My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#04 - Cost Share Agreement for CSAH 13 Improvements
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
06-03-25
>
#04 - Cost Share Agreement for CSAH 13 Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 10:07:43 AM
Creation date
8/15/2025 10:07:34 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Staff considered completing this work under a separate contract administered through the City of Lake <br />Elmo. After consideration it was determined that by partnering with Washington County to complete the <br />work, we would be able to capture an economy of scale through their contract for better pricing and also be <br />relieved of any costs for mobilization, restoration, and traffic control costs that comes along with excavating <br />to install the insulation. <br /> <br />Key elements of the agreement are as follows: <br />• The total estimated construction cost is $3,246,408.72. <br />• The total estimated cost share participation by Lake Elmo is $57,334.80. <br />• The city’s estimated cost share is not fixed. The agreement outlines the elements of the project that <br />the City will be responsible for, the invoicing and payment terms, and indicate that the City share <br />will be based on the actual costs incurred for those project elements. <br />• Project changes can be made and approved solely by the County, and the costs assigned to the City <br />by the County in accordance with the County Cost Participation Policy. The County must obtain <br />concurrence from the City regarding cost changes that exceed a 10% contingency over the <br />estimated City cost share. <br /> <br />FISCAL IMPACT: The County is requesting cost participation in the project by the City of Lake Elmo <br />for the actual construction costs for specified project components and line items, plus a prorated share of <br />the project engineering and construction administration costs. The current estimated cost share participation <br />by Lake Elmo is $57,334.80. The actual cost share will be determined once the project is complete, and <br />the final costs are known. The City intends to finance the improvements with payment from Water Fund. <br /> <br />The City’s share of the costs, as assigned by the County, include costs to excavate down to the the <br />watermain, place insulation, and replace the embankment material. Costs for mobilization, restoration, <br />grading, and traffic control will all be borne by Washington County. <br /> <br />OPTIONS: <br />• Approve the County Agreement. <br />• Do not approve the County Agreement. This will result in Lake Elmo pursuing a separate project <br />to insulate the watermain. <br /> <br />RECOMMENDATION: Staff is recommending that the City Council approve, as part of the consent <br />agenda, a Resolution approving the Cooperative Agreement between the City of Lake Elmo and <br />Washington County for Construction Cost of CSAH 13. If removed from the consent agenda, the <br />recommended motion for the action is as follows: <br /> <br />Motion to approve Resolution No. 2025-042 Approving Cooperative Agreement between the City of <br />Lake Elmo and Washington County for Construction Cost of CSAH 13. <br /> <br />ATTACHMENTS: <br /> <br />1. Resolution Approving Cooperative Agreement Between the City of Lake Elmo and Washington <br />County for Construction Cost of County State Aid Highway (CSAH) 13, Agreement No. 17410 <br />2. Cooperative Agreement Between the City of Lake Elmo and Washington County for Construction <br />Cost of County State Aid Highway (CSAH) 13, Agreement No. 17410 <br />3. Project Location Map <br />
The URL can be used to link to this page
Your browser does not support the video tag.