Laserfiche WebLink
G-003 <br />GENERAL NOTES <br />GRADING AND EROSION CONTROL - 600C (CONT.) <br />12.TURF ESTABLISHMENT. ALL EXPOSED SOIL AREAS MUST BE STABILIZED AS SOON AS POSSIBLE TO LIMIT SOIL <br />EROSION BUT IN NO CASE LATER THAN 14 DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE <br />SITE HAS TEMPORARILY OR PERMANENTLY CEASED. <br />13. MAINTENANCE AND INSPECTION. EROSION CONTROL MEASURES SHALL BE MAINTAINED THROUGHOUT THE <br />CONSTRUCTION AND UNTIL SATISFACTORY ESTABLISHMENT OF PERMANENT GROUND COVER IS OBTAINED. ALL <br />EROSION AND SEDIMENTATION CONTROL MEASURES, AND STORMWATER OUTFALLS MUST BE INSPECTED <br />WEEKLY, AND WITHIN 24 HOURS OF THE SITE RECEIVING 0.5 INCHES OF RAIN. REPAIRS MUST BE MADE ON THE <br />SAME DAY OR FOLLOWING DAY OF THE INSPECTION. UNSATISFACTORY CONDITIONS NOT REPAIRED OR <br />CLEANED UP WITHIN 48-HOURS OF NOTIFICATION SHALL RESULT IN A STOP WORK ORDER, AND/OR SAID WORK <br />SHALL BE COMPLETED AT CONTRACTOR'S EXPENSE.. <br />14.REMOVAL. THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL TEMPORARY EROSION CONTROL <br />MEASURES, STRUCTURES AND DEVICES ONLY AFTER RECEIVING ENGINEER APPROVAL. ALL DEBRIS, STAKES, <br />AND SILTS ALONG SILT FENCES SHALL BE REMOVED AND DISPOSED OFF SITE. THE CONTRACTOR SHALL HAND <br />RAKE SILTED AREAS ALONG THE FENCE LOCATIONS TO PROVIDE A SMOOTH FINAL GRADE AND SHALL <br />RESTORE THE GROUND SURFACE WITH SEED OR SOD, AS REQUIRED, TO MATCH THE FINISHED GRADE TO THE <br />ADJACENT AREA. <br />15.FINAL STORM SEWER SYSTEM. AT THE COMPLETION OF THE WORK AND BEFORE THE FINAL WALK THROUGH, <br />THE CONTRACTOR SHALL REMOVE STORM SEWER INLET PROTECTION MEASURES AND THOROUGHLY FLUSH <br />THE STORM SEWER SYSTEM. SEDIMENT AND DEBRIS SHALL BE COMPLETELY REMOVED AND CLEANED AT THE <br />INLETS, OUTLETS, AND DOWNSTREAM OF EACH OUTLET. RIPRAP AND GEOTEXTILE FABRIC MAY REQUIRE <br />REPLACEMENT AS DIRECTED BY THE ENGINEER TO OBTAIN A LIKE NEW INSTALLATION ACCEPTABLE TO THE <br />CITY. <br />16.DITCH CHECK (BIOROLL BLANKET SYSTEM). BIOROLL AND BLANKET SYSTEMS SHALL BE BE INSTALLED AS <br />DITCH CHECKS ONLY IN SPECIFIED LOCATIONS AS APPROVED BY THE CITY ENGINEER. BIOROLLS ARE NOT TO BE <br />UTILIZED IN AREAS WHERE VEHICLE AND CONSTRUCTION TRAFFIC OCCUR. <br />17.FLOTATION SILT CURTAIN. FLOTATION SILT CURTAIN SHALL BE UTILIZED WHEN CONSTRUCTION ACTIVITIES <br />OCCUR DIRECTLY ADJACENT TO LAKES, STREAMS OR WETLANDS IN ORDER TO CONTAIN SEDIMENTS NEAR THE <br />BANKS OF WORKING AREAS. THE INSTALLATION OF FLOTATION SILT CURTAINS WILL BE REQUIRED AS DIRECTED <br />BY THE CITY ENGINEER. <br />18.CONCRETE WASHOUT ONSITE. ALL LIQUID AND SOLID WASTES GENERATED BY CONCRETE WASHOUT <br />OPERATIONS MUST BE CONTAINED IN A LEAK-PROOF CONTAINMENT FACILITY OR IMPERMEABLE LINER. A <br />COMPACTED CLAY LINER THAT DOES NOT ALLOW WASHOUT LIQUIDS TO ENTER GROUND WATER IS <br />CONSIDERED AN IMPERMEABLE LINER. THE LIQUID AND SOLID WASTES MUST NOT CONTACT THE GROUND, AND <br />THERE MUST NOT BE RUNOFF FROM THE CONCRETE WASHOUT OPERATIONS OR AREAS. LIQUID AND SOLID <br />WASTES MUST BE DISPOSED OF PROPERLY AND IN COMPLIANCE WITH MPCA REGULATIONS. A SIGN MUST BE <br />INSTALLED ADJACENT TO EACH WASHOUT FACILITY TO INFORM CONCRETE EQUIPMENT OPERATORS TO UTILIZE <br />THE PROPER FACILITIES. <br />SITE RESTORATION - 600D <br />1. RESTORE ALL DISTURBED AREAS WITH 6 INCHES OF TOPSOIL CONFORMING TO MNDOT 3877. <br />2. PROTECT ALL STORM SEWER INLETS AS SPECIFIED HEREIN AND MAINTAIN UNTIL STREET CONSTRUCTION IS <br />COMPLETED. <br />3.MAINTAIN ALL SILT FENCE AND REPAIR OR REPLACE AS