WEATHER PROOFING <br />1.ALL EXTERIOR WALL OPENINGS, FLASHING, COUNTERFLASHING AND EXPANSION JOINTS SHALL BE <br />CONSTRUCTED IN SUCH A MANNER AS TO MAKE IT WEATHERPROOF. <br />2.THE JUNCTION OF THE ROOF AND VERTICAL SURFACES SHALL BE FLASHED AND <br />COUNTERFLASHED IN A MANNER TO MAKE THEM WEATHERPROOF. <br />3.PROVIDE FOR ALL TEMPORARY WEATHERPROOFING DURING THE COURSE OF WORK TO ASSURE <br />PROTECTION AND FULL OPERATION OF THE EXISTING FACILITY. <br />DOORS, VENTS, AND WINDOWS <br />1.ALL EGRESS DOORS SHALL BE ABLE TO BE OPENED FROM THE INSIDE WITHOUT USE OF KEY OR <br />ANY SPECIAL KNOWLEDGE OR EFFORT. ALL EXIT SIGNS SHALL HAVE LETTERS SIX INCHES HIGH <br />MINIMUM, AND SHALL CONFORM WITH APPLICABLE CODES. REFER TO FLOOR PLANS FOR EXIT <br />SIGN LOCATIONS. <br />2.INSTALL PER MANUFACTURER'S PRINTED INSTALLATION INSTRUCTIONS AND RECOMMENDATIONS. <br />WHERE DETAILED, PROVIDE ALL ADDITIONAL MATERIALS SHOWN OR NOTED. VERIFY ALL OPENING <br />SIZES, BOTH NEW AND EXISTING PRIOR TO ORDERING. PROVIDE SPACE FOR FLASHING AS <br />DETAILED. PROVIDE GALVANIC ISOLATION BETWEEN DISSIMILAR MATERIALS. <br />FINISHES <br />1.PAINT ALL PAINTABLE ITEMS ATTACHED TO WALLS, CEILING, OR COLUMNS EXCEPT DUCTWORK <br />AND FLEXIBLE AND/OR MOVABLE PARTS. CONCEAL ALL PIPE AND CONDUIT WHERE WALL FURRING <br />IS PROVIDED. PRIME ALL MATERIALS WITH MATERIAL COMPATIBLE WITH SUBSTRATE. SEE FINISH <br />SCHEDULE AND FINISH NOTES. <br />2.OFFSET STUDS WHERE NEEDED, SO THE FINISH WALL SURFACES WILL BE FLUSH. <br />3.PROVIDE GALVANIC ISOLATION BETWEEN DISSIMILAR METALS. <br />4.CEILING SUSPENSION SYSTEMS SHALL BE STABILIZED AGAINST LATERAL MOVEMENT IN <br />ACCORDANCE WITH THE REQUIREMENTS OF THE IBC, GOVERNING EDITION. <br />5.CEILING HEIGHTS ARE FROM CONCRETE FLOOR SLAB TO GRID AT ACOUSTICAL TILE CEILING, OR <br />FINISH AT HARD CEILING. <br />6.ALL INTERIOR WOOD BLOCKING SHALL BE FIRE TREATED. <br />EQUIPMENT <br />1.THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH <br />MANUFACTURER'S RECOMMENDATIONS UNLESS SPECIFICALLY INDICATED OTHERWISE OR WHERE <br />LOCAL CODES OR REGULATIONS TAKE PRECEDENCE. <br />2.VERIFY ALL EQUIPMENT MOUNTING DIMENSIONS PER MANUFACTURER DRAWINGS. <br />3.PROVIDE SOLID BLOCKING FOR ALL WALL MOUNTED FIXTURES, DEVICES & EQUIPMENT. COORD. W/ <br />ALL DIVISIONS OF THE SPECIFICATIONS TO VERIFY LOCATION REQUIRED. <br />4.CONTRACTOR SHALL PROVIDE SEISMIC BRACING AND SUPPORT ALL EQUIPMENT AND MATERIALS <br />PROVIDED. <br />FIRESTOPPING <br />1.FIRESTOPPING SHALL BE PROVIDED BY A SINGLE CONTRACTOR FOR ALL TRADES USING A SINGLE <br />MANUFACTURER'S PRODUCTS (3M OR HILTI). <br />2.ALL RECESSED PANELS MOUNTED IN FIRE RATED WALLS SHALL