Laserfiche WebLink
Quality Assurance Testing Proposal <br />Village Parkway UPRR Crossing Improvements, Lake Elmo, MN <br />May 12, 2025 <br />AET Proposal No. P-0043606 <br /> <br /> <br />Page 3 of 6 <br />are proof rolled by a loaded, tandem-axle dump truck. <br />• Evaluate the subgrade deflections under the wheel loads, and mark areas of excessive <br />deflection. Areas of excessive deflection will be shown to personnel from the contractor <br />and/or their subcontractors. <br />• Provide recommendations for correction of the unstable subgrade soils. <br />Bituminous Pavement Sampling and Testing <br />As bituminous paving is being completed, AET personnel will pick up companion samples <br />provided by the contractor, during each day of paving, and transport the samples to our St. Paul, <br />Minnesota laboratory. Samples will be tested in our laboratory for Asphalt Extraction and <br />Aggregate Gradation (ASTM D2172 Method E-11) MnDOT Modified C137 and C117. <br />Bituminous Nuclear Density Gauge Testing <br />When placement of the bituminous base and wear layers begins, an Engineering Technician will <br />make site visits on an on-call basis to perform nuclear density gauge testing of the bituminous. <br />BMI will determine and mark the random nuclear density test locations of the bituminous. AET <br />understands that we will test a minimum of 1 location per 500 linear feet. <br />Concrete Sampling and Testing <br />During the placement of concrete, AET will perform field testing consisting of slump, air content, <br />temperature of the plastic concrete, and casting of cylinders for compression testing. The City <br />SMC requires field testing for slump, air content, and temperature per every 1,500 linear feet of <br />each type of concrete placed each day. Compressive strength cylinders (1 set of 3 cylinders) <br />are required once per every 1,500 linear feet of each type of concrete placed each day; the <br />cylinders will be retrieved the following day for curing and testing in our laboratory. The 3 <br />cylinders are to be tested at 28-days. We are proposing to cast sets of 5 cylinders, with <br />compressive strength testing as follows: 1 at 7 days, 3 at 28 days, and the 5th cylinder will be <br />held in reserve for future testing if the 28-day strength requirement is not met. <br /> <br />We have assumed BMI personnel will be compiling the concrete batch tickets, certificates of <br />compliance, and AET’s field test results of the plastic concrete, which we will provide each day <br />we are on-site performing testing services. <br />REPORTING <br />AET staff will prepare reports for the City and BMI to review. These reports will include the results <br />of our field and laboratory testing as performed per the City SMC and testing frequencies