NEEDED OR REQUIRED UNTIL TURF HAS BEEN <br />ESTABLISHED. <br />4.RESTORATION WORK SHALL BEGIN WITHIN 7 DAYS OF FINAL GRADING. <br />5.BOULEVARD AND DITCH RESTORATION INCLUDES FINE GRADING, WHICH INCLUDES THE REMOVAL OF ROCKS, <br />DEBRIS AND SOIL CHUNKS, WHILE MAINTAINING POSITIVE DRAINAGE. <br />UTILITY NOTES <br />1.SEE GENERAL NOTES FOR ADDITIONAL PROJECT AND SITE INFORMATION. <br />2.WATERMAIN WILL BE INSTALLED IN STRICT ACCORDANCE WITH THE MOST CURRENT EDITION OF THE CITY <br />ENGINEERS ASSOCIATION OF MINNESOTA (CEAM) SPECIFICATIONS. <br />3.CONTRACTOR SHALL COMPLY WITH THE SPECIFICATIONS AND REQUIREMENTS OF CITY/UTILITY PROVIDER <br />SPECIFICATIONS, CITY ENGINEERS ASSOCIATION OF MINNESOTA (CEAM) STANDARD SPECIFICATIONS FOR <br />UTILITIES (LATEST EDITION), MPCA/MCES REQUIREMENTS, AND MINNESOTA PLUMBING CODE (MINNESOTA RULES <br />CHAPTER 4714) FOR MATERIALS, INSTALLATION, AND TESTING OF WATER AND SANITARY UTILITIES. <br />4.CONTRACTOR SHALL MAINTAIN A MINIMUM OF 7 FEET 6 INCHES COVER ON ALL WATERLINES, UNLESS OTHERWISE <br />NOTED. PROVIDE HYDRANT EXTENSIONS AND GATE VALVE NUT EXTENSIONS IF WATERLINE IS DEEPER THAN <br />MINIMUM COVER. PROVIDE INSULATION OVER WATERMAIN AND SERVICES WITH PROPOSED ELEVATIONS LESS <br />THAN MINIMUM BURY DEPTH PER PROJECT DETAILS AND UTILITY PROVIDER REQUIREMENTS. <br />5.CONTRACTOR SHALL MAINTAIN A MINIMUM OF 7 FEET 6 INCHES COVER ON ALL SANITARY SEWER AND SERVICES, <br />UNLESS OTHERWISE NOTED. PROVIDE INSULATION OVER SANITARY SEWER AND SERVICES WITH PROPOSED <br />ELEVATIONS LESS THAN MINIMUM BURY DEPTH PER PROJECT DETAILS AND UTILITY PROVIDER REQUIREMENTS. <br />6.CONTRACTOR SHALL PROVIDE 10 FEET MINIMUM HORIZONTAL SEPARATION (OUTSIDE EDGE OF PIPE TO OUTSIDE <br />EDGE OF PIPE/STRUCTURE) BETWEEN WATER LINES AND SANITARY OR STORM LINES AND STRUCTURES <br />7.CONTRACTOR SHALL PROVIDE 18 INCH MINIMUM VERTICAL SEPARATION (OUTSIDE EDGE OF PIPE TO OUTSIDE <br />EDGE OF PIPE) BETWEEN WATER LINES AND OTHER UTILITY LINE CROSSINGS. PROVIDE INSULATION WHERE <br />WATER, SANITARY OR STORM UTILITIES CROSS. OFFSET WATERMAIN AND SERVICES AS NECESSARY. <br />8.PIPE LENGTH INDICATED BETWEEN STRUCTURES IS FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE <br />UNLESS NOTED OTHERWISE. <br />9.PIPE SIZES SHOWN ON THE PLANS ARE INTERNAL PIPE DIAMETER. <br />10.CONTRACTOR SHALL INSTALL TRACER WIRE ON ALL SEWER AND WATER MAINS, LATERALS, SERVICE PIPE AND <br />CONNECTIONS TO RISERS, CURB BOXES, MANHOLES, VALVES, HYDRANTS PER CITY/UTILITY PROVIDER <br />REQUIREMENTS AND PROJECT DETAILS AND SPECIFICATIONS. <br />11.IN THE EVENT OF A VERTICAL CONFLICT BETWEEN WATER LINES, SANITARY LINES, STORM LINES AND GAS LINES <br />(EXISTING AND PROPOSED), THE WATER LINE MUST INCLUDE ONE FULL LENGTH OF PIPE SO BOTH JOINTS ARE AS <br />FAR FROM THE SEWER/UTILITY AS POSSIBLE AND SHALL HAVE MECHANICAL JOINTS WITH APPROPRIATE THRUST <br />BLOCKING AS REQUIRED TO PROVIDE MINIMUM CLEARANCE. <br />12.WATERMAINS AND SERVICES SHALL NOT HAVE ANY INTERMITTENT HIGH POINTS, EXCEPT AT HYDRANTS OR AS <br />NOTED AT SPECIFIC LOCATIONS ON THE PLANS. <br />13.CONTRACTOR SHALL VERIFY PIPE SIZE, MATERIAL, AND ELEVATION FOR ALL CONNECTIONS. PROVIDE <br />APPROPRIATE PIPES AND FITTINGS REQUIRED TO MAKE CONNECTIONS TO EXISTING INFRASTRUCTURE AS <br />VERIFIED IN THE FIELD IN ACCORDANCE WITH CITY/UTILITY PROVIDER REQUIREMENTS. <br />14.WATER AND SANITARY SEWER SERVICES ARE SHOWN TERMINATING AT THE BUILDING FOOTPRINT BUT ARE <br />DESIGNED TO WITHIN 5 FEET OF THE BUILDING FOOTPRINT. VERIFY WITH MEP/PLUMBING PLANS/DESIGNER FOR <br />EXACT