My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#19 - Roers LE Multifamily Final Plat
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
11-19-24
>
#19 - Roers LE Multifamily Final Plat
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 4:34:06 PM
Creation date
4/1/2025 11:59:44 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> PAGE 2 of 2 <br />9. A Stormwater Management Maintenance and Easement Agreement in the City’s standard form of <br />agreement must be executed and recorded with the Final Plat for all privately owned stormwater facilities. <br />Easement areas must incorporate the 100‐year high water level, maintenance access roadways, <br />maintenance benches, and to protect all overland emergency overflow locations and flow paths. Easement <br />revisions may be necessary to reflect any revisions to the grading plans as may be necessary to obtain City <br />and watershed construction plan approval. <br />10. Final Plat approval must be contingent upon the applicant providing to the City all off‐site permanent or <br />temporary construction easements required to construct the subdivision improvements. <br />11. Written permission or permit must be acquired and provided to the City prior to construction plan approval <br />for any proposed work or encroachment in the existing gas Main easement and MnDOT right‐of‐way. <br /> <br />FINAL CONSTRUCTION PLANS & SPECIFICATIONS <br />1. Final Construction Plans and Specifications must be prepared in accordance with the latest version of the <br />City Engineering Design Standards Manual dated January 2022, using City standard details, plan notes and <br />specifications and meeting City Engineering Design Guidelines, unless otherwise approved by the City. <br />2. Final Construction Plans and Specifications must be revised to fully address all comments detailed in the <br />Construction Plan review memorandum dated November 1, 2024. <br />3. Final Plat approval must be contingent upon the applicant completing improvements to Hudson Boulevard <br />as part of the subdivision improvements. The Hudson Boulevard Improvements must be completed in <br />conformance with the Hudson Boulevard Design Standards, with an Urban section on the north boulevard <br />with a bituminous trail across the full frontage of the development parcel. Revisions to the Hudson <br />Boulevard construction plans will be required to reflect the improvements completed along Hudson <br />Boulevard by the City in 2024. <br />4. The subdivision improvements are subject to a storm water management plan (SWMP) meeting State, <br />Valley Branch Watershed District (VBWD) and City rules. The SWMP will be required to accommodate all <br />site improvements and all public improvements needed to support the development of the property, <br />including the required improvements along Hudson Boulevard. Storm water facilities proposed as part of <br />the development to meet State and watershed permitting requirements must be constructed in accordance <br />with the City Engineering Design Standards Manual dated January 2022, whether the facilities are public or <br />privately owned and maintained. <br />5. Public watermain and sanitary sewer are available to serve the subdivision with existing utilities located in <br />the right‐of‐way along Hudson Boulevard and Julia Avenue. The developer will be responsible for all costs <br />to extend utilities within and throughout the subdivision to fully serve each proposed lot. Hydrant locations <br />and system valves must be placed internal to the site as directed by the Lake Elmo Public Works and Fire <br />Departments. All internal site hydrants, and watermains feeding any hydrant, will remain City owned and <br />operated. No utility pipe oversize costs are anticipated for this development. <br />6. Small/dry private utility corridors must be provided/preserved along all public roadway frontage (Hudson <br />Boulevard and Julia Avenue) with a minimum width of 10‐feet. The small/dry private utility corridors must <br />remain free from all encroachments and be graded at City standard boulevard grades of 4%, unless <br />otherwise approved by the City Engineer. Prohibited encroachments include, but are not limited to trees, <br />landscaping, fences, retaining walls, and building structures. <br />7. The Final Construction Plans must include a construction parking and staging plan internal to the <br />development site. No parking or any construction staging, including the loading and unloading of materials <br />and equipment will be allowed at any time on Hudson Boulevard or Julia Avenue during the construction of <br />the site improvements and buildings, unless specifically allowed through right‐of‐way permit or during city <br />approved roadway closures. All street, curb and boulevard damage caused by the construction activities <br />must be repaired or replaced by the developer(s) at no cost to the city and must meet city design standards <br />and specifications. <br />8. No construction on the Project may begin until the applicant has received City Engineer approval for the <br />Final Construction Plans; the applicant has obtained and submitted to the City all applicable permits, <br />easements and permissions needed for the project; and a preconstruction meeting has been held by the <br />City’s engineering department.
The URL can be used to link to this page
Your browser does not support the video tag.