G-002 <br />GENERAL NOTES <br />GOVERNING SPECIFICATIONS <br />1.CITY OF LAKE ELMO (CITY) STANDARD SPECIFICATIONS AND REQUIREMENTS. <br />2.WASHINGTON COUNTY STANDARD SPECIFICATIONS AND REQUIREMENTS. <br />3.VALLEY BRANCH WATERSHED STANDARD SPECIFICATIONS AND REQUIREMENTS. <br />4.CITY/UTILITY PROVIDER SPECIFICATIONS, CITY ENGINEERS ASSOCIATION OF MINNESOTA (CEAM) STANDARD <br />SPECIFICATIONS FOR UTILITIES (LATEST EDITION), MPCA/MCES REQUIREMENTS, AND MINNESOTA PLUMBING CODE <br />(MINNESOTA RULES CHAPTER 4714) <br />5. APPLICABLE FEDERAL, STATE, AND LOCAL LAWS AND ORDINANCES <br />GENERAL NOTES <br />1.UNTIL REVISION BLOCK STATES "ISSUED FOR CONSTRUCTION", THE PLAN SET IS NOT CERTIFIED FOR <br />CONSTRUCTION AND CONTRACTOR IS BUILDING AT THEIR OWN RISK. <br />2.EXISTING CONDITIONS SHOWN ARE FROM A TOPOGRAPHIC SURVEY COMPLETED BY EGAN, FIELD & NOWAK, INC., <br />DATED JULY 2024. EXISTING FEATURES MAY NOT BE EXACT TO THEIR LOCATION. CONTRACTOR RESPONSIBLE FOR <br />VERIFYING THE CONDITIONS OF THE SITE AND MUST IMMEDIATELY NOTIFY THE ENGINEER IN WRITING OF <br />DISCREPANCIES OR VARIATIONS FROM THE DRAWINGS. <br />3.SUBSURFACE UTILITY INFORMATION IN THIS PLAN IS UTILITY QUALITY LEVEL D. THIS QUALITY LEVEL WAS <br />DETERMINED ACCORDING TO THE GUIDELINES OF CI/ASCE 38-2 ENTITLED “STANDARD GUIDELINES FOR THE <br />COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA”. EXACT LOCATION/DEPTH OF SUBSURFACE <br />UTILITIES SUCH AS GAS, TELEPHONE, FIBER OPTIC, SEWER, WATER, PIPELINES, ELECTRICAL, AND CABLE TV ARE <br />UNKNOWN AND THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. <br />4.CONTRACTOR RESPONSIBLE FOR CONTACTING GOPHER STATE ONE CALL (811 OR 1-800-252-1166) A MINIMUM OF 48 <br />HOURS IN ADVANCE (NOT INCLUDING THE DAY OF THE REQUEST AND EXCLUDING HOLIDAYS AND WEEKENDS) <br />BEFORE STARTING WORK FOR LOCATIONS OF UNDERGROUND UTILITIES. <br />5.QUANTITIES ARE APPROXIMATE, AND MAY VARY TO ALLOW COMPLETION OF WORK. <br />6.WORK AND MATERIALS MUST COMPLY WITH CITY, COUNTY, STATE, AND FEDERAL (INCLUDING OSHA) REGULATIONS <br />AND CODES. <br />7.CONTRACTOR SHALL COORDINATE AND MAINTAIN ACCESS TO ADJACENT PROPERTIES THROUGHOUT <br />CONSTRUCTION. <br />8.CONTRACTOR SHALL COORDINATE AND MAINTAIN MAIL, GARBAGE, AND RECYCLING SERVICES TO PROPERTIES <br />THROUGHOUT CONSTRUCTION. COORDINATE WITH LOCAL POSTMASTER, GARBAGE AND RECYCLING SERVICES. <br />9.CONTRACTOR SHALL COORDINATE AND MAINTAIN STORMWATER DRAINAGE CONVEYANCE THROUGHOUT <br />CONSTRUCTION (BOTH PIPED AND OVERLAND FLOW). <br />10.CONTRACTOR SHALL COORDINATE AND MAINTAIN WATER AND SANITARY FLOW TO AND FROM PROPERTIES. <br />PROVIDE BYPASS AND TEMPORARY SYSTEMS, AS NECESSARY. <br />11.CONTRACTOR SHALL COORDINATE AND MAINTAIN UTILITY SERVICES TO ADJACENT PROPERTIES AT ALL TIMES. <br />UTILITY SERVICE MUST NOT BE INTERRUPTED WITHOUT APPROVAL FROM OWNER, CITY, AND ADJACENT <br />PROPERTIES. <br />12.CONSTRUCTION LIMITS ARE TO PROPERTY LINE UNLESS SHOWN OR NOTED OTHERWISE. CONTRACTOR SHALL <br />RESTRICT CONSTRUCTION ACTIVITIES TO AREAS DESIGNATED ON PLANS WITHIN THE CONSTRUCTION LIMITS. <br />13.CONTRACTOR SHALL PRESERVE AND PROTECT EXISTING PAVEMENT, SITE FEATURES, UTILITIES, TREES, ETC., <br />UNLESS NOTED OR SHOWN OTHERWISE. <br />14.CONTRACTOR SHALL PHOTO OR VIDEO DOCUMENT EXISTING CONDITIONS OF TREES AND PLANTINGS, ADJOINING <br />CONSTRUCTION, SURFACES, AND SITE IMPROVEMENTS, ETC. TO REMAIN THAT MIGHT BE MISCONSTRUED AS <br />DAMAGE CAUSED BY CONSTRUCTION OPERATIONS. SUBMIT TO ENGINEER AND OWNER BEFORE CONSTRUCTION <br />BEGINS. USE ADEQUATELY DETAILED PHOTOGRAPHS OR VIDEO RECORDINGS. INCLUDE PLANS AND NOTATIONS TO <br />INDICATE SPECIFIC EXISTING DAMAGE CONDITIONS OF ITEMS DESIGNATED TO REMAIN. ANY DAMAGE TO THE <br />EXISTING PAVEMENT, CURBING, STRIPING, OR OTHER SITE FEATURE TO REMAIN MUST BE REPLACED BY THE <br />CONTRACTOR, TO OWNER'S SATISFACTION, AT NO ADDITIONAL COST TO THE OWNER. <br />15.CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT <br />PROPERTIES DURING CONSTRUCTION AND WILL BE HELD SOLELY RESPONSIBLE FOR ANY DAMAGES. <br />16.CONTRACTOR MUST IMMEDIATELY NOTIFY THE OWNER AND ENGINEER IN WRITING OF DISCREPANCIES OR <br />CONFLICTS IN THE CONTRACT DOCUMENTS BEFORE COMMENCING WORK. NO FIELD CHANGES OR DEVIATIONS <br />ARE TO BE MADE WITHOUT PRIOR WRITTEN APPROVAL FROM THE ENGINEER. FAILURE TO NOTIFY OWNER AND <br />ENGINEER OF AN IDENTIFIABLE