My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#15 - Utility Rates and Fee Changes for 2025
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
03-18-25
>
#15 - Utility Rates and Fee Changes for 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 9:38:53 AM
Creation date
8/15/2025 9:38:47 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Lake Elmo <br />2025 Fee Schedule <br />Revisions adopted March 18, 2025 <br />Residential Remodel Plumbing $60.00 Flat Fee <br />Sewer Service Installation Inspection $60.00 <br />Water Service Installation Inspection $60.00 <br />Sewer & Water Service Installation Inspection when completed <br />together $60.00 <br />Investigation fee - Plumbing work started without required <br />permit Equal to permit fee amount <br />Commercial HVAC $180.00 or 1.5% Value of work, whichever is greater <br />New Residential Construction HVAC $180.00 Flat Fee <br />Residential Remodel HVAC $60.00 Flat Fee <br />Fireplace Installation $60 per unit <br />Investigation fee - HVAC work started without required permit Equal to permit fee amount <br />Solar Residential Rooftop $200.00 Flat Fee + Plan Review Valuation of project shall also be submitted with Application <br />Solar Residential Ground base $300.00 Flat Fee + Plan Review <br />Valuation of project shall also be submitted with Application <br />Other Planning Fees May apply <br />All Commercial Solar Projects Fee Based on Valuation + Plan review <br />fee Other Planning Fees May apply <br />Manufactured Home Move In $200.00 <br />Manufactured Home Move Out $200.00 <br />Moving House or Primary Structure into the City 2% Value of the Work plus security amount determined by the Building Official <br />Moving Accessory Structure into the City 2% Value of the Work plus security amount determined by the Building Official <br />Fire Permit Fee Schedule <br />Storage Tank Removal $250.00 <br />Storage Tank Installation 2% Value of the work <br />Plan Review Fee (Fire) 65% of permit fee based on valuation of job <br />Fire Suppression 2% Value, $100.00 minimum <br />3
The URL can be used to link to this page
Your browser does not support the video tag.