LOCATIONS, ELEVATIONS, AND DIMENSIONS OF BACKFLOW DEVICES (DDCV AND PRZ ASSEMBLIES), <br />METERS, AND BUILDING UTILITY ENTRANCE LOCATIONS. SERVICE DESIGNS AND INVERTS WITHIN 5 FEET OF THE <br />BUILDING ARE FOR ILLUSTRATIVE AND REFERENCE PURPOSES ONLY. SEE MEP/PLUMBING PLANS FOR <br />CONTINUATION. VERIFY LOCATIONS AND INVERT ELEVATIONS WITH MEP/PLUMBING PLANS. PROVIDE A RISER PIPE <br />AS NEEDED TO MATCH PLUMBING PIPING. <br />15.WATER AND SANITARY SEWER SERVICE SIZES AND ALIGNMENT ARE PRELIMINARY. CONTRACTOR TO DETERMINE <br />FINAL SIZING AND ALIGNMENT W/ MEP DESIGN. IN THE EVENT THE FINAL SIZE OR ALIGNMENT IS DIFFERENT THAN <br />PRELIMINARY, CONTRACTOR SHALL NOTIFY THE ENGINEER AND OWNER IN WRITING IMMEDIATELY. <br />16.LINES UNDERGROUND SHALL BE INSTALLED, INSPECTED, AND APPROVED PRIOR TO BACKFILLING IN <br />ACCORDANCE WITH CITY OF LAKE ELMO REQUIREMENTS. <br />17.CONTRACTOR SHALL PLACE AND COMPACT SUITABLE FILL MATERIAL BEFORE INSTALLATION OF PROPOSED <br />UTILITIES. <br />UTILITY NOTES (CONT.) <br />18.ANY EXISTING STRUCTURES (I.E. MANHOLES, VALVES, ETC.) WITHIN THE LIMITS OF DISTURBANCE SHALL HAVE <br />RIMS ADJUSTED TO MATCH PROPOSED GRADES, UNLESS NOTED OTHERWISE. ADJUSTMENTS SHALL BE IN <br />ACCORDANCE WITH CITY/AGENCY HAVING JURISDICTION REQUIREMENTS. <br />19. SANITARY SEWER MAIN, SERVICE PIPES, FITTINGS, AND STRUCTURES SHALL MEET THE FOLLOWING <br />REQUIREMENTS: <br />A.SANITARY SERVICE PIPE: PVC SCHEDULE 40 PER ASTM D1785 <br />B.SANITARY PIPE FITTINGS: ASTM D2665 FOR SDR AND SCH 40 PVC PIPE, INJECTION MOLDED (GRAVITY LINES <br />ONLY) <br />C.SANITARY PIPE JOINTS: ASTM F656 AND D2564 FOR SCHEDULE 40 PIPE <br />D.SANITARY SYSTEM TRACER WIRE: CITY REQUIREMENTS <br />20.WATERMAIN, SERVICE PIPES AND FITTINGS TO MEET THE FOLLOWING REQUIREMENTS: <br />A.WATER SERVICE PIPING - 4 INCHES AND LARGER: DUCTILE IRON PIPE CLASS 52 PER AWWA C150, C151 AND <br />C104 <br />B.WATER SERVICE PIPE FITTINGS - 4 INCHES AND LARGER: AWWA C513, 250 PSI WORKING PRESSURE WITH <br />INTERNAL AND EXTERNAL COATING PER AWWA C116 AND CITY REQUIREMENTS. <br />C.WATERMAIN AND SERVICE PIPE JOINTS: AWWA C111 WITH MECHANICAL JOINTS AND THRUST BLOCKING PER <br />PROJECT DETAILS. <br />D.WATERMAIN STUBS: MECHANICALLY RESTRAINED JOINTS WITH THRUST BLOCKING PER PROJECT DETAILS. <br />E.WATER SYSTEM TRACER WIRE: CITY REQUIREMENTS <br />F.ENCASEMENT: POLYETHYLENE ENCASEMENT MATERIAL IN ACCORDANCE WITH AWWA C105 FOR TUBE TYPE <br />INSTALLATION AND 8 MIL NOMINAL FILM THICKNESS. <br />G.JOINT RESTRAINT: PROVIDE AT ALL BENDS, TEES, AND DEAD-ENDS/STUBS IN ACCORDANCE WITH THE <br />REQUIREMENTS OF CEAM AND EBAA IRON RESTRAINT LENGTH CALCULATOR. <br />H.THRUST BLOCKING: PROVIDE BLOCKING IN ACCORDANCE WITH CITY REQUIREMENTS. <br />I.HYDRANTS: PER CITY REQUIREMENTS <br />J.VALVES: PER CITY REQUIREMENTS <br />21.CONTRACTOR SHALL INSTALL AND PROVIDE BEDDING FOR PIPING/ STRUCTURES IN ACCORDANCE WITH CEAM, <br />ASTM D 2321 AND ASTM F 1668 (FOR GRAVITY SEWER), ASTM D 2774 (FOR PRESSURE PIPE), ASTM C 1479 (FOR RC <br />PIPE), AWWA C600 (FOR DIP PIPE), AWWA C605 (FOR PVC), ASTM A 798 (FOR CMP), AND PROJECT/MANUFACTURER <br />DETAILS AND SPECIFICATIONS. <br />22.IF MANUFACTURER DETAILS SPECIFY DESIGN COMPONENTS TO BE DETERMINED BY SITE DESIGN ENGINEER, <br />CONTRACTOR IS RESPONSIBLE FOR CONTACTING SITE DESIGN ENGINEER TO VERIFY SYSTEM REQUIREMENTS <br />PRIOR TO CONSTRUCTION IF NOT NOTED IN THE DRAWINGS. <br />23.CONTRACTOR SHALL COMPACT EMBANKMENT/BEDDING/BACKFILL MATERIAL IN ACCORDANCE WITH UTILITY <br />PROVIDER REQUIREMENTS, THE GEOTECHNICAL REPORT, AND SITE TESTING REQUIREMENTS. <br />24.CONTRACTOR SHALL MEET MOISTURE CONTENT/CONTROL REQUIREMENTS IN ACCORDANCE WITH CITY/UTILITY <br />PROVIDER REQUIREMENTS, THE GEOTECHNICAL REPORT, AND SITE TESTING REQUIREMENTS. <br />25.FIELD QUALITY CONTROL, TESTING, INSPECTIONS, AND CERTIFICATIONS MUST COMPLY WITH THE FOLLOWING: <br />A.ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES, AGENCY HAVING JURISDICTION <br />AND UTILITY PROVIDER COMPANIES. <br />B.SANITARY LINES AND STRUCTURES, INCLUDING BUT NOT LIMITED TO: <br />1)SERVICE PIPE AND STRUCTURES TESTING: MEET MN PLUMBING CODE CHAPTER 7 SECTIONS 712 AND 723 <br />REQUIREMENTS <br />2)LEAKAGE TESTING: CEAM 2621.3.E (AIR TEST METHOD OR HYDROSTATIC TEST METHOD) AND AS REQUIRED <br />BY THE MN PLUMBING CODE AND IN ACCORDANCE WITH THE AUTHORITY HAVING JURISDICTION. <br />3)DEFLECTION TESTING: CEAM 2621.3.F AND AS REQUIRED BY THE MN PLUMBING CODE. 5-PERCENT <br />DEFLECTION ALLOWANCE. <br />4)TELEVISING: TELEVISE IN ACCORDANCE WITH CEAM 2621.3.G AND AUTHORITY HAVING JURISDICTION. <br />5)CONDUCTIVITY/TRACING TESTING: COMPLETE ON THE TRACER WIRE AFTER INSTALLATION OF ALL PROJECT <br />UTILITIES AND PRIOR TO FINAL ACCEPTANCE. TRACER WIRE CONDUCTIVITY SHALL BE CONDUCTED IN THE <br />PRESENCE OF THE ENGINEER AND OWNER. TEST ALL LINES INCLUDING HYDRANT LEADS, WATER SERVICES, <br />SEWER SERVICES AND STUBS. TEST: PHYSICALLY LOCATE ALL PIPES WITH USE OF AN ELECTRONIC UTILITY <br />LOCATING DEVICE SUCH AS A "METROTECH". CONTINUITY TESTING IN LIEU OF ACTUAL LINE TRACING SHALL <br />NOT BE ACCEPTED. <br />C.WATER LINES AND STRUCTURES, INCLUDING BUT NOT LIMITED TO: <br />1)SERVICE PIPE AND STRUCTURES TESTING: MEET MN PLUMBING CODE CHAPTER 6 SECTIONS 603 AND 609 <br />REQUIREMENTS AND CITY REQUIREMENTS <br />2)HYDROSTATIC PRESSURE TESTING: PER AWWA C600/C605 AND CITY REQUIREMENTS <br />3)DISINFECTION TESTING: DISINFECT IN ACCORDANCE WITH AWWA C651, CEAM 2611.3.E, AND MDH <br />BACTERIOLOGIC QUALITY TEST AND CITY REQUIREMENTS. <br />4)CONDUCTIVITY/TRACING TESTING: MEET CITY REQUIREMENTS <br />D.SERVICE TRENCH COMPACTION TESTING: ONE DENSITY AND MOISTURE TEST PER EVERY OTHER SERVICE <br />TRENCH UP TO 100 LINEAL FEET. ONE ADDITIONAL TEST FOR EACH 100 LINEAL FEET OR FRACTION THEREOF. <br />RANDOM SAMPLING AT VARYING DEPTHS AND LOCATIONS ACROSS ALL TRENCHES (NOT ALL TESTS TO BE <br />DONE AFTER THE 1ST OR 2ND LIFT IS PLACED). <br />E.SANITARY STRUCTURE COMPACTION TESTING: ONE DENSITY AND ONE MOISTURE TEST PER STRUCTURE. ONE <br />ADDITIONAL TEST FOR EACH 10 FEET OF DEPTH OR FRACTION THEREOF. RANDOM SAMPLING AT VARYING <br />DEPTHS AND LOCATION ACROSS ALL STRUCTURES. <br />F.WATERMAIN TRENCH COMPACTION TESTING: ONE DENSITY AND MOISTURE TEST PER 250 LINEAL FEET OF <br />PIPE PER FOOT OF DEPTH. RANDOM SAMPLING AT VARYING DEPTHS AND LOCATIONS ACROSS ALL <br />WATERMAIN PIPES. <br />G.WATER STRUCTURE/VALVE COMPACTION TESTING: ONE DENSITY AND ONE MOISTURE TEST PER STRUCTURE. <br />ONE ADDITIONAL TEST FOR EACH 10 FEET OF DEPTH OR FRACTION THEREOF. RANDOM SAMPLING AT <br />VARYING DEPTHS AND LOCATION ACROSS ALL STRUCTURES. <br />26.TOLERANCES: <br />A.SANITARY PIPE HORIZONTAL: WITHIN 0.50 FEET OF ALIGNMENT <br />B.SANITARY PIPE VERTICAL: ZERO PLUS AND 0.08 FEET MINUS ELEVATION SHOWN WITH NO INTERMEDIATE HIGH <br />POINTS, LEVEL SECTION, OR REVERSE INVERT SLOPE. <br />C.SANITARY PIPE JOINT DEFLECTION: NO MORE THAN 75% OF MAXIMUM ALLOWABLE, AS RECOMMENDED BY <br />MANUFACTURERS OF PIPE AND JOINT MATERIAL <br />D.SANITARY STRUCTURE RIM ELEVATIONS: ZERO PLUS AND 0.08 FEET MINUS ELEVATION SHOWN <br />E.WATER PIPE HORIZONTAL: