Laserfiche WebLink
A <br />B <br />C <br />D <br />H <br />G <br />E <br />F <br />JI <br />L <br />K <br />M <br />O <br />P <br />N <br />Q <br />S <br />R <br />EMERGENCY SPILL KIT <br />123456 <br />A <br />B <br />C <br />D <br />ERDC PFAS DESTRUCTION RESEARCH <br />PHASE II <br />3445 IDEAL AVE N, LAKE ELMO, MN <br />SECONDARY <br />CONTAINMENT <br />DESIGN <br />JRC <br />JRC DATE <br />DRAWN BY <br />CHECKED BY <br />APPROVED BY <br />DATE SHEET <br />DWG NO. <br />DATE <br />PROJ. NO.J230044 <br />ERDC C-05 <br />REV REVISION DESCRIPTION BY CHK APP C-05 <br />TEMPORARY FENCE LINE <br />LEGEND <br />GENERAL NOTES: <br />1. GRAVEL ROAD, FIRE HYDRANT, AND SITE LIMIT LOCATIONS GATHERED WITH A EOS ARROW GOLD GPS UNIT <br />2. SITE LIMITS DEFINED BY A CORNFIELD TO THE NORTH AND A SOIL STORAGE AREA TO THE EAST <br />3. TEMPORARY FENCE LINE CONSISTS OF 12' LONG BY 6' TALL SEGMENTS SUPPORTED BY ABOVEGROUND STANDS <br />4. 6,000 LB, DIESEL FORKLIFT WITH PNEUMATIC TIRES TO MOVE EQUIPMENT AND CHEMICAL DELIVERIES <br />5. THE BASEMAP IMAGERY OF THE SITE DOES NOT INCLUDE A GRAVEL ROAD INSTALLED BY THE CITY OF LAKE ELMO. <br />6. REFERENCE DRAWING C-04A FOR SECONDARY CONTAINMENT OF PIPING <br />7. THE ISCWO SKID, FEED MATERIAL STORAGE, EFFLUENT FRAC TANK, AND GENERATOR WILL BE SURROUNDED BY CONTAINMENT BERMS <br />8. THE WORK BENCH/TOOL STORAGE SHIPPING CONTAINER WILL CONTAIN A SPILL KIT FOR CONTAINING/RECOVERING RELEASES <br />9. SOME SECONDARY CONTAINMENT OPTIONS ARE CONTAINMENT BERMS, WHICH COLLECT RAINWATER DURING STORM EVENTS. BAY WEST WILL REMOVE WATER FROM CONTAINMENT BERMS DAILY AND PUMP THAT ACCUMULATED WATER INTO THE EFFLUENT FRAC TANK. <br />IMAGE SOURCE: MICROSOFT BING, 2024 MICROSOFT CORPORATION, 2024 MAXAR, CNES (2024) DISTRIBUTION AIRBUS DS040'20' <br />SCALE BAR 1:20 <br />GRAVEL ROAD <br />36 <br />T <br />H <br /> <br />S <br />T <br />R <br />E <br />E <br />T <br /> <br />N <br />O <br />R <br />T <br />H <br />SOURCE: IRONCLAD SECONDARY CONTAINMENT <br />REQUIREMENTS FOR ABOVE GROUND STORAGE TANKS <br />SOURCE: ULINE IBC SPILL <br />CONTAINMENT PALLET: <br />SOURCE: WESTERN GLOBAL® <br />SOURCE: DUMPSTER LINERS <br />SPILL CONTAINMENT BERM <br />SOURCE: ULINE DRUM SPILL <br />CONTAINMENT PALLET: <br />1/13/25 <br />1/13/2025 <br />ID DESCRIPTION <br />A ISCWO SKID <br />B ISCWO SHELTER (W/CONCRETE FOUNDATION) <br />C HIGH PRESSURE AIR COMPRESSOR (HPAC) <br />D OFFICE/CONTROL ROOM (SHIPPING <br />CONTAINER) <br />E FEED MATERIAL STORAGE (8' X 10' SHIPPING <br />CONTAINER) <br />F DOUBLE WALLED DIESEL AST (1,000-GAL) <br />G DIESEL GENERATOR <br />H DOUBLE WALLED EFFLUENT FRAC TANK <br />(18,430-GAL) <br />I INFLUENT WATER TANK (1,000-GAL) <br />J WATER SOFTENER VESSEL <br />K PRE-HEATER EXHAUST STACK (12" DIA) <br />L ISCWO EXHAUST STACK (12" DIA) <br />M PROPANE TANK (500-GAL) <br />N 8' X 10' SHIPPING CONTAINER (WORK <br />BENCH/TOOL STORAGE) <br />O 10% NAOH (275-GAL TOTE) <br />P DIESEL EXHAUST FLUID (55-GAL DRUMS) <br />Q ACTIVATED CARBON OR RESIN VESSELS FOR <br />PRE-TREATMENT (IF NEEDED) <br />R DOUBLE WALLED DIESEL AST (500-GAL) <br />S PORT-A-POTTY <br />ERW <br />PBD <br />1/13/25 <br />1/13/25 <br />SECONDARY CONTAINMENT <br />EMERGENCY SPILL KIT