BE OF FIRE RATED <br />CONSTRUCTION TO MATCH RATING OF WALL. (I.E. TRAP PRIMERS, F.E. CABINETS, ETC.) <br />ELECTRICAL NOTES <br />1.THESE PLANS ARE DIAGRAMMATIC ONLY, AND NOT TO BE SCALED. <br />2.ELECTRICAL CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, INSURANCE, EQUIPMENT, <br />INSTALLATION, CONSTRUCTION TOOLS, TRANSPORTATION, ETC. FOR A COMPLETE AND PROPERLY <br />OPERATIVE SYSTEM ENERGIZED THROUGHOUT AND AS INDICATED ON DRAWINGS, AS SPECIFIED <br />HEREIN AND/OR AS OTHERWISE REQUIRED. <br />3.ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND IN PERFECT CONDITION WHEN INSTALLED <br />AND SHALL BE OF THE BEST GRADE OR GROUP OF EQUIPMENT. MATERIALS SHALL BE LISTED AND <br />APPROVED BY UNDER-WRITER'S LABORATORY AND SHALL BEAR THE INSPECTION LABEL "J" <br />WHERE SUBJECT TO SUCH APPROVAL MATERIALS SHALL MEET WITH APPROVAL OF THE DIVISION <br />OF INDUSTRIAL SAFETY AND ALL GOVERNING BODIES HAVING JURISDICTION. MATERIALS SHALL BE <br />MANUFACTURED IN ACCORDANCE WITH APPLICABLE STANDARDS ESTABLISHED BY ANSI, NEMA <br />AND NBFU. <br />4.ALL CONDUIT INSTALLED SHALL BE SURFACE MOUNTED UNLESS OTHERWISE NOTED. <br />5.ELECTRICAL CONTRACTOR SHALL CARRY OUT THE WORK WITH ACCORDANCE WITH ALL <br />GOVERNING STATE, COUNTY, LOCAL CODES AND O.S.H.A. <br />6.ELECTRICAL CONTRACTOR SHALL SECURE ALL NECESSARY ELECTRICAL PERMITS, AND PAY ALL <br />REQUIRED FEES. <br />7.COMPLETE JOB SHALL BE GUARANTEED FOR A PERIOD OF NO LESS THAN ONE YEAR AFTER THE <br />DATE OF JOB COMPLETION. ANY WORK, MATERIAL, OR EQUIPMENT FOUND TO BE FAULTY DURING <br />THAT PERIOD SHALL BE CORRECTED AT ONCE, UPON WRITTEN NOTIFICATION, AT THE EXPENSE <br />OF THE ELECTRICAL CONTRACTOR. <br />8.ALL INSTALLATIONS TO MAINTAIN REQUIRED CLEARANCES <br />9.CONTRACTOR TO SIZE CONDUCTORS PER NEC AND CARRIER REQUIREMENTS AND UPSIZE AS <br />REQUIRED TO MINIMIZE VOLTAGE DROP. <br />10.CONTRACTOR TO SIZE CONDUIT PER NEC <br />11.ALL CONDUIT ONLY (C.O.) SHALL HAVE A PULL WIRE OR ROPE, AND TRUE TAPE. <br />12.PROVIDE THE OWNER WITH ONE SET OF COMPLETE DIMENSIONS AND CIRCUITS, WITHIN 10 <br />WORKING DAYS OF PROJECT COMPLETION. ELECTRICAL "AS BUILT" DRAWINGS, SHOWING ACTUAL <br />LOCATION OF CONDUITS. <br />13.ALL BROCHURES, OPERATING MANUALS, CATALOGS, SHOP DRAWINGS, ETC. SHALL BE TURNED <br />OVER TO PROJECT MANAGER AT JOB COMPLETION. <br />14.USE T-TAP CONNECTIONS ON ALL MULTI-CIRCUITS WITH COMMON NEUTRAL CONDUCTOR FOR <br />LIGHTING FIXTURE. ALL CONDUCTORS SHALL BE COPPER. <br />15.ALL CIRCUIT BREAKERS, FUSES AND ELECTRICAL EQUIPMENT SHALL HAVE AN INTERRUPTING <br />RATING NOT LESS THAN THE MAXIMUM SHORT =CIRCUIT CURRENT TO WHICH THEY MAY BE <br />SUBJECTED, AND A