My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#09 - 2025 Street Improvements
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
02-18-25
>
#09 - 2025 Street Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 9:27:22 AM
Creation date
8/15/2025 9:27:11 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />• Table 2: Watermain and Street Reconstruction Costs <br />55th Street North Total Estimated <br />Project Costs <br />City Share of Project <br />Cost <br />Estimated Per Unity <br />Assessed Rate <br />Street Improvements $821,000 $574,600 $44,800 for 5 units <br />$22,400 @50% for 1 unit <br />Watermain Extension* $230,000 $0 $46,000 for 5 units <br />*Costs cover watermain installed in the right-of-way. Connection fees and cost to extend water to the home <br />on private property is in addition to the assessed amount. <br />A property owner meeting was held on January 28, 2025 and no property owners attended. The information <br />above was uploaded to the project website for reference. At the time this Staff report was submitted there <br />has been engagement from any property owners. <br />Staff recommends reclamation of the existing road without extension of city water. <br />Irish Court North: Preliminary Design Findings <br />• Geotechnical Investigation supports reclamation of the existing roadway if watermain is not <br />extended. <br />o Storm sewer repairs are recommended <br />o Existing and proposed roadway is 32-feet wide (face of curb to face of curb). <br />o Barrier concrete curb and gutter is recommended along the length of the roadway. <br />Table 1: Reclamation Costs <br />Irish Court North Total Estimated <br />Project Costs <br />City Share of Project <br />Cost <br />Estimated Per Unit <br />Assessed Rate <br />Street Improvements $248,000 $173,100 $10,700 for 7 units <br /> <br />• Extension of City Water is feasible and requires full road reconstruction <br />o Extension of drinking water would be open cut with services extended to each property. <br />o The roadway will need to be fully reconstructed with a new sand and gravel base. <br />o Existing and proposed roadway is 32-feet wide (face of curb to face of curb). <br />o Storm sewer repairs are recommended <br />o Barrier concrete curb and gutter is recommended along the length of the roadway. <br /> <br />• Table 2: Watermain and Street Reconstruction Costs <br />Irish Court North Total Estimated <br />Project Costs <br />City Share of Project <br />Cost <br />Estimated Per Unity <br />Assessed Rate <br />Street Improvements $585,000 $409,300 $25,100 for 7 units <br /> <br />Watermain Extension* $144,200 $0 $20,600 for 7 units <br />*Costs cover watermain installed in the right-of-way. Connection fees and cost to extend water to the home <br />on private property is in addition to the assessed amount. <br />A property owner meeting was held on January 28, 2025 and two property owners attended. The <br />information above was uploaded to the project website for reference. At the time this Staff report was
The URL can be used to link to this page
Your browser does not support the video tag.