My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#05 - Village Pkwy Improvements
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
05-20-25
>
#05 - Village Pkwy Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 9:45:12 AM
Creation date
8/15/2025 9:45:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Quality Assurance Testing Proposal <br />Village Parkway UPRR Crossing Improvements, Lake Elmo, MN <br />May 12, 2025 <br />AET Proposal No. P-0043606 <br /> <br /> <br />Page 4 of 6 <br />referenced in the project documents. Daily field reports will also be prepared and made available <br />upon request. <br />ESTIMATED FEES <br />Our services will be provided on a unit cost basis according to the unit rates provided in the <br />attached Materials Testing Estimate. Our invoices will be determined by multiplying the number <br />of personnel hours or tests by their respective unit rates. The rates are from the annual fee <br />schedule for 2025 projects. <br /> <br />We have estimated a “minimum required estimate” for the project which estimates the tests <br />needed to satisfy the requirements as defined in the City SMC and the project documents. The <br />“likely needed estimate” is the cost that we anticipate will be required to complete the previously <br />described testing services, based on our experience, and assumed scheduling of the project. <br />Therefore, we propose a budget cost estimate using the “likely needed” estimate for the scope <br />of services for the project as outlined in this proposal. Our “likely needed” estimated fee is <br />$12,707.50. We refer you to the attached Materials Testing Estimate as reference to how we <br />arrived at this estimated cost. <br /> <br />We caution that this is only an estimated cost. Often, variations in the overall cost of the services <br />occur due to reasons beyond our control, such as weather delays, changes in the contractor’s <br />schedule, unforeseen conditions, or retesting. These variations will affect the actual invoice <br />totals, either increasing or decreasing our total costs for the project from those estimated in this <br />proposal. If more time or tests are required, additional fees may be needed to complete the <br />project testing services. If less time or tests are needed, a cost savings will be realized. We will <br />not, however, exceed the estimated total cost for the project without first obtaining your <br />authorization. <br />TERMS AND CONDITIONS <br />All AET Services are provided subject to the Terms and Conditions set forth in the enclosed <br />Construction Service Agreement—Terms and Conditions, which, upon acceptance of this <br />proposal, are binding upon you as the Client requesting Services, and your successors, <br />assignees, joint venturers, and third-party beneficiaries. Please be advised that additional <br />insured status is granted only upon written acceptance of the proposal. <br />ACCEPTANCE <br />AET requests written acceptance of this proposal in the Proposal Acceptance box below, but the <br />following actions shall constitute your acceptance of this proposal together with the Terms and
The URL can be used to link to this page
Your browser does not support the video tag.