CONFLICT BEFORE PROCEEDING WITH INSTALLATION RELIEVES OWNER AND <br />ENGINEER OF ANY OBLIGATION TO PAY FOR A RELATED CHANGE ORDER. <br />17.CONTRACTOR SHALL HAVE ONE COPY OF EACH REQUIRED CONSTRUCTION PERMIT AND ONE COPY OF THE MOST <br />CURRENT AND COMPLETE SET OF CONSTRUCTION DOCUMENTS (INCLUDING PLANS, SPECIFICATIONS, <br />GEOTECHNICAL REPORT, SPECIAL CONDITIONS AND PROVISIONS, ETC.) AVAILABLE AT THE PROJECT SITE AT ALL <br />TIMES. <br />18.CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR IMPLEMENTATION AND ENFORCEMENT OF SAFE WORK <br />PRACTICES, INCLUDING BUT NOT LIMITED TO PERSONNEL MONITORING, USE OF TRENCHING, SHEETING, AND <br />SHORING, SCAFFOLDING; MATERIALS HANDLING AND DRILLING; OPERATION OF EQUIPMENT; AND SAFETY OF <br />PUBLIC DURING PROGRESS OF WORK. <br />19.CONTRACTOR SHALL PLAN FOR AND ENSURE PERSONNEL COMPLY WITH PROVISIONS OF OSHA SAFETY AND <br />HEALTH STANDARDS (29 CFR 1910) AND GENERAL CONSTRUCTION STANDARDS (29 CFR 1926) AS APPROPRIATE. <br />20.CONTRACTOR SHALL BE RESPONSIBLE FOR INITIATING, MAINTAINING, AND SUPERVISING SAFETY PRECAUTIONS <br />AND PROGRAMS IN CONNECTION WITH WORK. CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS FOR SAFETY <br />OF EMPLOYEES ON PROJECT SITE AND OTHER PERSONS AND ORGANIZATIONS WHO MAY BE AFFECTED BY THE <br />PROJECT. CONTRACTOR'S DUTIES AND RESPONSIBILITIES FOR SAFETY IN CONNECTION WITH WORK SHALL <br />CONTINUE UNTIL SUCH TIME AS ALL WORK IS COMPLETED, AND ENGINEER HAS ISSUED NOTICE TO CONTRACTOR <br />THAT WORK IS COMPLETE. <br />21.HAZARDOUS MATERIALS, INCLUDING BUT NOT LIMITED TO OIL, GASOLINE, PAINT AND OTHER HAZARDOUS <br />SUBSTANCES MUST BE PROPERLY STORED, BY THE CONTRACTOR, INCLUDING SECONDARY CONTAINMENTS, TO <br />PREVENT SPILLS, LEAKS OR OTHER DISCHARGE. RESTRICTED ACCESS TO STORAGE AREAS MUST BE PROVIDED TO <br />PREVENT VANDALISM. STORAGE AND DISPOSAL OF HAZARDOUS WASTE MUST BE IN COMPLIANCE WITH <br />LOCAL/STATE/FEDERAL REGULATIONS. CONTRACTOR SHALL REMOVE SPILL OF FUELS, OILS, OR OTHER CHEMICALS <br />IMMEDIATELY UPON DETECTION. <br />22.IF CONSTRUCTION IS ANTICIPATED TO OCCUR DURING COLD WEATHER, IN THE EVENT THAT SNOW/ICE REMOVAL IS <br />REQUIRED FOR SITE ACCESS AND CONSTRUCTION ACTIVITIES, CONTRACTOR SHALL REMOVE SNOW/ICE AND <br />COORDINATE WITH OWNER FOR ACCEPTABLE SNOW/ICE STORAGE AREAS ONSITE. SNOW/ICE REMOVAL AND <br />STORAGE IS INCIDENTAL TO THE CONTRACT. <br />23.CONTRACTOR SHALL DOCUMENT AND MAINTAIN AS-BUILT INFORMATION AS CONSTRUCTION PROGRESSES AND IS <br />RESPONSIBLE FOR PROVIDING AS-BUILT DRAWINGS TO THE OWNER AS REQUIRED BY JURISDICTIONAL AGENCIES <br />FOR CERTIFICATION. ALL AS-BUILT DATA MUST BE COLLECTED BY A LICENSED PROFESSIONAL LAND SURVEYOR <br />REGISTERED IN THE PROJECT'S STATE WHOSE SERVICES ARE ENGAGED AND PAID FOR BY THE CONTRACTOR. <br />REMOVAL/DEMOLITION NOTES <br />1.SEE GENERAL NOTES FOR ADDITIONAL PROJECT AND SITE INFORMATION. <br />2.CONTRACTOR SHALL OBTAIN PERMITS REQUIRED FOR DEMOLITION, REMOVAL AND DISPOSAL. <br />3.CONTRACTOR SHALL REVIEW FEATURES NOT SPECIFICALLY IDENTIFIED ON PLAN FOR SALVAGE OR REMOVAL <br />THAT CONFLICT WITH CONSTRUCTION WITH THE ENGINEER. <br />4.MATERIALS REMOVED/DEMOLISHED BY CONTRACTOR BECOME PROPERTY OF THE CONTRACTOR, UNLESS <br />OTHERWISE NOTED. CONTRACTOR SHALL LOAD AND HAUL MATERIAL OFF-SITE AND PROPERLY DISPOSE OF <br />MATERIALS IN ACCORDANCE WITH APPLICABLE REGULATIONS. CONTRACTOR MUST LEAVE THE SITE IN A <br />CONDITION TO THE SATISFACTION OF THE OWNER AND ENGINEER. <br />5.CONTRACTOR SHALL SAWCUT FULL DEPTH AT PAVEMENT REMOVAL LIMITS AND AS NECESSARY TO CREATE A <br />SMOOTH FIT/TRANSITION ALONG MATCHING PAVEMENT AREAS. <br />REMOVAL/DEMOLITION NOTES (CONT.) <br />6.CONTRACTOR SHALL COORDINATE UTILITY REMOVAL WORK WITH APPROPRIATE UTILITY OWNER. <br />7.CONTRACTOR SHALL SALVAGE AND REINSTALL STREET AND TRAFFIC SIGNS IN CONFLICT WITH CONSTRUCTION <br />ACTIVITIES AS NOTED OR AS DIRECTED BY ENGINEER. IF SIGNS ARE DAMAGED DURING CONSTRUCTION, <br />CONTRACTOR REQUIRED TO PROVIDE NEW SIGNS AT NO ADDITIONAL COST TO THE OWNER. <br />8.CONTRACTOR SHALL SALVAGE AND REINSTALL FENCE IN CONFLICT WITH CONSTRUCTION ACTIVITIES AS NOTED <br />OR AS DIRECTED BY ENGINEER. IF FENCE IS DAMAGED DURING CONSTRUCTION, CONTRACTOR REQUIRED TO <br />PROVIDE NEW FENCE, TO OWNER'S SATISFACTION, AT NO ADDITIONAL COST TO THE OWNER. <br />9.IN THE EVENT THAT UNKNOWN CONTAINERS OR