MINIMUM OF 10,000 A.I.C. <br />16.PATCH, REPAIR, AND PAINT ANY AREA THAT HAS BEEN DAMAGED IN THE COURSE OF THE <br />ELECTRICAL WORK. <br />17.IN DRILLING HOLES INTO CONCRETE (WHETHER FOR FASTENING OR ANCHORING PURPOSES OR <br />PENETRATIONS THROUGH THE FLOOR FOR CONDUIT RUNS, PIPE RUNS, ETC.) IT MUST BE CLEARLY <br />UNDERSTOOD THAT TENDONS AND RE-BARS WILL NOT BE DRILLED INTO, CUT, OR DAMAGED <br />UNDER ANY CIRCUMSTANCES. <br />18.LOCATION OF TENDONS AND RE-BARS ARE NOT DEFINITELY KNOWN AND THEREFORE MUST BE <br />SEARCHED FOR BY APPROPRIATE METHODS AND EQUIPMENT VIA X-RAY, OR OTHER DEVICES <br />THAT CAN ACCURATELY LOCATE THE REINFORCING STEEL TENDONS. <br />19.PENETRATIONS IN FIRE RATED WALLS SHALL BE FIRE STOPPED IN ACCORDANCE WITH <br />APPLICABLE LOCAL BUILDING CODES. USING U.L. RATED MATERIALS. <br />20.ELECTRICAL CONTRACTOR IS TO COORDINATE WITH UTILITY COMPANY FOR CONNECTION OF <br />TEMPORARY AND PERMANENT POWER TO THE SITE. THE TEMPORARY POWER AND ALL HOOK-UP <br />COSTS SHALL BE PAID BY THE CONTRACTOR. <br />21.ELECTRICAL CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND/OR CATALOG CUT-SHEETS ON <br />ALL NON-SPECIFIED ORIGINAL MATERIALS AND EQUIPMENT, TO PROJECT MANAGER PRIOR TO <br />COMMENCEMENT OF THE WORK. <br />22.UPON COMPLETION OF WORK, CONDUCT CONTINUITY AND SHORT CIRCUIT, AS WELL AS, <br />GROUNDING TEST, GROUNDING TEST SHALL BE PREFORMED BY INDEPENDENT TESTING AGENCY, <br />WITH WRITTEN REPORT SUBMITTED TO THE PROJECT MANAGER FOR REVIEW AND APPROVAL. <br />23.CLEAN PREMISES DAILY OF ALL DEBRIS RESULTING FROM WORK AND LEAVE WORK PREMISES IN A <br />COMPLETE AND UNDAMAGED CONDITION. <br />24.ALL EXTERIOR WALL PENETRATIONS SHALL BE SEALED WITH POLYSEAM SEALANT. <br />25.ALL #2 TINNED BARE COPPER DOWNLEADS TO BE PROTECTED BY 1/2" P.V.C. PIPE AND SECURED. <br />26.COMPRESSION FITTINGS TO BE USED ON ALL CONDUITS (NO SET SCREWS). <br />27.ALL #6 STRANDED COPPER WITH GREEN INSULATION TO BE ATTACHED WITH CRIMPED DOUBLE <br />LUG, ATTACHED WITH NUTS, BOLTS AND STAR WASHERS TYPICAL AND NO-OX GREASE BETWEEN <br />LUG AND BUS BAR. <br />28.ALL ABOVE GROUND CONDUIT SHALL BE RIGID GALVANIZED CONDUIT WITH WEATHERPROOF <br />FITTINGS. <br />29.THE ENTIRE ELECTRICAL INSTALLATION SHALL BE GROUNDED AS REQUIRED BY ALL APPLICABLE <br />CODES. <br />GROUNDING <br />1.ALL METALLIC PARTS OF ELECTRICAL EQUIPMENT WHICH DO NOT CARRY CURRENT SHALL BE <br />GROUNDED IN ACCORDANCE WITH THE REQUIREMENTS OF THE BUILDING MANUFACTURER, <br />CARRIER'S AND LANDLORD'S GROUNDING AND BONDING STANDARDS, AND THE NATIONAL <br />ELECTRICAL CODE. <br />2.PROVIDE ELECTRICAL GROUNDING AND BONDING SYSTEM INDICATED WITH ASSEMBLY OF <br />MATERIALS, INCLUDING