My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#17 - Rescue 1 Hose Storage and Equipment Refurbish
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
01-07-25
>
#17 - Rescue 1 Hose Storage and Equipment Refurbish
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 2:08:44 PM
Creation date
8/4/2025 2:08:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lake Elmo MN R1 14674 <br />Work to be Quoted to customer <br />Front bumper-Re do gravel shield to accommodate 200’ of 1 ¾” fire <br />hose and 200’ of 2 ½” both on swivel chicksands. This will require <br />different bumper extensions as well as new lid . 20 hr <br />L1- Remove current crosslay hose storage ,li le giant ladder framing <br />,and divider wall providing storage for unused floa ng backboard. <br />Provide and install self latching slide master pull out shelf half depth <br />of the transverse compartment and as wide as allowable mounted on <br />raised por on of comp . Provide and install a slide master out and <br />down shelf as wide and deep as compartment will allow (turtle le <br />both trays ). Provide a means to store two brooms , two shovels ,two <br />new York hooks in upper le por on of compartment. 13 hr <br />L2- Customer would like a price on a CTECH tool box and installa on <br />in lower le corner of compartment replacing current box. The <br />compartment currently has two adjustable shelves we would flip <br />these over and mount out and down shelves with trays and turtle le <br />. The larger of the two li le giant ladders will be moved to the far <br />right side of L2 and the exis ng tool board will be adjusted to <br />accommodate this . 13hr <br />R1- Remove crosslay hose storage , remove cribbing struts and <br />divider they are mounted to, same as L1. Provide and install half <br />body depth latching slide master with tray (turtle led) with <br />sta onary tool board mounted to the tray (right side ). Storage of <br />same combined tools as L1 (brooms ,NY hooks ,shovels ). The Axe , <br />sledge hammer and possibly hi li jack from the front of the tool <br />board in R2 will be relocated to the new sta onary tool board <br />mounted to the slide master tray right side . 14 hr
The URL can be used to link to this page
Your browser does not support the video tag.