees as applicable, must be paid prior to <br />issuance of a building pen -nit. <br />21. The Applicant will be required to sign a Waiver of Assessment Agreement with the City of <br />Lake Elmo, in the City's standard form of agreement, to reimburse the City for public <br />sanitary sewer improvements to be constructed by the City to facilitate the connection to <br />City sewer. <br />22. All city, state, or other necessary permits must be obtained prior to the release of the <br />building permit. <br />23. Substantial construction must take place within 12 months of the date on which the <br />conditional use pen -nit was granted or the conditional use permit is void. The Applicant <br />must also comply with provisions of City Code Section 105.12.290 Conditional Use <br />Permits. <br />Passed and duly adopted this 4th day of February 2025 by the Lake Elmo Minnesota City Council. <br />Charles Cadenhead, Mayor <br />A TEST: <br />Jute ohns n ity Clerk <br />
The URL can be used to link to this page
Your browser does not support the video tag.