TANKS ARE ENCOUNTERED, THE CONTRACTOR MUST CONTACT <br />THE ENGINEER IMMEDIATELY. ALL CONTAINERS OR TANKS MUST BE DISPOSED OF PROPERLY AT A <br />REGULATED/PERMITTED FACILITY. <br />10.UNLESS OTHERWISE NOTED, CONTRACTOR IS RESPONSIBLE FOR REMOVAL/DEMOLITION WITHIN ALL AREAS OF <br />PROPOSED IMPROVEMENTS. REMOVAL LIMITS ARE IDENTIFIED ON THE DRAWINGS IN ANTICIPATED LOCATIONS. <br />CONTRACTOR RESPONSIBLE FOR REMOVALS AS NECESSARY TO CONSTRUCT NEW IMPROVEMENTS AND CONFORM <br />TO DESIGN REQUIREMENTS. ALL FACILITIES TO BE REMOVED MUST BE UNDERCUT TO SUITABLE MATERIAL AND <br />BROUGHT TO GRADE WITH SUITABLE FILL MATERIAL IN ACCORDANCE WITH THE SPECIFICATIONS AND AS DIRECTED <br />BY THE ENGINEER <br />SITE NOTES <br />1.SEE GENERAL NOTES FOR ADDITIONAL PROJECT AND SITE INFORMATION. <br />2.REFER TO THE ARCHITECTURAL, STRUCTURAL, LANDSCAPE, AND MEP PLANS FOR EXACT LOCATIONS OF AND <br />DIMENSIONS OF BUILDINGS, VESTIBULES, STOOPS, OVERHANGS, COLUMNS, RAMPS, SIDEWALKS, TRASH <br />ENCLOSURES, TRAFFIC GATES, MONUMENT SIGNS, LANDSCAPING, PLANTINGS, TREES, SITE LIGHTING, EXTERIOR <br />ELECTRICAL, BACKFLOW PREVENTORS AND BUILDING UTILITY ENTRANCE LOCATIONS. <br />3.BUILDING LINES SHOWN ARE APPROXIMATE OUTSIDE LINES OF BUILDINGS AT GRADE, MAY NOT ACCOUNT FOR <br />EXTRUSIONS (I.E. BALCONIES, OVERHANGS, LIGHTING, ETC.) ABOVE GRADE, AND ARE BASED ON INFORMATION <br />PROVIDED TO STANTEC BY THE ARCHITECT. CONTRACTOR SHALL VERIFY FINAL BUILDING PLANS WITH ARCHITECT. <br />4.CONTRACTOR AND SURVEYOR SHALL FIELD VERIFY THE BUILDING FOOTPRINT/OUTLINE AND OUTER MOST <br />EXTRUSIONS PRIOR TO CONSTRUCTION TO REVIEW POTENTIAL CONFLICTS WITH ADJACENT WORK, EXISTING SITE <br />FEATURES, PROPERTY LINES, SETBACKS, ETC. <br />5.CONCRETE GUTTER PAN TO TIP IN THE SAME DIRECTION AS THE ADJACENT PAVEMENT. <br />6.DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. <br />7.TOLERANCES: <br />A.RETAINING WALL TOLERANCES: VERTICAL ALIGNMENT: +/- 1.5 INCHES OVER ANY 10-FT DISTANCE. HORIZONTAL <br />ALIGNMENT: +/- 1.5 INCHES OVER ANY 10-FT DISTANCE. WALL BATTER: WITHIN 2 DEGREES OF DESIGN BATTER. <br />OVERALL WALL BATTER SHALL BE GREATER THAN 0 DEGREES. CORNERS AND CURVES: +/- 1 FT TO THEORETICAL <br />LOCATION. MAX HORIZONTAL GAP BETWEEN UNITS: LESS THAN OR EQUAL TO 0.5 INCHES. <br />PAVING, PAVEMENT MARKING, AND SIGNAGE NOTES <br />1.SEE GENERAL NOTES FOR ADDITIONAL PROJECT AND SITE INFORMATION. <br />2.CONTRACTOR SHALL MAINTAIN STREET AND TRAFFIC SIGNS AT ALL TIMES DURING CONSTRUCTION. <br />3.SIGNS, PAVEMENT MARKINGS, AND OTHER TRAFFIC CONTROL DEVICES MUST BE IN ACCORDANCE WITH THE <br />STATE'S MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND THE APPLICABLE ROAD AUTHORITY <br />STANDARDS. <br />4.THE PAVEMENT SURFACE SHALL BE CLEANED AT THE DIRECTION OF THE APPLICABLE ROAD AUTHORITY AND THE <br />ENGINEER JUST PRIOR TO APPLICATION OF PAVEMENT MARKINGS. PAVEMENT CLEANING SHALL CONSIST OF AT <br />LEAST BRUSHING WITH A ROTARY BROOM (NON-METALLIC) OR AS RECOMMENDED BY THE MATERIALS <br />MANUFACTURER AND ACCEPTABLE TO THE APPLICABLE ROAD AUTHORITY AND THE ENGINEER. <br />5.THE PAVEMENT MARKING APPLICATION SHALL IMMEDIATELY FOLLOW THE PAVEMENT CLEANING. <br />6.PAVEMENT MARKING EDGE LINES ARE TO BE BROKEN ONLY AT INTERSECTION WITH PUBLIC ROADS AND PRIVATE <br />ENTRANCES IF THEY ARE CONTROLLED BY A YIELD SIGN, STOP SIGN OR TRAFFIC SIGNAL. THE BREAK POINT IS TO <br />BE AT THE START OF THE RADIUS FOR THE INTERSECTION OR AT MARKED STOP LINES. <br />7.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PAVEMENT MARKING RELATED ACTIVITIES, SUCH AS, BUT NOT <br />LIMITED TO, COLLECTING DATA FROM IN PLACE LANE LINES, MARKING PERMANENT MARKING ALIGNMENTS, <br />NECESSARY 'SPOTTING' AT APPROPRIATE POINTS AND TO DETERMINE NECESSARY STARTING AND CUTOFF <br />POINTS. EXACT LOCATION OF PAVEMENT MARKINGS TO BE FIELD LOCATED BY THE ENGINEER. <br />8.THE CONTRACTOR SHALL HAVE A MINIMUM OF 2 PEOPLE WITH CURRENT ACI CONCRETE FLATWORK TECHNICIAN <br />OR FLATWORK FINISHER CERTIFICATION, AND AT LEAST ONE OF THEM MUST BE ONSITE FOR ALL CONCRETE <br />POURS. <br />9.PROTECT CONCRETE PAVING FROM DAMAGE. EXCLUDE TRAFFIC FROM PAVING FOR A MINIMUM OF 14 DAYS AFTER <br />PLACEMENT. WHEN CONSTRUCTION TRAFFIC IS PERMITTED, MAINTAIN PAVING AS CLEAN AS POSSIBLE BY <br />REMOVING SURFACE STAINS AND SPILLAGE OF MATERIALS AS THEY OCCUR. MAINTAIN CONCRETE FREE OF <br />STAINS, DISCOLORATION, DIRT, AND OTHER FOREIGN MATERIALS. SWEEP PAVING NOT MORE THAN TWO DAYS <br />BEFORE DATE SCHEDULED FOR SUBSTANTIAL COMPLETION INSPECTIONS. REPAIR OR REPLACE <br />STAINED/DISCOLORED CONCRETE TO THE SATISFACTION OF THE OWNER AT NO COST TO THE OWNER. <br />10.CONSTRUCTION AND MATERIALS WITHIN PUBLIC RIGHT-OF-WAY MUST BE IN ACCORDANCE WITH APPLICABLE ROAD <br />AUTHORITY'S SPECIFICATIONS AND STANDARDS. DOT SPECIFICATIONS AND STANDARDS APPLY IF NOT COVERED <br />BY LOCAL OR COUNTY REGULATIONS. PAVING, PAVEMENT MARKINGS, AND SIGNAGE WITHIN THE SITE SHALL MEET <br />THE FOLLOWING REQUIREMENTS: <br />A.BITUMINOUS: CONFORM TO MN/DOT SPEC 2360 <br />1)WEARING COURSE MIX DESIGN: SPWEA340B <br />2)NON-WEARING COURSE MIX DESIGN: SPNWB330B <br />3)RECYCLED MATERIALS: WEARING COURSES - 10% MAX RAP, NO RAS ALLOWED. NON-WEARING COURSES - 20% <br />MAX RAP <br />4)TACK COAT: MN/DOT SPEC 2357, EMULSIFIED ASPHALT, CATIONIC, CSS-1 OR CSS-1H <br />B.MAXIMUM ALLOWABLE BITUMINOUS LIFT THICKNESS SHALL NOT EXCEED 3 INCHES. MINIMUM LIFT THICKNESS <br />SHALL BE IN ACCORDANCE WITH THE FOLLOWING: 1.5 INCHES FOR MIXES WITH 0.5 INCH MAX AGGREGATE SIZE <br />(SP 9.5); 2 INCHES FOR MIXES WITH 0.75 INCH MAX AGGREGATE SIZE (SP 12.5); 0.75 INCHES FOR MIXES WITH <br />0.375 INCH MAX AGGREGATE SIZE (SP 4.75) <br />C.PLACE TACK COAT BETWEEN NEW SURFACE AND EACH NEW LIFT AT A RATE OF 0.05 GALLONS PER SQUARE <br />YARD. <br />D.CONCRETE SIDEWALK/DRIVEWAYS/SLABS MATERIALS: MN/DOT SPEC 2461 <br />1)MANUAL PLACEMENT MIX DESIGN: MN/DOT MIX 3F52A <br />2)FLY ASH: CLASS F <br />E.CONCRETE CURB AND GUTTER MATERIALS: MN/DOT SPEC 2461 <br />1)MANUAL PLACEMENT: MN/DOT 3F52 <br />2)SLIP FORM PLACEMENT: MN/DOT 3F32 <br />F.CONCRETE METAL REINFORCEMENT: <br />1)REINFORCING BARS: DEFORMED GRADE 60 BARS CONFORMING TO ASTM A615 AND A996. COATING: EPOXY <br />COATED IN ACCORDANCE WITH ASTM A775 OR ASTM A934. <br />2)TIE WIRE: PLASTIC OR NYLON-COATED TIE WIRES IN CONFORMANCE WITH MN/DOT SPEC 2472. <br />3)BAR SUPPORTS: CONFORM TO "BAR SUPPORT SPECIFICATIONS AND STANDARD NOMENCLATURE", CRSI <br />MANUAL OF STANDARD PRACTICE. <br />PAVING, PAVEMENT MARKING, AND SIGNAGE NOTES (CONT.) <br />G.CONCRETE ISOLATION/EXPANSION JOINT MATERIAL: MN/DOT SPEC 3702, TYPE D-1 OR D-2 FROM MN/DOT'S <br />APPROVED PRODUCT LIST. PROVIDE SINGLE COMPONENT, GUN GRADE POLYURETHANE JOINT SEALANT IN <br />ACCORDANCE WITH ASTM C920, LIGHT GRAY COLOR TO MATCH CONCRETE COLOR. PROVIDE BACKER ROD AS <br />RECOMMENDED BY JOINT MANUFACTURER. <br />H.CONCRETE CURING MATERIALS: MN/DOT SPEC 3754 (POLY-AMS MEMBRANE) <br />I.SILANE/SILOXANE CONCRETE SEALER: SILOXA-TEK 8500, OKON S40, ARMOR SX5000, OR APPROVED EQUAL. <br />SHALL BE APPLIED PER MANUFACTUER INSTRUCTIONS. SHALL BE APPLIED ON A CLEAN, DRY, AND ABSORBENT <br />SURFACE THAT HAS BEEN CURED FOR AT LEAST 28 DAYS PRIOR TO APPLICATION. SHALL BE APPLIED TO A <br />SURFACE THAT IS ABOVE 40 DEGREES FAHRENHEIT AND WILL NOT FREEZE FOR AT LEAST 24 HOURS. <br />APPLICATION RATE SHALL BE MONITORED AND BE GREATER THAN MANUFACTURERS RECOMMENDATIONS. <br />J.CONCRETE CURING AND SEALER ALTERNATE: TK PRODUCTS ONE-STEP CURING AND SEALING PRODUCT OR <br />EQUAL. SHALL BE APPLIED PER MANUFACTUER INSTRUCTIONS. SHALL BE APPLIED TO A SURFACE THAT IS <br />ABOVE 40 DEGREES FAHRENHEIT AND WILL NOT FREEZE FOR AT LEAST 24 HOURS. APPLICATION RATE SHALL BE <br />MONITORED AND BE GREATER THAN MANUFACTURERS RECOMMENDATIONS. <br />K.CONCRETE PLACING, FINISHING, CURING, AND PROTECTION: CONFORM TO MN/DOT SPECS 2461, 2521, AND 2531, <br />AND APPLICABLE ACI STANDARDS. <br />1)FOR HOT WEATHER PLACEMENT, COMPLY WITH ACI 305 HOT WEATHER CONCRETING (LATEST EDITION). <br />2)FOR COLD WEATHER PLACEMENT, COMPLY WITH ACI 306 COLD WEATHER CONCRETING (LATEST EDITION). DO <br />NOT PLACE CONCRETE IN AIR TEMPERATURE LESS THAN 40 DEGREES F WITHOUT APPROVAL OF THE <br />ENGINEER. <br />3)PRIOR TO POURING ANY EXTERIOR CONCRETE FLATWORK/SLAB, CONTRACTOR MUST VERIFY THE PREDICTED <br />COMBINATION OF AIR TEMPERATURE, RELATIVE HUMIDITY, CONCRETE TEMPERATURE AND WIND VELOCITY <br />WILL NOT EXCEED AN EVAPORATION RATE OF 0.20 POUNDS PER SQUARE FOOT OF SURFACE AREA PER HOUR <br />IN ACCORDANCE WITH ACI 305 (LATEST EDITION). THE WEATHER MUST ALSO BE LESS THAN 30% CHANCE OF <br />PRECIPITATION FOR THE ENTIRE PLACEMENT WINDOW, AND 2 HOURS FOLLOWING EXPECTED COMPLETION. IF <br />EITHER OF THESE CONDITIONS ARE