My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#11 - Northstart 2nd Addition Final Plat and PUD
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
02-04-25
>
#11 - Northstart 2nd Addition Final Plat and PUD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 8:35:24 AM
Creation date
8/15/2025 8:27:08 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MEMORANDUM <br />Date: January 28, 2025 <br /> <br /> <br />To: Sophia Jensen, City Planner Re: Northstar 2nd Addition Final Plat/Plans <br /> Nathan Fuerst, Planning Consultant Engineering Review Comments <br /> Marty Powers, Public Works Director <br /> Nate Stanley, City Engineer <br /> Chad Isakson, Assistant City Engineer <br />From: Jack Griffin, Sr. Project Manager <br /> <br /> <br />An engineering review has been completed for the Northstar 2nd Addition Final PUD Plat/Plans received <br />on January 8, 2025. The submittal consisted of the following documentation: <br /> Northstar Final Plat, file dated November 5, 2024. <br /> Northstar Street and Utility Plans dated January 7, 2025. <br /> Northstar Street and Utility Specifications dated October 24, 2024. <br /> Northstar Landscape Plans dated January 6, 2025. <br /> Northstar Irrigation Plan dated October 24, 2024. <br /> <br /> <br />STATUS/FINDINGS: Engineering review comments have been provided in two separate memos; one for <br />Final PUD/Plat approval, and one to assist with the completion of the Final Construction Plans. Please see <br />the following review comments relating to the Final PUD/Plat application. <br /> <br />FINAL PLAT AND EASEMENTS <br />1. The Final Plat shall not be recorded until the City Engineer approves the Final Construction Plans. <br />2. There are no Oultots as part of the Northstar 2nd Addition Final Plat. <br />3. Drainage and utility easements are shown to be dedicated on the Final Plat along all lot lines as <br />required and consistent with the approved Preliminary Plans. <br />4. All easements as required by the City Engineer and Public Works Director shall be documented on <br />the Final Plat prior to the release of the Final Plat for recording. Revisions to the Final Plat and <br />easements may be necessary as the Construction Plans are reviewed and finalized. <br />5. All easement areas must be free from all encroachments other than those approved by the City <br />Engineer and upon execution of an easement encroachment agreement. Prohibited <br />encroachments include, but are not limited to trees, landscaping, fences, retaining walls, graded <br />slopes, and building structures. Small/dry utility corridor easements along all public right-of-way <br />must be reserved for the installation of small/dry utilities. <br />6. A bituminous trail connection has been shown on the construction plans as required, to connect <br />the existing trail in Legacy at North Star to the Northstar subdivision trail system. To preserve the <br />prior park dedication credit for this trail segment, the connecting trail design and construction
The URL can be used to link to this page
Your browser does not support the video tag.