Laserfiche WebLink
<br />December 13, 2024 <br />Stillwater Elementary <br /> <br /> <br />Memorandum 2 <br />LANDSCAPE PLAN: 105.12.480 <br />• With the mitigation tree adjustment, the required amount of tree planting has been met. <br /> <br />TREE PLANTING REQUIREMENTS CODE <br />REQUIRED PROPOSED <br />Landscape Trees 240 253 <br />Council-approved contribution in lieu of 106 trees 106 (equivalent) <br />Mitigation Trees 26 23 <br />Total Required Trees 372 met <br /> <br />o The landscape plans require the following revisions as a condition of their approval: <br /> It is unclear from the irrigation plan whether all of the proposed trees are covered by <br />proposed irrigation. Please confirm. If certain trees are not, applicant must clearly identify <br />how they are to be watered for the duration of the 2-year warranty period. <br /> Each of the landscape layout plans (L1.0002-L1.007) should include a tree schedule showing <br />the trees proposed on that sheet. Having the tree schedule for the entire site on a separate <br />sheet (L2.002), while helpful for bidding, is not sufficient to guide plant installation and tree <br />warranty inspections. <br /> <br />RECOMMENDATION: <br />The landscape plans may be approved, conditional to the submittal of revised plans addressing the revisions <br />requested in this memo. <br /> <br /> <br />Sarah Evenson, PLA (MN) <br />City of Lake Elmo Municipal Landscape Architect <br />P: (262) 391-7653 E: sarah@hkgi.com