NOT MET, THE POUR MUST BE POSTPONED UNTIL IT CAN MEET THESE <br />REQUIREMENTS. <br />4)INSTALLATION FORM: CONTRACTOR OR INDEPENDENT TESTING AGENCY IS REQUIRED TO FILL OUT AND <br />SUBMIT THE ENGINEER'S EXTERIOR CONCRETE INSTALLATION FORM AT THE END OF THE DAY OF EACH POUR. <br />CONTACT THE ENGINEER TO OBTAIN THE FORM. <br />5)APPLY CURING COMPOUND AT A MINIMUM RATE OF 1 GALLON PER 150 SQ FT SURFACE CURING AREA OR <br />MANUFACTURER RECOMMENDED APPLICATION RATE, WHICHEVER IS GREATER. <br />6)CONSTRUCT TEMPORARY WIND BREAKS AS NECESSARY TO REDUCE WIND VELOCITY/DRYING/EXPOSURE. <br />7)CONSTRUCT TEMPORARY SUNSHADES AS NECESSARY TO REDUCE CONCRETE TEMPERATURES/EXPOSURE. <br />8)CONTRACTOR SHALL PROTECT ALL CONCRETE SLABS THROUGHOUT CONSTRUCTION FROM HEAVY <br />EQUIPMENT, VIBRATIONS, ADJACENT WORK, ETC. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL <br />CONCRETE DAMAGED DURING CONSTRUCTION AND SHALL REPLACE AT NO ADDITIONAL COST TO THE OWNER. <br />L.AGGREGATE BASE: SEE DETAILS. <br />M.PAVEMENT MARKINGS: MN/DOT SPEC 2582 <br />1)PAVEMENT STRIPES: MN/DOT SPEC 3591 (WATER-BASED TRAFFIC PAINT) WITH DROP ON GLASS BEADS IN <br />ACCORDANCE WITH MN/DOT SPEC 3592. <br />2)PAVEMENT MESSAGES (ARROWS): MN/DOT SPEC 3591 (WATER-BASED TRAFFIC PAINT) WITH DROP ON GLASS <br />BEADS IN ACCORDANCE WITH MN/DOT SPEC 3592. <br />3)INSTALLERS OF THERMOPLASTIC MUST CARRY A CARD CERTIFYING THAT THEY HAVE ATTENDED A TRAINING <br />SESSION THAT ADDRESSES SURFACE PREPARATIONS AND ALL APPLICATION REQUIREMENTS AND <br />TECHNIQUES NECESSARY FOR SUCCESSFUL APPLICATIONS. <br />4)PRIOR TO APPLYING PAVEMENT MARKINGS, ALLOW NEW PAVEMENT TO CURE A MINIMUM OF 14 DAYS OR <br />FOLLOW MANUFACTURER'S SPECIFICATION FOR PAVEMENT CURE TIME, WHICHEVER IS GREATER. <br />P.SIGNAGE: CONFORM TO MN/DOT SPECS 2564, 3352 (SIGNS, DELINEATORS, AND MARKERS), AND 3402 (SQUARE <br />TUBULAR SIGN POSTS). ALL SIGNS/POSTS SHALL MEET CRASHWORTHY REQUIREMENTS OF MASH-16. SIGNS <br />SHALL INCLUDE NUMBER AND SIZE OF POSTS IN ACCORDANCE WITH MN/DOT WIND LOADING CHART FOR SIGNS <br />ON SQUARE TUBE POSTS. MOUNT SIGNS IN ACCORDANCE WITH SQUARE TUBE SIGN MOUNTING MN/DOT <br />STANDARD PLANS AND DETAIL SHEETS. SEE MN/DOT STANDARD SIGNS MANUAL FOR PUNCHING CODE AND <br />DETAILED DRAWINGS OF TYPE "C" AND TYPE "D" SIGNS PANELS. SEE MN/DOT MINNESOTA MANUAL ON UNIFORM <br />TRAFFIC CONTROL DEVICES PART II FOR DETAILS OF TRAFFIC SIGN INSTALLATION. MINIMUM VERTICAL <br />CLEARANCE IS 7 FOOT. SEE MMUTCD FOR DETAILS. <br />11.CONTRACTOR SHALL PROVIDE CONCRETE JOINTS AS FOLLOWS: <br />B.CONTROL JOINTS - MAINTAIN AN ASPECT RATIO (LENGTH TO WIDTH) BETWEEN CONTROL JOINTS AS CLOSE TO 1:1 <br />AS FEASIBLE. DO NOT EXCEED ASPECT RATIO GREATER THAN 1.5:1. MATCH EXISTING PATTERN WHERE <br />APPLICABLE, VERIFY WITH OWNER. MAXIMUM CONTROL JOINT SPACING SHALL BE 24 TIMES THE SLAB THICKNESS <br />UP TO A MAXIMUM OF 12 FEET (I.E. 4-INCH-THICK SLAB = 96 INCH (8 FOOT) MAXIMUM CONTROL JOINT SPACING IN <br />ANY DIRECTION, 8-INCH-THICK SLAB IS 12 FEET) <br />1)JOINT INTERSECTION ANGLES LESS THAN 60 DEGREES WILL NOT BE ALLOWED <br />2)PANEL WIDTHS LESS THAN 6 INCHES AT ANY POINT WILL NOT BE ALLOWED <br />3)JOINTING MUST ACCOMMODATE IN-PAVEMENT STRUCTURES THROUGH JOINTING AND BOXOUTS <br />4)CONTRACTOR MUST SUBMIT A JOINTING PLAN FOR ENGINEER ACCEPTANCE. <br />C.EXPANSION/ISOLATION JOINTS - PROVIDE AT THE FOLLOWING: <br />1)JOINT INTERSECTION ANGLES LESS THAN 60 DEGREES WILL NOT BE ALLOWED <br />2)LOCATIONS WHERE CHANGES IN WIDTH OCCUR <br />3)LOCATIONS WHERE ADJOINING EXISTING CONCRETE <br />4)LOCATIONS THAT ABUT THE BUILDING AND OTHER SITE FEATURES INCLUDING RAMPS, STAIRS, LANDINGS, <br />CONCRETE APRONS, ARCHITECTURAL AND LANDSCAPE FEATURES, ETC. <br />5)LOCATIONS IN CHANGES IN DEPTH (INCLUDING PAVEMENT ADJACENT TO CURB). <br />D.WHEREVER POSSIBLE MATCH JOINTS OF ADJACENT CONCRETE WORK. <br />12.FIELD QUALITY CONTROL: <br />A.AGGREGATE BASE TESTING REQUIREMENTS AND FREQUENCY: TEST SUBGRADE AND AGGREGATE BASE IN <br />ACCORDANCE WITH MN/DOT SPECS, MN/DOT SCHEDULE OF MATERIALS CONTROL, AND GEOTECHNICAL REPORT <br />RECOMMENDATIONS. <br />B.CONCRETE TESTING REQUIREMENTS AND FREQUENCY: TEST CONCRETE AIR CONTENT (ASTM C231), CONCRETE <br />SLUMP (ASTM C143), AIR AND CONCRETE TEMPERATURE, AND 7- AND 28-DAY COMPRESSIVE STRENGTH (ASTM <br />C31, C39, AND C172). WHERE APPLICABLE, TEST IN ACCORDANCE WITH MN/DOT SCHEDULE