Laserfiche WebLink
VILLAGE PARKWAY UPRR CROSSING IMPROVEMENTS <br />PROJECT NO. 2019.122 <br />CITY OF LAKE ELMO, MINNESOTA <br />DATE: NOVEMBER 2024 <br />ENGINEER'S OPINION OF PROBABLE COST VILLAGE  <br />PARKWAY <br />TRUNK  <br />WATERMAIN TOTAL PROJECT <br />Estimated TOTAL Construction Cost $335,000 $220,000 $555,000 <br />Contingencies at 10% $33,000 $22,500 $55,500 <br />Easement Acquisition (UPRR Easement) $25,200 $16,800 $42,000 <br />Engineering Services: Preliminary and Final Design $70,000 $45,000 $115,000 <br />Engineering Services: Construction Administration: $21,000 $14,000 $35,000 <br />Construction Observation: $15,000 $10,000 $25,000 <br />Geotechnical Engineering: $6,000 $4,000 $10,000 <br />Legal, Fiscal and Administration: $10,000 $7,000 $17,000 <br />Estimated UPRR Signal Improvements $335,000 $335,000 <br />Estimated UPRR Surface Crossing Improvements $200,000 $200,000 <br />Estimated UPRR Track Monitoring Costs (Est. Pending) $15,000 $10,000 $25,000 <br />UPRR Pipeline Crossing Permits and License Fees $3,500 $3,500 <br />Total Estimated Project Cost: $1,065,200 $352,800 $1,418,000 <br />Annual UPRR Signal Maintenance Cost (at $278.25 per Unit: 41 Units) $11,408 <br />Annual UPRR Surface Maintenance Cost $3,322