My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#11 - Northstart 2nd Addition Final Plat and PUD
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
02-04-25
>
#11 - Northstart 2nd Addition Final Plat and PUD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 8:35:24 AM
Creation date
8/15/2025 8:27:08 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Craig Allen, GWSA Land Development, LLC <br />VBWD Permit #2023-01: Schiltgen South <br />January 30, 2023 <br />Page 3 <br /> <br /> <br /> <br />20. The minimum floor elevations for all buildable lots in the development shall be recorded in a <br />Declaration of Covenants and Restrictions or on the final plat. <br />21. Return or allowed expiration of any remaining surety and permit closeout is dependent on the <br />permit holder providing proof that all required documents have been recorded (including but <br />not limited to easements) and providing as-built drawings that show that the project was <br />constructed as approved by the Managers and in conformance with the VBWD Rules and <br />Regulations. <br />22. This permit becomes invalid if (1) the work is not initiated within 1 year of permit issuance, <br />(2) work is idle for 12 consecutive months, or (3) work is not completed within 3 years of the <br />permit issuance date. <br />Thank you for your cooperation with the District’s permit program. <br />Sincerely, <br /> Ed Marchan, President <br />Valley Branch Watershed District <br /> <br />EM/ymh <br />Enclosure <br />c: Susannah Torseth, VBWD Attorney <br />Dan Scollan, East Metro Area Hydrologist—MDNR <br />Jeffrey Brower, VBWD District Inspector <br />Bob Molstad, Sathre-Bergquist, Inc.—Authorized Agent <br />Peter Schiltgen—Owner <br />Jack Griffin, Focus Engineering, City Engineer—City of Lake Elmo <br />Kristina Handt, City Administrator—City of Lake Elmo <br />Sophia Jensen, City Planner—City of Lake Elmo <br />John Taylor, Building Official—City of Lake Elmo <br />Ben Meyer, Minnesota Board of Water and Soil Resources <br />Daryl Wierzbinski, Corps of Engineers <br />Jay Riggs, Washington Conservation District <br />Kelly Pharis, MN Department of Natural Resources, Washington County DNR TEP Representative <br />John Hanson, Barr Engineering Co. <br />Karen Wold, Barr Engineering Co. <br />Mike Strong, Barr Engineering Co. <br />Josh Phillips, Barr Engineering Co. <br />Yvonne Huffman, Barr Engineering Co. <br /> <br />\\barr.com\projects\Mpls\23 MN\82\2382020\_MovedFromMpls_P\2023\Permit 2023-01 Schiltgen South, Lake <br />Elmo\PermitLtr_2023-01_SchilgenSouth_Lake Elmo.docx <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.