Laserfiche WebLink
<br />Ed Marchan ● Don Pereira ● John Brach ● Rick Gelbmann ● William Armstrong <br />P.O. Box 838 | Lake Elmo, MN 55042-0538 | www.vbwd.org <br /> <br /> <br /> <br /> <br /> <br /> <br />ELECTRONIC TRANSMITTAL LETTER <br /> <br /> <br />VBWD Permit Number: 2024-43 <br />Project Name New Lake Elmo Elementary School <br />Approval Date: November 14, 2024 <br />Approval Based on the <br />Following Submittal Items: <br />• Civil drawings prepared by Larson Engineering, dated 10/24/2024 (40 <br />sheets) <br />• Stormwater calculations and model files prepared by Larson <br />Engineering, dated 10/24/2024 <br />• Geotechnical Evaluation Report prepared by Braun Intertec <br />Corporation, dated September 24, 2024 <br /> <br />Attached is the approved VBWD permit. Please note the conditions imposed by the Managers, which are listed <br />on the back of the permit. <br />The VBWD Engineer and Inspector must be notified at least 3 days prior to commencement of work. <br />VBWD has streamlined the permit process by switching to electronic delivery of the approved permits. <br />You will not receive a paper copy of the permit. <br />Thank you for your cooperation with the VBWD’s permit program. <br /> <br />Distribution List <br />Applicant Marie Schrul, Stillwater Area Public Schools schrulm@stillwaterschools.org; <br />Authorized Agent Mitch Honsa, Larson Engineering mhonsa@larsonengr.com; <br />John Hanson VBWD Engineer, Barr Engineering Co. jhanson@barr.com; <br />Susannah Torseth VBWD Attorney, Galowitz-Olson, PLLC storseth@galowitzolson.com; <br />Jeff Brower VBWD Inspector jbrower@vbwd.org; <br />Ed Marchan VBWD President ed@brockmanmarchan.com; <br />Dan Scollan DNR East Metro Area Hydrologist daniel.scollan@state.mn.us;