WITHIN 0.50 FEET OF ALIGNMENT <br />F.WATER PIPE VERTICAL: 0 FEET PLUS AND 1 FEET MINUS ELEVATION SHOWN, WHILE MEETING THE MINIMUM <br />SEPARATION REQUIREMENTS AT CROSSINGS. <br />G.WATER PIPE JOINT DEFLECTION: NO MORE THAN 75% OF MAXIMUM ALLOWABLE, AS RECOMMENDED BY <br />MANUFACTURERS OF PIPE AND JOINT MATERIAL <br />H.HYDRANT/VALVE/CASTING ELEVATION: WITHIN 0.05 FEET OF FINAL ELEVATION. VALVE/TRACER WIRE BOXES, <br />CURB STOPS, AND CASTINGS SHALL NOT EXTEND ABOVE FINAL PAVED SURFACE ELEVATION <br />I. <br />STORM SEWER NOTES <br />1.SEE GENERAL NOTES FOR ADDITIONAL PROJECT AND SITE INFORMATION. <br />2.CONTRACTOR SHALL COMPLY WITH THE SPECIFICATIONS OF THE CITY/UTILITY PROVIDER, CEAM, AND MINNESOTA <br />PLUMBING CODE (MINNESOTA RULES CHAPTER 4714) FOR MATERIALS, INSTALLATION, AND TESTING OF STORM <br />UTILITIES. <br />3.CONTRACTOR SHALL PROVIDE 10 FEET SEPARATION (OUTSIDE EDGE OF PIPE TO OUTSIDE EDGE OF <br />PIPE/STRUCTURE) BETWEEN WATER LINES AND SANITARY OR STORM LINES AND STRUCTURE. <br />STORM SEWER NOTES (CONT.) <br />4.CONTRACTOR SHALL PROVIDE 18 INCH MINIMUM VERTICAL SEPARATION (OUTSIDE EDGE OF PIPE TO OUTSIDE <br />EDGE OF PIPE/STRUCTURE) BETWEEN WATER LINES AND OTHER UTILITY LINES. PROVIDE INSULATION WHERE <br />WATER, SANITARY, OR STORM UTILITIES CROSS. OFFSET WATERMAIN AND SERVICES AS NECESSARY. <br />5.CONTRACTOR SHALL VERIFY PIPE SIZE, MATERIAL, AND ELEVATION FOR CONNECTIONS. PROVIDE APPROPRIATE <br />PIPES AND FITTINGS REQUIRED TO MAKE CONNECTIONS TO EXISTING INFRASTRUCTURE AS VERIFIED IN THE <br />FIELD. <br />6.CONTRACTOR SHALL PLACE AND COMPACT SUITABLE FILL MATERIAL BEFORE INSTALLATION OF PROPOSED <br />UTILITIES. <br />7.CONTRACTOR IS RESPONSIBLE FOR PROPERLY LOCATING AND INSTALLING CATCH BASINS SO THAT THE INLET <br />FRAME AND GRATE PROPERLY ALIGN WITH CURB AND GUTTER. <br />8.DRAINTILE/SUBSOIL DRAIN AROUND BUILDING PERIMETER NOT SHOWN ON CIVIL DRAWINGS. CONTRACTOR SHALL <br />VERIFY IF DRAINTILE REQUIRED WITH ARCHITECT/STRUCTURAL/MEP AND COORDINATE CONNECTION TO STORM <br />SYSTEM WITH ENGINEER. <br />9.LINES UNDERGROUND SHALL BE INSTALLED, INSPECTED, AND APPROVED PRIOR TO BACKFILLING IN <br />ACCORDANCE WITH AGENCY HAVING JURISDICTION REQUIREMENTS. <br />10.PIPE LENGTH INDICATED BETWEEN STRUCTURES IS FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE <br />UNLESS NOTED OTHERWISE. PIPE LENGTH INDICATED BETWEEN STRUCTURE AND FLARED END SECTION IS FROM <br />CENTER OF STRUCTURE TO END OF FLARED END SECTION. <br />11.PIPE SIZES SHOWN ON THE PLANS ARE INTERNAL PIPE DIAMETER. <br />12.IF MANUFACTURER DETAILS SPECIFY DESIGN COMPONENTS TO BE DETERMINED BY SITE DESIGN ENGINEER, <br />CONTRACTOR IS RESPONSIBLE FOR CONTACTING SITE DESIGN ENGINEER TO VERIFY SYSTEM REQUIREMENTS <br />PRIOR TO CONSTRUCTION IF NOT NOTED IN THE DRAWINGS. <br />13.STORM SEWER MAINS, SERVICE PIPES, FITTINGS, AND STRUCTURES TO MEET THE FOLLOWING REQUIREMENTS: <br />A.HDPE/PP PIPE: CORRUGATED DUAL WALL HDPE WATER TIGHT PIPE PER AASHTO M 294 ASTM F2306, ASTM <br />D3212, AND ASTM F477 <br />B.PVC PIPE: PVC SCH 40 PER ASTM D1785 AND ASTM D2665. INJECTION MOLDED FITTINGS. <br />C.ROOF DRAIN PIPE AND FITTINGS: PVC SCH 40 PER ASTM D 1785 AND ASTM D 2665. INJECTION MOLDED <br />FITTINGS. <br />D.PIPE JOINTS: JOINTS MUST BE CERTIFIED BY THE MANUFACTURER TO BE ABLE TO PASS THE AIR TEST OR <br />INTERNAL HYDROSTATIC PRESSURE REQUIRED BY THE AGENCY HAVING JURISDICTION. <br />E.PIPE CONNECTION TO EXISTING PIPE: FOR DISSIMILAR PIPE CONNECTIONS USE MARMAC DISSIMILAR PIPE <br />COUPLERS OR APPROVED EQUAL. <br />F.PIPE CONNECTION TO EXISTING