My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#06 - Northstar 2nd Addn DA
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
04-01-25
>
#06 - Northstar 2nd Addn DA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 9:59:06 AM
Creation date
8/15/2025 9:58:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15 <br />LA515\150\1011808.v2 <br />set forth in the Minnesota Wetland Conservation Act. The Developer shall complete wetland <br />mitigation/restoration in accordance with the approved Plans and in accordance with any <br />applicable Watershed or agency permits. If the mitigation work is found to be incomplete or <br />restoration is unsuccessful, the City may draw down the Security at any time during the warranty <br />period to perform the work if the Developer fails to take corrective measures after being provided <br />notice by the City. <br />27. BUILDING PERMITS/CERTIFICATES OF OCCUPANCY. <br />A. The City will not issue any building permits for any lot within the Subdivision, or within <br />a completed phase of the Subdivision in a City preapproved phasing plan, until such <br />time that sanitary sewer, water, storm sewer, curbing and one lift of asphalt has been <br />installed, tested, and verified by the City for all public streets; boulevard grading has <br />been completed within the entire right-of-way (without hold down grading for the <br />future sidewalk or any other improvements); street and traffic control signs are <br />installed; property monuments have been installed, grading as-built plans have been <br />submitted and approved by the City, and the Management Plan for the Stormwater <br />Reuse Irrigation System has been submitted and approved by the City. A <br />“preapproved phasing plan” is defined as a phased construction plan that has been <br />submitted by the Developer and approved by the City in advance of the <br />preconstruction meeting for the Subdivision. Once the construction has started, the <br />City will not consider revisions to the phasing plan for the purpose of issuing building <br />permits. <br />B. The City may issue up to a total of three (3) building permits for a “Model Home” if <br />authorized by the City Community Development Director before the completion of <br />the Subdivision Improvements described in paragraph 27 (A) above, however, the <br />Model Home Lot shall have the following in place before the City will allow
The URL can be used to link to this page
Your browser does not support the video tag.