My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#20 - Easton Village 7th Addition DA Amendment
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
11-19-24
>
#20 - Easton Village 7th Addition DA Amendment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 4:34:05 PM
Creation date
4/1/2025 12:01:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
grading plans. Within 30 days after completion of the grading, the Developer shall provide the <br />City with an "as built" grading plan and a certification by a registered land surveyor or engineer <br />as required in the City's Engineering Design and Construction Standards Manual. <br />18. STREET AND UTILITY IMPROVEMENTS. All storm sewers, sanitary sewers, water <br />main, and streets, including turn lane and intersection improvements, shall be installed in <br />accordance with the approved Plans, the City approvals, the City Code, and the City's <br />Engineering Design and Construction Standards Manual. Curb and gutter, the first lift of the <br />bituminous streets, sidewalks, boulevards graded, street signs installed, and all restoration work <br />on the site shall be completed in accordance with the approved Plans. Once the work is <br />completed, the Developer or the Developer's representative shall submit a written request to the <br />City asking for an inspection of the initial improvements. The City will then schedule a walk- <br />through to create a punch list of outstanding items to be completed. Upon receipt of the written <br />punch list provided by the City, the punch list items must be completed by the Developer and <br />the City notified to re-inspect the improvements. The final bituminous wear course shall be <br />installed by the Developer after the first bituminous course has weathered a winter season. <br />Before the placement of the final bituminous wear course, the Developer shall repair or replace <br />all broken or failing curbs, sidewalks and damaged or settled streets as determined by the City <br />from a pre-wear course walk through inspection. <br />19. LANDSCAPING AND TREE REPLACEMENT IMPROVEMENTS. <br />A. The Developer agrees to install landscaping in accordance with the approved <br />Plans, the City approvals, the City Code, the City's Engineering Design and <br />Construction Standards Manual, and the City's Landscape and Irrigation <br />Standards. All landscaping materials such as trees, shrubs, grasses, or other <br />vegetation installed by the Developer must be warrantied and maintained for a <br />period of two years. The two year warranty period shall be deemed to start once <br />10
The URL can be used to link to this page
Your browser does not support the video tag.