My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#18 - ISD 834 Utility Improvements Public Hearing
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
11-19-24
>
#18 - ISD 834 Utility Improvements Public Hearing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 4:34:06 PM
Creation date
4/1/2025 11:59:35 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />TASK ORDER NO. 24: AMENDMENT #1 – STILLWATER AREA SCHOOL DISTRICT UTILITY IMPROVEMENTS Page 1 of 5 <br /> <br />TASK ORDER No. 24 AMENDMENT #1 <br />CITY OF LAKE ELMO, MINNESOTA – BOLTON AND MENK, INC. <br />PROFESSIONAL CONSULTING SERVICES AGREEMENT <br /> <br />In accordance with ARTICLE 1 of the Master AGREEMENT between the City of Lake Elmo (“CITY”) and <br />Bolton and Menk, Inc. (“ENGINEER”), dated MARCH 20, 2013 (“AGREEMENT”), the ENGINEER agrees <br />to provide Professional Consulting Support Services as follows: <br /> <br />STILLWATER AREA SCHOOL DISTRICT UTILITY IMPROVEMENTS <br /> <br />PROJECT OVERVIEW: This Project includes Professional Engineering Services in support of the City <br />Engineer for improvements to connect the Oak‐Land Middle School to public water and sewer and to <br />connect the new Lake Elmo Elementary School to public sewer. <br /> <br />Task Order No. 24 included engineering services in support of the preliminary design and feasibility <br />report to identify the scope of improvements to be constructed by the City. <br /> <br />This Amendment #1 to Task Order No. 24 has been prepared to adjust the scope, fee, schedule and <br />deliverables for the design and construction phase engineering services for the recommended <br />improvements. <br /> <br />The sanitary sewer connection improvements would include a gravity sewer service from Oak‐Land <br />Middle school to the Royal Golf Club (RGC) lift station located at the intersection of Palmer Drive and <br />10th Street (CSAH 10). The lift station would be upgraded to accommodate the future flows of <br />approximately 150 additional REC units. The existing force main along 10th Street is proposed to be <br />upsized to accommodate the additional flows. At the intersection of Lake Elmo Avenue (CSAH 17) and <br />10th Street (CSAH 10), the existing force main from the RGC lift station would be disconnected from <br />the Old Village 16‐inch force main and would be routed south along Lake Elmo Avenue with a new <br />discharge connection at 5th Street. The new Lake Elmo Avenue force main would be sized to also <br />accommodate the discharge from a new lift station serving the proposed Lake Elmo Elementary School <br />to be located at Lake Elmo Avenue (CSAH 17) and 10th Street (CSAH 10). <br /> <br />The watermain connection improvements would include the extension of public watermain from the <br />intersection of Palmer Drive and 10 Street (CSAH 10) to the Oak‐Land Middle School property. <br /> <br />The services outlined in this Amendment #1 to Task Order No. 24 are intended to assist the City to <br />complete the design, including the preparation of plans and specifications and contract documents, <br />bidding phase services, and construction phase support services, including construction administration <br />and observation, as detailed in this Amendment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.