GROUNDING ELECTRODES, BONDING JUMPERS AND ADDITIONAL <br />ACCESSORIES AS REQUIRED FOR A COMPLETE INSTALLATION. <br />3.ALL GROUNDING CONDUCTORS SHALL PROVIDE A STRAIGHT DOWNWARD PATH TO GROUND WITH <br />GRADUAL BEND AS REQUIRED. GROUNDING CONDUCTORS SHALL NOT BE LOOPED OR SHARPLY <br />BENT. ROUTE GROUNDING CONNECTIONS AND CONDUCTORS TO GROUND IN THE SHORTEST AND <br />STRAIGHTEST PATHS POSSIBLE TO MINIMIZE TRANSIENT VOLTAGE RISES. <br />4.IN BUILDINGS AND/OR NEW TOWERS GREATER THAN 75 FEET IN HEIGHT AND WHERE THE MAIN <br />GROUNDING CONDUCTORS ARE REQUIRED TO BE ROUTED TO GRADE, THE CONTRACTOR SHALL <br />ROUTE TWO GROUNDING CONDUCTORS FROM THE ROOFTOP'S, OR TOWER'S GROUND RING, TO <br />THE EXISTING GROUNDING SYSTEM, THE GROUNDING CONDUCTORS SHALL NOT BE SMALLER <br />THAN #2 AWG COPPER. ROOFTOP GROUND RING SHALL BE BONDED TO THE EXISTING GROUNDING <br />SYSTEM, THE BUILDING STEEL COLUMNS, LIGHTNING PROTECTION SYSTEM, AND BUILDING MAIN <br />WATER LINE (FERROUS OR NONFERROUS METAL PIPING ONLY). <br />5.TIGHTEN GROUNDING AND BONDING CONNECTORS, INCLUDING SCREWS AND BOLTS, IN <br />ACCORDANCE WITH MANUFACTURER'S PUBLISHED TORQUE TIGHTENING VALUES FOR <br />CONNECTORS AND BOLTS. WHERE MANUFACTURER'S TORQUING REQUIREMENTS ARE NOT <br />AVAILABLE, TIGHTEN CONNECTIONS TO COMPLY WITH TIGHTENING TORQUE VALUES SPECIFIED IN <br />UL TO ASSURE PERMANENT AND EFFECTIVE GROUNDING. CONTRACTOR SHALL VERIFY THE <br />LOCATIONS OF GROUNDING TIE-IN-POINTS TO THE EXISTING. <br />6.ALL UNDERGROUND GROUNDING CONNECTIONS SHALL BE MADE BY THE GROUNDING SYSTEM. <br />EXOTHERMIC WELD PROCESS AND INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S <br />INSTRUCTIONS. <br />7.ALL GROUNDING CONNECTIONS SHALL BE INSPECTED FOR TIGHTNESS. EXOTHERMIC WELDED <br />CONNECTIONS SHALL BE APPROVED BY THE INSPECTOR HAVING JURISDICTION BEFORE BEING <br />PERMANENTLY CONCEALED. <br />8.APPLY CORROSION-RESISTANCE FINISH TO FIELD CONNECTIONS AND PLACES WHERE FACTORY <br />APPLIED PROTECTIVE COATINGS HAVE BEEN DESTROYED. <br />9.A SEPARATE, CONTINUOUS, INSULATED EQUIPMENT GROUNDING CONDUCTOR SHALL BE <br />INSTALLED IN ALL FEEDER AND BRANCH CIRCUITS. <br />10.BOND ALL INSULATED GROUNDING BUSHINGS WITH A BARE 6 AWG GROUNDING CONDUCTOR TO A <br />GROUND BUS. <br />11.DIRECT BURIED GROUNDING CONDUCTORS SHALL BE INSTALLED AT A NOMINAL DEPTH OF 36" <br />MINIMUM BELOW GRADE, OR 6" BELOW THE FROST LINE, USE THE GREATER OF THE TWO <br />DISTANCES. <br />12.ALL GROUNDING CONDUCTORS EMBEDDED IN OR PENETRATING CONCRETE SHALL BE INSTALLED <br />IN SCHEDULE 40 PVC CONDUIT. <br />13.THE INSTALLATION OF A CHEMICAL ELECTROLYTIC GROUNDING SYSTEM IS NOT PERMITTED <br />UNLESS