My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#16 - UP Railroad At-Grade Crossing Agreement
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
11-19-24
>
#16 - UP Railroad At-Grade Crossing Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 4:34:06 PM
Creation date
4/1/2025 11:59:27 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. The Agreement includes provisions addressing requirements for City contractors involved in any <br />portion the project construction, including minimum requirements for insurance, contractor’s right- <br />of-entry agreement, and UPRR notification and coordination. <br />6. The City must pay an annual perpetual maintenance fee to the Union Pacific Railroad in the amount <br />of $11,408 for the At-Grade Crossing Signal System. <br />7. The City must pay an annual perpetual maintenance fee to the Union Pacific Railroad in the amount <br />of $3,322 for the surface maintenance between track tie ends. <br /> <br />FISCAL IMPACT: The Total Estimated Project Cost is $1,418,000, including $1,065,200 for the At- <br />Grade Roadway Crossing and $352,800 for the Trunk Watermain Crossing. The City would also be required <br />to pay annual maintenance fees to the Union Pacific Railroad in the amount of $14,730. The Finance <br />Director will determine funding sources for the project at a later date. Street projects are paid for with levy- <br />funded debt or cash. Water projects are paid for with enterprise-funded debt or cash. A portion of the <br />improvements would be offset by “Railroad Crossing Improvement” fees collected from adjacent <br />developments. <br /> <br />RECOMMENDATION: Staff is recommending that the City Council approve, as part of the consent <br />agenda, the Union Pacific Railroad Public Highway At-Grade Crossing Agreement, Project No. 0787250, <br />for the Village Parkway UPRR Crossing Improvements. If removed from the consent agenda, the <br />recommended motion for this action is as follows: <br /> <br />“Move to approve the Union Pacific Railroad Public Highway At-Grade Crossing Agreement, Project <br />No. 0787250, for the Village Parkway UPRR Crossing Improvements.” <br /> ATTACHMENTS: <br /> <br />1. Total Estimated Project Cost dated November 2024. <br />2. Union Pacific Railroad Public Highway At-Grade Crossing Agreement (Project No. 0787250) <br />and Exhibit A (Crossing Location Map). <br />3. Not Attached but available upon request. <br />a. Exhibit A-1 City Construction Plans, Sheets 1-20, as prepared by SEH, Inc. <br />b. Exhibit B. UPRR Standard Agreement Conditions and Covenants. <br />c. Exhibit C. UPRR Force Account Estimate for Crossing Signal (Estimate is $334,245) and <br />Track Surface Improvements (Estimate is $200,048). <br />d. Exhibit D. Contractor’s Right-of-Entry Agreement. <br />e. Exhibit E. Signal Design Schematic. <br />f. Exhibit F. Annual Signal Maintenance Cost Estimate (Estimate is $11,408).
The URL can be used to link to this page
Your browser does not support the video tag.