STORM STRUCTURE: CONTRACTOR SHALL PROVIDE AND INSTALL A FLEXIBLE <br />COMPRESSION JOINT TO MAKE WATERTIGHT CONNECTIONS TO MANHOLES IN ACCORDANCE WITH MINNESOTA <br />PLUMBING CODE, SECTION 719.6. RESILIENT RUBBER JOINTS MEETING ASTM C923 MAY BE USED IF APPROVED <br />BY AGENCY HAVING JURISDICTION, SEE PROJECT DETAILS. <br />G.STORM PRECAST STRUCTURES GENERAL: ASTM C478 AND DRAWING DETAILS. <br />H.STORM PRECAST STRUCTURE JOINTS: RUBBER O-RING GASKET MEETING ASTM C443 <br />I.STORM PRECAST STRUCTURE STEPS: PER DETAILS <br />J.STORM PRECAST STRUCTURE DESIGN: DETAILED AND PREPARED BY A PROFESSIONAL ENGINEER <br />EXPERIENCED IN PRECAST CONCRETE STRUCTURE DESIGN WHO IS LICENSED IN THE STATE OF MINNESOTA. <br />DESIGN SHALL CONFORM TO A MINIMUM SAFETY FACTOR OF 1.3 FOR BUOYANCY AND FLOTATION WITH THE <br />HYDROSTATIC LOADING (WATER TABLE ELEVATIONS) ASSUMED FROM THE TOP OF THE STRUCTURE. THE <br />DESIGN OF THE BASE SLAB, WALLS, AND TOP SLAB SHALL BE DESIGNED FOR SHEAR STRENGTH, FLEXURAL <br />STRENGTH, AND OTHER APPLICABLE STRENGTHS DUE TO HYDROSTATIC LOADING. THE DESIGN SHALL BE IN <br />ACCORDANCE WITH THE MOST CURRENT ACI 318, AASHTO, AND MN/DOT STANDARD SPECIFICATIONS FOR <br />CONSTRUCTION, EXCEPT AS NOTED. <br />K.STORM PRECAST STRUCTURE MORTAR MATERIALS: ASTM C270 AND ASTM C387 WITH AIR CONTENT OF AT <br />LEAST 8 PERCENT. <br />L.STORM PRECAST STRUCTURE ADJUSTMENT RINGS: SIZE TO MATCH CONE OR OPENING IN TOP SLAB. <br />CONCRETE WITH MINIMUM 3,000 PSI COMPRESSIVE STRENGTH, SINGLE HOOP 8-GAUGE STEEL WIRE <br />REINFORCEMENT, AND 2 INCH THICKNESS EACH RING. <br />M.STORM PRECAST STRUCTURE ADHESION MATERIAL: BETWEEN TOP SLAB AND BARREL SECTION - RAM-NEK OR <br />APPROVED EQUAL. FOR CONCRETE RINGS, USE MORTAR MATERIALS. <br />N.STORM PRECAST STRUCTURE INTERNAL/EXTERNAL SEAL: IN ACCORDANCE WITH CITY REQUIREMENTS <br />14.STORM PIPE BEDDING: CONTRACTOR SHALL INSTALL AND PROVIDE BEDDING FOR PIPING/STORMWATER <br />SYSTEMS/VAULTS/CHAMBERS/ STRUCTURES IN ACCORDANCE WITH CEAM, ASTM D 2321 AND ASTM F 1668 (FOR <br />GRAVITY SEWER), ASTM D 2774 (FOR PRESSURE PIPE), ASTM C 1479 (FOR RC PIPE), AWWA C600 (FOR DIP PIPE), <br />AWWA C605 (FOR PVC), ASTM A 798 (FOR CMP), AND PROJECT/MANUFACTURER DETAILS AND SPECIFICATIONS. <br />15.STORM SYSTEM TRACER WIRE: CEAM 2611 AND CITY AND WATERSHED REQUIREMENTS <br />16.CONTRACTOR SHALL COMPACT EMBANKMENT/BEDDING/BACKFILL MATERIAL IN ACCORDANCE WITH CITY <br />REQUIREMENTS, IN ACCORDANCE WITH THE GEOTECHNICAL REPORT, AND SITE TESTING REQUIREMENTS. <br />17.CONTRACTOR SHALL MEET MOISTURE CONTENT/CONTROL REQUIREMENTS IN ACCORDANCE WITH CITY <br />REQUIREMENTS, THE GEOTECHNICAL REPORT, AND SITE TESTING REQUIREMENTS. <br />18.FIELD QUALITY CONTROL, TESTING, INSPECTIONS, AND CERTIFICATIONS MUST COMPLY WITH THE FOLLOWING: <br />A.ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES, AGENCY HAVING JURISDICTION <br />AND UTILITY SERVICE COMPANIES. <br />B.STORM LINES AND STRUCTURES, INCLUDING BUT NOT LIMITED TO: <br />1)SERVICE PIPE AND ROOF DRAIN LEADERS TESTING TO COMPLY WITH MN PLUMBING CODE CHAPTER 7 <br />SECTION 712 AND CHAPTER 11 SECTION 1107 <br />2)ALL PORTIONS OF SYSTEM (PIPE AND STRUCTURES) THAT PASS WITHIN 10 FEET OF A WATER LINE, WITHIN <br />10 FEET OF A BUILDING, WITHIN 50 FEET OF WATER WELLS, OR THAT PASS THROUGH SOIL OR WATER <br />IDENTIFIED AS BEING CONTAMINATED MUST BE TESTED IN ACCORDANCE WITH MN PLUMBING CODE <br />CHAPTER 11 SECTION 1107. <br />3)STORM PIPE DEFLECTION TESTING: CEAM 2621.3.F AND AS REQUIRED BY THE MN PLUMBING CODE AND CITY <br />AND WATERSHED REQUIREMENTS. 