My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#17 - Rescue 1 Hose Storage and Equipment Refurbish
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
01-07-25
>
#17 - Rescue 1 Hose Storage and Equipment Refurbish
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 2:08:44 PM
Creation date
8/4/2025 2:08:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R2- Remount large cribbing struts originally in R1/L1 to the exis ng <br />gear grid tool board or front wall what ever works be er , also <br />improve exis ng strut mounts to save space and ease of use . 10 hr <br />Add a addi onal 15hr for extra fabrica on of unknown parts <br />1.Two half body depth slide master latching slide out trays <br />(L1/R1). Es mated @ $2800 for both together. <br />2.One slide master out and down tray compartment width <br />“unknown depth”. L1 Es mated @ $660 <br />3.Two out and down slide master shelves replacing L2 adjustable <br />shelves . Es mated @ $1300 for both together. <br />4.Poten al Ctech tool box replacing current cra sman box (L2) <br />$2200 <br />Es mated labor Hours totaling: 85 @ $185.00 = $15,725 <br />Es mated purchase parts totaling: $6960.00. <br />Es mated Materials cost totaling: $4000.00. <br />Es mate total: $26,685.00 this is subject to change once we get exact <br />measurements for the slides and out and downs.
The URL can be used to link to this page
Your browser does not support the video tag.