Laserfiche WebLink
    PAGE 4 of 4  <br />8. Per city requirements all storm sewer pipe easements must be a minimum 30‐feet in width. No structure  <br />or patio encroachments are allowed within the storm sewer easements.  <br />9. Storm water ponding adjacent to roadway corridors may not encroach the right‐of‐way or small utility  <br />easement corridors along either side of all right‐of‐way.  <br />  <br />MUNICIPAL WATER SUPPLY  <br />1. Municipal water supply is not readily available to the site. Watermain must be extended to the site as part  <br />of the subdivision improvements with connections in two locations such that the water system network is  <br />looped as part of the early phases of development. This will require the developer to obtain easements  <br />from adjacent property owners to facilitate the project in advance of contiguous development.  <br />2. Watermain distribution lines and connections will be required wherever reasonably possible to create a  <br />looped network throughout the proposed subdivision and as the project is phased.  <br />3. A watermain stub will be required to extend to the western plat boundary for future (or initial subdivision  <br />improvements) extension along 5th Street North. Watermain will also need to be stubbed to the northern  <br />plat boundaries at Limerick Parkway and potentially 3rd Street Ct N.  <br />4. The  developer  will  be  responsible  to  place  hydrants  and  water  system  valves  internal  to  the  site  as  <br />determined by the Lake Elmo Public Works Director and Fire Department.   <br />5. Minimum 30‐foot easements centered over the pipe/hydrant will be required when not located within the  <br />public right‐of‐way. Easements  must  be free from all encroachments, including retaining walls, trees,  <br />fences, small/dry utilities, or storm water management BMPs. Easements must be dedicated to the city as  <br />part of the plat. Dedicated watermain easements must be shown on all site, grading, utility, and landscape  <br />plans when submitting a Preliminary and Final Plat application.  <br />  <br />MUNICIPAL SANITARY SEWER  <br />1. Municipal sanitary sewer is not readily available to serve this site. Sanitary sewer must be extended to the  <br />site from the existing 24‐inch sanitary sewer located along Hudson Boulevard on the east side of the  <br />Stillwater  Bus  facility.  The  extension  must  be  completed  as  part  of  the  proposed  subdivision  <br />improvements in accordance with the previously approved design for Four Corners 2nd Addition.   <br />2. The  developer  will  be  responsible  to  extend  sanitary  sewer  service  to  the  site  and  throughout  the  <br />development at the developer’s sole cost to service each platted lot/parcel. A sanitary sewer main must  <br />also be stubbed to the plat limits for future extension by each adjacent parcel, including Cimarron and the  <br />Oak‐Land Middle School.  <br />3. All public sanitary sewer mains placed within the development will require minimum 30‐foot easements  <br />centered over the pipe/structure and be dedicated to the city as part of the final plat, if not located within  <br />a  public  right‐of‐way.  Dedicated  utility  easements  must  be  shown  on  all  site,  grading,  utility,  and  <br />landscape plans, and remain free from encroachments, including retaining walls, trees, fences, small/dry  <br />utilities, or storm water management BMPs.  <br />  <br />  <br />  <br />  <br />