5-PERCENT DEFLECTION ALLOWANCE OF PIPE'S INTERNAL DIAMETER. <br />4)STORM PIPE LEAKAGE TESTING: CEAM 2621.3.E AND AS REQUIRED BY THE MN PLUMBING CODE AND CITY <br />AND WATERSHED REQUIREMENTS. <br />5)STORM PIPE LAMPING: VERIFY INSTALLATION IS TRUE TO LINE AND GRADE. VERIFY INSTALLED PIPE IS <br />STRUCTURALLY SOUND. VERIFY THERE ARE NO BROKEN OR DEFLECTIVE PIPES. VERIFY THAT JOINTS ARE <br />ALL PUSHED HOME. VERIFY STRUCTURES CONFORM TO SPECIFIED REQUIREMENTS. PROVIDE <br />VERIFICATION OF THE ABOVE IN WRITING TO THE OWNER AND ENGINEER. <br />6)STORM PIPE INFILTRATION TESTING: INFILTRATION: 1) TO DETERMINE THE AMOUNT OF GROUNDWATER <br />INFILTRATION INTO THE SEWERS. 2) TEST WAIVED IF NO VISIBLE INFILTRATION IS OBSERVED DURING THE <br />LAMPING INSPECTIONS. 3) MEASUREMENT MADE BY MEANS OF 90 DEGREE V-NOTCH WEIRS PLACED IN THE <br />LINES AS DIRECTED BY THE ENGINEER. 4)MEASUREMENTS TAKEN AT THE POINTS WHERE IN THE <br />ENGINEERS OPINION THE FLOW OF WATER IN THE SEWER IS GREATER THAN THE MAXIMUM ALLOWABLE <br />LEAKAGE. 5) MAXIMUM ALLOWABLE RATE OF LEAKAGE: NOT MORE THAN 100 GALLONS PER MILE PER INCH <br />DIAMETER PER DAY. 6)TESTS MAY BE TAKEN BETWEEN INDIVIDUAL MANHOLES AND THE INFILTRATION IN <br />ANY GIVEN LINE MUST NOT EXCEED THE SPECIFIED MAXIMUM ALLOWABLE RATE. 7)METHOD OF <br />MEASUREMENT: MEASUREMENT OF TIME FOR A PREDETERMINED VOLUME OF FLOW TO OCCUR. <br />7)STORM PIPE CONTINUITY TESTING: IN ACCORDANCE WITH CEAM 2611.3.F AND THE AUTHORITY HAVING <br />JURISDICTION. <br />8)TELEVISING: CEAM 2621.3.G AND CITY AND WATERSHED REQUIREMENTS <br />9)STORM PIPE TRENCH COMPACTION TESTING: ONE DENSITY AND MOISTURE TEST PER 100 LINEAL FEET OF <br />PIPE PER FOOT OF DEPTH. RANDOM SAMPLING AT VARYING DEPTHS AND LOCATIONS ACROSS ALL STORM <br />PIPES. <br />STORM SEWER NOTES (CONT.) <br />10)STORM STRUCTURE COMPACTION TESTING: ONE DENSITY AND ONE MOISTURE TEST PER STRUCTURE. ONE <br />ADDITIONAL TEST FOR EACH 10 FEET OF DEPTH OR FRACTION THEREOF. RANDOM SAMPLING AT VARYING <br />DEPTHS AND LOCATION ACROSS ALL STRUCTURES. <br />C.A COPY OF THE TEST RESULTS MUST BE PROVIDED TO THE OWNER, ENGINEER, UTILITY PROVIDER, AND <br />AGENCY HAVING JURISDICTION. <br />19. CONTRACTOR SHALL CLEAN STRUCTURES AND PIPING OF DEBRIS AND SEDIMENT DURING AND AT THE END OF <br />CONSTRUCTION UNTIL ACCEPTED BY THE OWNER AND ENGINEER. <br />20.REFER TO THE MEP PLANS FOR EXACT LOCATIONS, ELEVATIONS, AND DIMENSIONS OF BUILDING STORM UTILITY <br />ENTRANCE LOCATIONS. <br />21.TOLERANCES: <br />A.STORM PIPE HORIZONTAL TOLERANCE: WITHIN 0.50 FEET OF ALIGNMENT <br />B.STORM PIPE VERTICAL TOLERANCE: ZERO PLUS AND 0.08 FEET MINUS ELEVATION SHOWN WITH NO <br />INTERMEDIATE HIGH POINTS, LEVEL SECTION, OR REVERSE INVERT SLOPE. <br />C.STORM PIPE JOINT DEFLECTION TOLERANCE: NO MORE THAN 75% OF MAXIMUM ALLOWABLE, AS <br />RECOMMENDED BY MANUFACTURERS OF PIPE AND JOINT MATERIAL <br />D.STORM STRUCTURE RIM ELEVATION TOLERANCE: ZERO PLUS AND 0.08 FEET MINUS ELEVATION SHOWN <br />HORIZONTAL AND VERTICAL CONTROL NOTES <br />1.SEE GENERAL NOTES FOR ADDITIONAL PROJECT AND SITE INFORMATION. <br />2.THE HORIZONTAL CONTROL FOR THIS PLAN IS NAD 83 WASHINGTON COUNTY COORDINATES SYSTEM, US SURVEY <br />FOOT <br />3.THE VERTICAL CONTROL FOR THE PLAN IS NAVD88 <br />TYPICAL PROJECT OBSERVATIONS <br />1.SEE GENERAL NOTES FOR ADDITIONAL PROJECT AND SITE INFORMATION. <br />2.CONTRACTOR MUST NOTIFY OWNER, ENGINEER, AND CITY IN WRITING A MINIMUM OF 2 BUSINESS DAYS IN <br />ADVANCE OF THE FOLLOWING ACTIVITIES FOR ATTENDENCE AND OBSERVATION: PRE-CONSTRUCTION MEETING, <br />UNDERGROUND PIPING AND