My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#14 - 2025-2034 Capital Improvement Plan
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
12-17-24
>
#14 - 2025-2034 Capital Improvement Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 4:30:21 PM
Creation date
4/1/2025 12:26:34 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Turnout <br />Gear <br />Replacement <br />2025 thru 2034 <br />Fire Dept - Detail <br />Lake Elmo, MN <br />Project #F-018 <br />Project Name Turnout Gear Replacement <br />Contact Fire Chief Department Fire Department <br />Category Equipment: Fire Equip Priority 1 Critical <br />Status Active Useful Life 10 years <br />Make GLOBE Year 2019 <br />Description <br />Replacement of 35 sets of turnout gear (Jacket, Pants, Particulate Hood and Boots). <br />Justification <br />Per NFPA 1971, turnout gear is required to be retired and taken out of service after 10 years. The requested sets of turnout gear, additional hoods and boots include the enhanced safety features available through the 2018 NFPA <br />1971 standard. New safety features include, less water absorption by the turnout gear outer shell, a particle protection barrier on hoods, and better ergonomic design of turnout gear to minimize gaps in protection. The benefit of <br />acquiring this funding will greatly increase the safety of our firefighters during all types of incidents and drills requiring structural firefighting turnout gear. <br /> <br />Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total <br />Equip/Vehicles/Furnishings 0 0 0 0 0 0 0 192,500 0 0 192,500 <br />Total 0 0 0 0 0 0 0 192,500 0 0 192,500 <br />Funding <br />Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total <br />Fire Equipment & Projects Fund 0 0 0 0 0 0 0 192,500 0 0 192,500 <br />Total 0 0 0 0 0 0 0 192,500 0 0 192,500 <br />Produced Using Plan-It CIP Software
The URL can be used to link to this page
Your browser does not support the video tag.