My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#06 - Northstar 2nd Addn DA
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
04-01-25
>
#06 - Northstar 2nd Addn DA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 9:59:06 AM
Creation date
8/15/2025 9:58:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 <br />LA515\150\1011808.v2 <br />Urban Areawide Review (AUAR) fee in the amount of $230.00 per REC shall be paid by the <br />Developer prior to the City recording the final plat. The total amount to be paid by the Developer <br />is $14,030. <br />24. SANITARY SEWER AND WATER UTILITY AVAILABILITY CHARGES (SAC <br />AND WAC). The Developer shall be responsible for the payment of all sewer availability charges <br />(SAC) and all water availability charges (WAC) with respect to the Subdivision Improvements <br />required by the City and any state or metropolitan government agency. <br />The sewer availability charge (SAC) in the amount of $3,000.00 per Residential Equivalent <br />Charge (“REC”) shall be paid by the Developer to the City before recording the final plat. The total <br />amount to be paid by the Developer is $183,000. <br />The water availability charge (WAC) in the amount of $3,000.00 per REC shall be paid by <br />the Developer to the City before recording the final plat. The total amount to be paid by the <br />Developer is $183,000. <br />In addition, a sewer connection charge in the amount of $1,000.00 per REC, a <br />Metropolitan Council sewer availability charge in the amount of $2,485.00 per REC, and a water <br />connection charge in the amount of $1,000.00 per REC will be payable by the Developer and <br />collected by the City at the time the City issues a building permit for each building with the <br />development. <br />25. STREET LIGHTS. The Developer is responsible for the cost of street light installation <br />consistent with a street lighting plan approved by the City. Before the City signs the final plat, the <br />Developer shall post a Security for street light installation consistent with the approved street <br />lighting plan. The required Security is $18,000and consists of three (3) decorative lights at $6,000 <br />each. The Developer shall also pay the City $395/light= $1,185 to reimburse the City for the first <br />year operating costs for the street lights. <br />26. WETLAND MITIGATION. The Developer shall follow all of the rules and regulations
The URL can be used to link to this page
Your browser does not support the video tag.