SPECIFICALLY NOTED. <br />14.DRIVE GROUND RODS UNTIL TOPS ARE A MINIMUM DISTANCE OF 36" DEPTH OR 6" BELOW FROST <br />LINE, USING THE GREATER OF THE TWO DISTANCES. <br />15.IF COAX ON THE ICE BRIDGE IS MORE THAN 6 FT. FROM THE GROUND BAR AT THE BASE OF THE <br />TOWER, A SECOND GROUND BAR WILL BE NEEDED AT THE END OF THE ICE BRIDGE, TO GROUND <br />THE COAX CABLE GROUNDING KITS AND IN-LINE ARRESTORS <br />16.CONTRACTOR SHALL REPAIR, AND/OR REPLACE, EXISTING GROUNDING SYSTEM COMPONENTS <br />DAMAGED DURING CONSTRUCTION AT THE CONTRACTORS EXPENSE. <br />17.EXTERIOR GROUND RINGS SHALL BE TESTED AND SHALL HAVE A RESISTANCE TO EARTH OF 5 <br />OHMS OR LESS. IF NOT NOTIFY ENGINEER. <br />COMMUNICATIONS <br />GENERAL CABLING <br />1.ALL INSTALLED CABLES SHALL HAVE SHEATHS (RISER / PLENUM / OUTDOOR / UV RESISTANT) <br />APPROPRIATE FOR THE MOST RESTRICTIVE ENVIRONMENT WHICH THEY WILL TRAVERSE. <br />2.ALL CABLING TO BE SUPPORTED AND LACED PER NEC, LOCAL REQUIREMENTS AND TO MEET <br />CARRIER SPECIFICATIONS. <br />3.MAINTAIN REQUIRED SEPARATION BETWEEN CONDUCTORS AND OTHER CABLES AS PRESCRIBED <br />BY CARRIER SPECIFICATIONS AND BEST PRACTICES. <br />4.ALL FIRE, SMOKE OR DRAFT BARRIERS SHALL BE REPAIRED SUCH THAT THEY MAINTAIN THEIR <br />INTENDED / REQUIRED RATINGS. <br />5.PLANS ARE NOT TO BE SCALED. USE DIMENSION CALL-OUTS FOR ESTIMATES. CABLE LENGTHS <br />ARE SHOWN FOR INFORMATIONAL PURPOSES ONLY AND IT IS THE CONTRACTOR'S <br />RESPONSIBILITY TO FIELD VERIFY ALL LENGTHS PRIOR TO ORDERING. <br />FIBER OPTICS <br />6.VERIFY SINGLE-MODE OR MULTI-MODE AND CONNECTOR TYPE <br />7.ALL CABLES AND CONNECTORS TO BE PRE-APPROVED, OR AN EXCEPTION OBTAINED PRIOR TO <br />PURCHASE AND INSTALLATION <br />8.ALL FIBER STRANDS SHALL BE FUSION SPLICED THROUGHOUT OUT THE LENGTH OF THE RUN AND <br />BE TERMINATED AT EACH END OF TRUNK UNLESS SPECIFICALLY NOTED. <br />9.ALL TERMINATIONS TO BE LANDED IN A BULKHEAD OR COILED AND PROTECTED IN A SPLICE CASE <br />IF BULKHEAD IS SPACE CONSTRAINED. <br />10.ALL SPLICES TO BE FUSION TYPE AND INDIVIDUAL SPLICES SHALL HAVE A LOSS OF LESS THAN 0.1 <br />dB. ANY SPLICES WITH HIGHER LOSSES TO BE REMADE. <br />11.ALL FIBERS TO BE TESTED WITH OTDR AND POWER METER. OTDR AND OPTICAL LOSS REPORT <br />PROVIDED IN CLOSEOUT PACKAGE. <br />12.ALL FIBER CABLING TO BE INSTALLED IN PROTECTIVE CABLE MANAGEMENT SYSTEMS, DUCT OR BE <br />ARMORED CABLE WHERE TRAVERSING SHARED SPACE. <br />COAX AND ANTENNAS <br />13.ALL ANTENNA MOUNTS SHALL BE INSTALLED IN ACCORDANCE WITH ANSI/TIA-222 AND APPLICABLE <br />LOCAL CODES <br />14.ALL COAX TO BE INSTALLED PER CARRIER SPECIFICATIONS, SUPPORTED AT A MINIMUM OF EVERY <br />4'-0" IN PROPERLY