My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#14 - 2025-2034 Capital Improvement Plan
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
12-17-24
>
#14 - 2025-2034 Capital Improvement Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 4:30:21 PM
Creation date
4/1/2025 12:26:34 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Equipment <br />Decon <br />Cleaning <br />System <br />2025 thru 2034 <br />Fire Dept - Detail <br />Lake Elmo, MN <br />Project #F-021 <br />Project Name Equipment Decon Cleaning System <br />Contact Fire Chief Department Fire Department <br />Category Equipment: Fire Equip Priority 1 Critical <br />Status Active Useful Life 20 years <br />Description <br />Equipment decon cleaning system cleans all protective gear and steel, composite, rubber, fabric, plastic equipment in a mechanical, self-contained process. This equipment is permanently installed in the decon room of the fire <br />station. This system offers a quick, easy and safe method of cleaning protective gear in a sealed compartment. This ergonomic process minimizes manual contact with contaminated materials. <br />Justification <br />Exposure to hazardous chemicals and carcinogens is a well known health risk for firefighters. Studies have shown that they run a significantly higher risk of being diagnosed with various forms of cancer than the general population. <br />To reduce this dangerous exposure it is essential to thoroughly, safely and efficiently clean and decontaminate all protective equipment after every use. Cleaning gear with and equipment decon cleaning system, significantly <br />reduces the exposure to cancer causing PAH particles and supports a safer work environment for staff. <br />Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total <br />Equip/Vehicles/Furnishings 40,000 0 0 0 0 0 0 0 0 0 40,000 <br />Total 40,000 0 0 0 0 0 0 0 0 0 40,000 <br />Funding <br />Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total <br />Fire Equipment & Projects Fund 40,000 0 0 0 0 0 0 0 0 0 40,000 <br />Total 40,000 0 0 0 0 0 0 0 0 0 40,000 <br />Produced Using Plan-It CIP Software
The URL can be used to link to this page
Your browser does not support the video tag.