OF MATERIALS <br />CONTROL. <br />C.BITUMINOUS TESTING REQUIREMENTS AND FREQUENCY: ALL BITUMINOUS PAVEMENT DENSITY SHALL CONFORM <br />TO MN/DOT SPEC 2360.3.D.2 - ORDINARY COMPACTION METHOD. CONTRACTOR SHALL ESTABLISH A ROLL <br />PATTERN FOR EACH COURSE OF PAVING EACH DAY. TEST EXTRACTION/GRADATION/AIR VOIDS, ONE EACH PER <br />BITUMINOUS PAVING DAY PER MIX DESIGN. <br />D.GRANULAR BASE TESTING REQUIREMENTS AND FREQUENCY: GRANULAR BASE (PARKING LOT) - ONE DCP <br />DENSITY TEST AND ONE MOISTURE TEST PER 1000 SQ FT OF PARKING LOT <br />13.TOLERANCES: <br />A.BITUMINOUS PAVEMENT: CONFORM TO MN/DOT SPEC 2360.3.E, EXCEPT AS MODIFIED HEREIN: DEVIATIONS <br />ALONG ADA ACCESSIBLE ROUTES THAT EXCEED THE MAXIMUM SLOPES WILL BE CONSIDERED UNACCEPTABLE. <br />HORIZONTAL/LINE DEVIATIONS IN LOCATION GREATER THAN ±1 INCH WILL BE CONSIDERED UNACCEPTABLE. ANY <br />SURFACE AREA ALLOWING ENTRAPMENT OF WATER AT A DEPTH OF 1/4 INCH OR GREATER WILL BE CONSIDERED <br />UNACCEPTABLE. REMOVE AND REPLACE UNACCEPTABLE WORK AS DIRECTED BY THE ENGINEER AT NO <br />ADDITIONAL COST TO THE OWNER. <br />PAVING, PAVEMENT MARKING, AND SIGNAGE NOTES (CONT.) <br />B.CONCRETE PAVEMENT: CONFORM TO MN/DOT SPEC 2521.3.D.3, EXCEPT AS MODIFIED HEREIN: VERTICAL <br />DEVIATIONS IN SURFACE GREATER THAN ±3/16 INCH WILL BE CONSIDERED UNACCEPTABLE. DEVIATIONS ALONG <br />ADA ACCESSIBLE ROUTES THAT EXCEED THE MAXIMUM SLOPES WILL BE CONSIDERED UNACCEPTABLE. <br />HORIZONTAL/LINE DEVIATIONS IN LOCATION GREATER THAN ±1/2 INCH WILL BE CONSIDERED UNACCEPTABLE. <br />ANY SURFACE AREA ALLOWING ENTRAPMENT OF WATER AT A DEPTH OF 1/8 INCH OR GREATER WILL BE <br />CONSIDERED UNACCEPTABLE. RANDOM AND UNCONTROLLED CRACKING WILL BE CONSIDERED UNACCEPTABLE. <br />REPLACE CONCRETE PAVEMENT AS DIRECTED BY ENGINEER AND OWNER. PERFORM PAVEMENT REPLACEMENT <br />AT NO ADDITIONAL COST TO THE OWNER. REMOVE AND REPLACE UNACCEPTABLE WORK AS DIRECTED BY THE <br />ENGINEER AT NO ADDITIONAL COST TO THE OWNER. <br />C.CONCRETE CURB AND GUTTER: CONFORM TO MN/DOT SPEC 2531.3. DEVIATIONS ALONG ADA ACCESSIBLE <br />ROUTES THAT EXCEED THE MAXIMUMS WILL BE CONSIDERED UNACCEPTABLE. <br />D.PAVEMENT MARKINGS: CONFORM TO MN/DOT SPEC 2582.3.C, EXCEPT AS MODIFIED HEREIN: LINE WIDTH <br />DEVIATIONS LESS THAN OR EQUAL TO ±1/4 INCH FROM THE SPECIFIED WIDTH WILL BE ALLOWED FOR STRIPING <br />PROVIDED THE VARIATION IS GRADUAL AND DOES NOT DETRACT FROM THE GENERAL APPEARANCE. BROKEN <br />LINE SEGMENTS LESS THAN OR EQUAL TO ±1/4 FOOT FROM THE SPECIFIED LENGTHS WILL BE ALLOWED FOR <br />STRIPING. ALIGNMENT DEVIATIONS FROM THE CONTROL GUIDE SHALL NOT EXCEED 2 INCHES. MATERIAL SHALL <br />NOT BE APPLIED OVER LONGITUDINAL JOINTS. ESTABLISHMENT OF APPLICATION TOLERANCES SHALL NOT <br />RELIEVE THE CONTRACTOR OF THEIR RESPONSIBILITY TO COMPLY AS CLOSELY AS PRACTICABLE WITH THE <br />PLANNED DIMENSIONS. <br />14.CONTRACTOR SHALL INSTALL A MINIMUM OF 6 INCHES AGGREGATE BASE PAST THE BACK OF CURB, SEE DETAILS. <br />GRADING AND EROSION CONTROL - 600A,B <br />1.THE CONTRACTOR SHALL CONDUCT OPERATIONS AND IMPLEMENT MINNESOTA POLLUTION CONTROL AGENCY <br />(MPCA) BEST MANAGEMENT PRACTICES (BMP) TO CONTROL SITE SILTATION AND EROSION INTO DRAINAGE WAYS. <br />THE CONTRACTOR SHALL COMPLY WITH ALL CONDITIONS AND COMPLETION DATES RELATIVE TO ALL PERMITS <br />ISSUED FOR THE WORK TO BE COMPLETED. THE ENGINEER MAY ISSUE A STOP WORK ORDER FOR ALL <br />DEVELOPMENT WORK AND BUILDING CONSTRUCTION FOR NONCOMPLIANCE WITH THESE MEASURES. <br />2.SEQUENCING. ALL SILT FENCE AND OTHER EROSION CONTROL MEASURES SHALL BE IN PLACE AND APPROVED BY <br />ENGINEER PRIOR TO ANY REMOVALS, EXCAVATION OR CONSTRUCTION AND SHALL BE MAINTAINED UNTIL VIABLE <br />TURF OR GROUND COVER HAS BEEN ESTABLISHED AND APPROVED BY THE ENGINEER. <br />3.SILT FENCE. THE CONTRACTOR SHALL INSTALL SILT FENCE AT THE LOCATIONS SHOWN ON THE PLANS AND IN <br />ACCORDANCE WITH THE CITY STANDARD DETAILS. SILT FENCE DAMS AND INTERIM SUMPS SHALL BE PLACED TO <br />INTERCEPT SILT FROM CONCENTRATED RUNOFF FROM OPEN GRADED AREAS. ADDITIONAL SILT FENCE SHALL BE <br />REQUIRED AS DIRECTED BY THE ENGINEER. <br />4.STOCKPILES. ALL STOCKPILE AREAS SHALL HAVE SILT FENCE OR SEDIMENT TRAPPING SYSTEMS PLACED <br />AROUND THE ENTIRE PERIMETER. <br />5.INLET PROTECTION. THE CONTRACTOR SHALL INSTALL INLET PROTECTION ON ALL EXISTING STORM SEWER <br />INLETS IN ACCORDANCE WITH THE CITY STANDARD