SIZED BLOCKS OR OTHER COAX SUPPORTS U.N.O. <br />15.ALL COAX TRAVERSING EXTERIOR WALLS SHALL BE PROTECTED ON INTERIOR SIDE WITH <br />LIGHTNING SURGE SUPPRESSOR GROUNDED TO BUILDING GROUNDING SYSTEM OR STEEL (NOT <br />LIGHTNING PROTECTION SYSTEM). PROVIDE COAX GROUND KIT AT ANTENNA AND AS REQUIRED <br />BY CARRIER. <br />16.ALL COAX TERMINATIONS SHALL BE LOW PIM AND APPROVED BY CARRIER. <br />17.MAINTAIN MINIMUM BEND RADIUS AND SUPPORT CABLE AS NEEDED TO PROTECT CABLES FROM <br />SAGGING, KINKING OR BEING CAUGHT. <br />18.ALL COAX TO BE SWEEP (DTF & RETURN LOSS) AND PIM TESTED WITH PASSING REPORTS <br />PROVIDED TO CARRIER. <br />19.PROVIDE 50 OHM LOAD ON ALL UNUSED PORTS. <br />20.WATERPROOF ALL EXTERIOR CONNECTIONS AND ANY OTHER CONNECTIONS EXPOSED TO <br />MOISTURE OR CONDENSING ENVIRONMENTS WITH SELF-AMALGAMATING BUTYL TAPE WITH <br />MINIMUM 1/2" OVERLAP. <br />21.TORQUE ALL CONNECTIONS TO MANUFACTURER SPECIFICATIONS WITH APPROPRIATE TORQUE <br />WRENCH. <br />22.MOUNT GPS ANTENNA ON 1-1/4" SCH. 40 STEEL OR STAINLESS STEEL WITH BURNDY GROUNDING <br />CLAMP THIN 2° OF VERTICAL. <br />A 02.05.25 EXHIBIT GW <br />B 02.20.25 FINAL EXHIBIT GW <br />Description:Rev:Date:By: <br />SHEET NUMBER: <br />SHEET TITLE: <br />DRAWN BY:CHK BY:APV BY: <br />PROJECT INFORMATION: <br />T: <br />\ <br />N <br />o <br />n <br />- <br />C <br />O <br />\ <br />A <br />1 <br />N <br />0 <br />3 <br />7 <br />7 <br />A <br />\ <br />T <br />e <br />m <br />p <br /> <br />S <br />i <br />t <br />e <br />\ <br />A <br />& <br />E <br />\ <br />C <br />A <br />D <br />\ <br />A <br />1 <br />N <br />0 <br />3 <br />7 <br />7 <br />A <br />_ <br />T <br />e <br />m <br />p <br /> <br />S <br />i <br />t <br />e <br />_ <br />A <br /> <br />a <br />n <br />d <br /> <br />E <br />_ <br />C <br />D <br />s <br />. <br />d <br />w <br />g <br /> P <br />L <br />O <br />T <br /> <br />D <br />A <br />T <br />E <br />: <br /> <br />2/ <br />2 <br />0 <br />/ <br />2 <br />0 <br />2 <br />5 <br /> <br />B <br />Y <br />: <br />Ga <br />r <br />y <br /> <br />W <br />a <br />t <br />t <br />s <br />THIS WORK WAS PREPARED BY MYSELF OR UNDER MY <br />SUPERVISION. CONSTRUCTION OF THIS PROJECT WILL BE UNDER <br />MY OBSERVATION. ALL SCALES ARE SET FOR 11"x17" <br />GW CM CA <br />PR <br />E <br />L <br />I <br />M <br />I <br />N <br />A <br />R <br />Y <br />990 SOUTH BROADWAY, DENVER, CO 80209 <br />SITE NAME: <br />A1N0510A RELO TEMP SITE <br />SITE ID: <br />A1N0510A <br />ALT ID: <br />SITE ADDRESS: <br />3303 LANGLEY COURT <br />LAKE ELMO, MN 55042 <br />SITE COUNTY: <br />WASHINGTON COUNTY <br />4751 FOX STREET, DENVER, CO 80216 <br />GENERAL NOTES <br />GN1.1