Laserfiche WebLink
SOUTH WATER TREATMENT PLANT AND WELL 6 <br />CITY OF LAKE ELMO <br />SWIFT Contract 237685 Grant Amount:$110,000 <br />Expiration Date: 31-Dec-25 <br />PRELIMINARY DESIGN SITE INVESTIGATIONS - PHASE 2 <br />DATE: JULY 2025 <br />PROJECT MANAGEMENT/COORDINATION AND CITY REPRESENTATION (Bolton & Menk) $24,000 <br />TOPOGRAPHIC SURVEY & EXISTING CONDITIONS MAPPING (Stantec) $27,000 <br />WETLAND DELINEATION (Stantec) $18,000 <br />GEOTECHNICAL INVESTIGATIONS (see attached Braun Proposal with 10% contingency) $53,000 <br />PRELIMINARY SITE AND UTILITY LAYOUT (Stantec) $13,000 <br />TEST WELL CONSTRUCTION FOR WELL 6 $175,000 <br />Estimated Test Well Construction (Well Contractor - TBD) $125,000 <br /> Estimated Costs related to 2,500 LF temprary discharge pipe to redirect well <br />development and test pumping dishcares due to PFAS $20,000 <br />Engineering Services: Design (Stantec) $13,000 <br />Engineering Services: Construction Services (Stantec) $17,000 <br />Estimated TOTAL Preliminary Design Site Investigation Costs $310,000 <br />Estimated TOTAL Costs paid direclty by City (Test Well 6) $155,000 <br />Estimated TOTAL Grant Amendment Amount $265,000 <br />Contrant Time Extension Request 31-Mar-26