DETAILS. INLET PROTECTION SHALL ALSO BE PROVIDED ON <br />ALL PROPOSED STORM SEWER INLETS IMMEDIATELY FOLLOWING CONSTRUCTION OF THE INLET. INLET <br />PROTECTION MUST BE INSTALLED IN A MANNER THAT WILL NOT IMPOUND WATER FOR EXTENDED PERIODS OF <br />TIME OR IN A MANNER THAT PRESENTS A HAZARD TO VEHICULAR OR PEDESTRIAN TRAFFIC. <br />6.TEMPORARY SEDIMENT BASINS. THE CONTRACTOR SHALL INCORPORATE TEMPORARY SEDIMENT BASINS <br />THROUGHOUT THE CONSTRUCTION SITE TO CAPTURE RUNOFF AND SLOW THE FLOW OF WATER AND ALLOW <br />SEDIMENT TO SETTLE OUT. TEMPORARY SEDIMENT BASINS SHALL BE INSTALLED AS DIRECTED BY THE CITY <br />ENGINEER. <br />7.ROCK CONSTRUCTION ENTRANCE. A ROCK ENTRANCE SHALL BE CONSTRUCTED AND MAINTAINED AS SHOWN ON <br />THE PLAN TO REDUCE TRACKING OF SILT AND DIRT ONTO THE PUBLIC STREETS. A GEOTEXTILE FABRIC SHALL BE <br />PLACED UNDERNEATH THE ROCK. THE ROCK SHALL BE PERIODICALLY REPLENISHED TO MAINTAIN THE INTENDED <br />PERFORMANCE. MUD AND DEBRIS SHALL BE REMOVED OR SCRAPED FROM TIRES AND VEHICLE UNDERCARRIAGE <br />PRIOR TO LEAVING THE SITE. <br />8.STREET SWEEPING. ALL STREETS USED FOR ACCESS TO THE SITE AND HAUL ROUTES USED FOR CONSTRUCTION <br />EQUIPMENT AND MATERIAL SUPPLIES SHALL BE CLEANED AT THE END OF EACH WORKING DAY. THE CITY OR <br />ENGINEER MAY ORDER ADDITIONAL SWEEPING OF THE STREETS AS DEEMED REQUIRED AT <br />DEVELOPER/CONTRACTOR EXPENSE. <br />9.DEWATERING. EACH EXCAVATION SHALL BE KEPT DRY DURING THE COURSE OF ALL WORK HEREIN, INCLUDING <br />SUBGRADE CORRECTION, PIPE INSTALLATION, STRUCTURE CONSTRUCTION AND BACKFILLING, TO THE EXTENT <br />THAT NO DAMAGE FROM HYDROSTATIC PRESSURE, FLOATATION OR OTHER DAMAGE RESULTS. ALL EXCAVATIONS <br />SHALL BE DEWATERED TO A DEPTH OF AT LEAST 3 INCHES BELOW THE BOTTOM OF THE CONCRETE SLAB OR PIPE <br />TO BE INSTALLED THEREIN. THE CONTRACTOR MAY USE ANY METHOD OR COMBINATION OF METHODS FOR FOR <br />DEWATERING HE CHOOSES; HOWEVER, ALL DEWATERING METHODS AND EQUIPMENT WHICH IN THE OPINION OF <br />THE ENGINEER, ARE INEFFECTIVE SHALL BE ABANDONED, IMPROVED, REPLACED OR THERWISE ALTERED TO <br />OBTAIN EFFECTIVE DEWATERING. THE CONTRACTOR SHALL PROVIDE ALL POWER, PUMPS, MATERIALS AND <br />APPARATUS NECESSARY, AND SHALL BE RESPONSIBLE FOR DISPOSING OF THE WATER PUMPED FROM THE <br />EXCAVATION IN A MANNER WHICH WILL NOT INTERFERE WITH OTHER WORK WITHIN THE AREA AND NOT TO <br />DAMAGE PUBLIC OR PRIVATE PROPERTY. THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR THE CONDITION OF <br />ANY PIPE, CONDUIT, DITCH, CHANNEL OR NATURAL WATERCOURSE UTILIZED FOR DRAINAGE PURPOSES, AND ALL <br />EROSION, SEDIMENT OR OTHER ADVERSE RESULTS OF THEIR USE SHALL BE REPAIRED. <br />10.POSITIVE DRAINAGE AND PROTECTION. THE CONTRACTOR SHALL MAINTAIN POSITIVE DRAINAGE THROUGHOUT <br />THE SITE AT ALL TIMES. LOW POINTS WITHIN AND ALONG ROADWAYS ARE EXPRESSLY PROHIBITED. THE <br />CONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARY DITCHES, PIPING OR OTHER MEANS TO FACILITATE <br />PROPER DRAINAGE DURING CONSTRUCTION. TO PROTECT PREVIOUSLY GRADED AREAS FROM EROSION, WOOD <br />FIBER BLANKET SHALL BE PLACED IMMEDIATELY ON STEEP SLOPES (1:3 OR GREATER) AND EMBANKMENTS, <br />PERMANENT AND TEMPORARY PONDS, AND OUTLETS AND OVERFLOWS TO PROTECT THE COMPLETED GRADE <br />AND MINIMIZE SILT IN THE RUNOFF. <br />11.DRAINAGE DITCHES. THE NORMAL WETTED PERIMETER OF ANY TEMPORARY OR PERMANENT DRAINAGE DITCH <br />OR SWALE THAT DRAINS WATER FROM ANY PORTION OF THE CONSTRUCTION SITE, OR DIVERTS WATER AROUND <br />THE SITE, MUST BE STABILIZED WITHIN 200 LINEAL FEET FROM THE PROPERTY EDGE, OR FROM THE POINT OF <br />DISCHARGE INTO ANY SURFACE WATER. STABILIZATION OF THE LAST 200 LINEAL FEET MUST BE COMPLETED <br />WITHIN 24 HOURS AFTER CONNECTING TO A SURFACE WATER. STABILIZATION OF THE REMAINING PORTIONS OF <br />ANY TEMPORARY OR PERMANENT DITCHES OR SWALES MUST BE COMPLETE WITHIN 14 DAYS AFTER <br />CONNECTING TO A SURFACE WATER AND CONSTRUCTION IN THAT PORTION OF THE DITCH HAS TEMPORARILY OR <br />PERMANENTLY CEASED. TEMPORARY OR PERMANENT DITCHES OR SWALES THAT ARE BEING USED AS A <br />SEDIMENT CONTAINMENT SYSTEM (WITH PROPERLY DESIGNED ROCK DITCH CHECKS, BIO ROLLS, SILT DIKES, <br />ETC.) DO NOT NEED TO BE STABILIZED. THESE AREAS MUST BE STABILIZED WITHIN 24 HOURS AFTER NO LONGER <br />BEING USED AS A SEDIMENT CONTAINMENT SYSTEM. <br />1. ALL WATERMAIN AND ACCESSORIES MUST BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF LAKE ELMO <br />STANDARD SPECIFICATIONS AND DETAILS. <br />2.MANIPULATION OF EXISTING VALVES SHALL BE PERFORMED ONLY BY CITY PERSONNEL <br />3.WATERMAIN SHALL BE DUCTILE IRON PIPE, ENCASED IN POLYETHYLENE, CLASS-52. <br />4.ALL FITTINGS SHALL COMPLY WITH CEAM SPEC. 2611.2.A1. ALL FITTINGS SHALL BE DUCTILE IRON PIPE WITH <br />POLYETHYLENE ENCASEMENT. ALL CONNECTIONS SHALL BE INSTALLED UTILIZING COR-BLUE NUTS & BOLTS. <br />5.USE GATE VALCES FOR ALL APPLICATIONS UP THROUGH 12 INCHES. <br />6.GATE VALVES SHALL BE RESISIENT WEDGE AMERICAN FLOW CONTROL SERIES 2500 OR APPROVED EQUAL. GATE <br />VALVES MUST COMPLY WITH CEAM SPEC 2611.2.C.2. <br />7.USE BUTTERFLY VALVES FOR ALL APPLICATIONS GREATER THAN 12 INCHES. <br />8.BUTTERFLY VALVES SHALL BE MUELLER LINESEAL III, OR APPROVED EQUAL. BUTTERFLY VALVES SHALL COMPLY <br />WITH CEAM SPEC. 211.2.C3. <br />9.BOLTS AND NUTS ON ALL VALVES AND HYDRANTS SHALL BE STAINLESS STEEL. <br />10.ALL HYDRANTS SHALL BE INSTALLED 5.0 FEET BACK OF CURB. <br />11.HYDRANTS SHALL BE WATEROUS "PACER," MODEL WB-67 OR APPROVED EQUAL, FITTED WITH FH 800 SERIES FLEX <br />STAKE AND PAINTED RED. <br />12.HYDRANTS SHALL HAVE TWO OUTLET NOZZLES FOR 2-1/2 (I.D.) HOSE CONNECTIONS AND ONE 5" STORZ NOZZLE <br />(MODEL WB-67) AND PENTAGON NUT END CAP. <br />13.THE CURB STOP SERVICE ASSEMBLY SHALL HAVE A MINIMUM 1-FT ADJUSTMENT RANGE AND SHALL EXTEND 6 INCHES <br />ABOVE FINISHED GRADE FULLY EXTENDED. <br />14.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING WATER TO HOMES AND BUSINESSES WHOSE WATER <br />SUPPLY IS DISRUPTED DURING THE COURSE OF THE PROJECT. <br />15.THE CONTRACTOR MUST PROVIDE THE FOLLOWING WATER SYSTEM SUPPLIES TO THE CITY: <br />A.ONE EXTRA NEW SIX-INCH HYDRANT EXTENSION PER PROJECT. <br />B.ONE EXTRA HYDRANT FLEX STAKE MARKER FOR EACH 10 HYDRANTS, MINIMUM ONE PER PROJECT. <br />C.ONE HYDRANT STORZ WRENCH OR REPAIR KIT PER PROJECT. <br />D.ONE 12-FOOT GATE VALVE KEY PER PROJECT. <br />WATERMAIN PLANS - 200A <br />DWN BY: <br />ISSUE DATE: <br />PROJECT NO.: <br />\\ <br />u <br />s <br />0 <br />2 <br />4 <br />2 <br />- <br />p <br />p <br />f <br />s <br />s <br />0 <br />1 <br />\ <br />s <br />h <br />a <br />r <br />e <br />d <br />_ <br />p <br />r <br />o <br />j <br />e <br />c <br />t <br />s <br />\ <br />1 <br />9 <br />0 <br />3 <br />0 <br />0 <br />2 <br />7 <br />9 <br />\ <br />5 <br />_ <br />D <br />E <br />S <br />I <br />G <br />N <br />\ <br />a <br />_ <br />C <br />A <br />D <br />\ <br />4 <br />_ <br />P <br />L <br />A <br />N <br />S <br />H <br />E <br />E <br />T <br />S <br />\ <br />G <br />- <br />0 <br />0 <br />2 <br /> <br />G <br />E <br />N <br />E <br />R <br />A <br />L <br /> <br />N <br />O <br />T <br />E <br />S <br /> <br />0 <br />2 <br />7 <br />9 <br />. <br />d <br />w <br />g <br /> 4/ <br />1 <br />0 <br />/ <br />2 <br />0 <br />2 <br />5 <br /> DA <br />U <br />G <br />H <br />E <br />R <br />T <br />Y <br />, <br /> <br />A <br />D <br />A <br />M <br />DE <br />S <br />C <br />R <br />I <br />P <br />T <br />I <br />O <br />N <br />: <br />DA <br />T <br />E <br />: <br />ISSUE NO.: <br />IS <br />S <br />U <br />E <br /> <br />N <br />O <br />. <br />: <br />SHEET NO.: <br />SHEET TITLE: <br />4/ <br />1 <br />0 <br />/ <br />2 <br />0 <br />2 <br />5 <br /> <br />3 <br />: <br />1 <br />1 <br />: <br />3 <br />3 <br /> <br />P <br />M <br />CLIENT: <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />T <br />I <br />T <br />L <br />E <br />: <br />CHK'D BY:APP'D BY: <br />1 CARLSON PKWY N <br />PLYMOUTH, MN 55447 <br />PHONE: 763-479-4200 <br />WWW.STANTEC.COM <br />PR <br />I <br />M <br />R <br />O <br />S <br />E <br /> <br />S <br />C <br />H <br />O <br />O <br />L <br /> <br />- <br />LA <br />K <br />E <br /> <br />E <br />L <br />M <br />O <br />LA <br />K <br />E <br /> <br />E <br />L <br />M <br />O <br />, <br /> <br />W <br />A <br />S <br />H <br />I <br />N <br />G <br />T <br />O <br />N <br /> <br />C <br />O <br />U <br />N <br />T <br />Y <br />, <br />MI <br />N <br />N <br />E <br />S <br />O <br />T <br />A <br />04/10/2025 <br />190300279 <br />KRM AWD JRA <br />1 <br />SI <br />T <br />E <br /> <br />P <br />E <br />R <br />M <br />I <br />T <br /> <br />P <br />L <br />A <br />N <br />S <br />04 <br />/ <br />1 <br />0 <br />/ <br />2 <br />0 <br />2 <br />5 <br />1