UTILITIES INSTALLATION, UTILITY TESTING, STRUCTURES AND APPURTENANCES <br />INSTALLATION, SUBGRADE PREPARATION, BASE INSTALLATION, CURB INSTALLATION, AND PAVEMENT <br />INSTALLATION. <br />TEST REPORTS REQUIRED <br />1.SEE GENERAL NOTES FOR ADDITIONAL PROJECT AND SITE INFORMATION. <br />2.COPIES OF COMPACTION/MOISTURE, CONCRETE, AND OTHER TEST RESULTS ARE TO BE SENT TO THE OWNER <br />DIRECTLY FROM THE INDEPENDENT TESTING LABORATORY. <br />3.ONSITE/INPLACE GEOTECHNICAL/CONCRETE TESTING MUST BE COMPLETED BY THE CONTRACTOR'S <br />INDEPENDENT TESTING LABORATORY. CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL REQUIRED <br />IN-PLACE TESTS AND INSPECTIONS WITH THE ENGINEER/INDEPENDENT TESTING LABORATORY. <br />4.TEST REPORTS REQUIRED MAY INCLUDE, BUT ARE NOT NECESSARILY LIMITED TO: DENSITY TESTS OF SOIL AND <br />PAVEMENT COMPACTION, CONCRETE COMPRESSION, AIR, AND SLUMP TESTS, BACTERIOLOGICAL TESTS OF <br />WATER SYSTEM, MANDREL TESTS OF SANITARY AND STORM SYSTEM, PRESSURE/LEAK TESTS OF <br />WATER/SANITARY/STORM SYSTEM, AND OTHER TESTING REQUIRED BY AGENCY/MUNICIPALITY HAVING <br />JURISDICTION. <br />5.RE-WORK/RE-TESTING DUE TO FIELD TEST FAILURE ARE AT NO ADDITIONAL COST TO THE OWNER. <br />DWN BY: <br />ISSUE DATE: <br />PROJECT NO.: <br />\\ <br />u <br />s <br />0 <br />2 <br />4 <br />2 <br />- <br />p <br />p <br />f <br />s <br />s <br />0 <br />1 <br />\ <br />s <br />h <br />a <br />r <br />e <br />d <br />_ <br />p <br />r <br />o <br />j <br />e <br />c <br />t <br />s <br />\ <br />1 <br />9 <br />0 <br />3 <br />0 <br />0 <br />2 <br />7 <br />9 <br />\ <br />5 <br />_ <br />D <br />E <br />S <br />I <br />G <br />N <br />\ <br />a <br />_ <br />C <br />A <br />D <br />\ <br />4 <br />_ <br />P <br />L <br />A <br />N <br />S <br />H <br />E <br />E <br />T <br />S <br />\ <br />G <br />- <br />0 <br />0 <br />2 <br /> <br />G <br />E <br />N <br />E <br />R <br />A <br />L <br /> <br />N <br />O <br />T <br />E <br />S <br /> <br />0 <br />2 <br />7 <br />9 <br />. <br />d <br />w <br />g <br /> 4/ <br />1 <br />0 <br />/ <br />2 <br />0 <br />2 <br />5 <br /> DA <br />U <br />G <br />H <br />E <br />R <br />T <br />Y <br />, <br /> <br />A <br />D <br />A <br />M <br />DE <br />S <br />C <br />R <br />I <br />P <br />T <br />I <br />O <br />N <br />: <br />DA <br />T <br />E <br />: <br />ISSUE NO.: <br />IS <br />S <br />U <br />E <br /> <br />N <br />O <br />. <br />: <br />SHEET NO.: <br />SHEET TITLE: <br />4/ <br />1 <br />0 <br />/ <br />2 <br />0 <br />2 <br />5 <br /> <br />3 <br />: <br />1 <br />1 <br />: <br />3 <br />7 <br /> <br />P <br />M <br />CLIENT: <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />T <br />I <br />T <br />L <br />E <br />: <br />CHK'D BY:APP'D BY: <br />1 CARLSON PKWY N <br />PLYMOUTH, MN 55447 <br />PHONE: 763-479-4200 <br />WWW.STANTEC.COM <br />PR <br />I <br />M <br />R <br />O <br />S <br />E <br /> <br />S <br />C <br />H <br />O <br />O <br />L <br /> <br />- <br />LA <br />K <br />E <br /> <br />E <br />L <br />M <br />O <br />LA <br />K <br />E <br /> <br />E <br />L <br />M <br />O <br />, <br /> <br />W <br />A <br />S <br />H <br />I <br />N <br />G <br />T <br />O <br />N <br /> <br />C <br />O <br />U <br />N <br />T <br />Y <br />, <br />MI <br />N <br />N <br />E <br />S <br />O <br />T <br />A <br />04/10/2025 <br />190300279 <br />KRM AWD JRA <br />1 <br />SI <br />T <br />E <br /> <br />P <br />E <br />R <br />M <br />I <br />T <br /> <br />P <br />L <br />A <br />N <br />S <br />04 <br />/ <br />1 <br />0 <br />/ <br />2 <br />0 <br />2 <br />5 <br />1