My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Presentation - 2026 Street&Utility Order Feasibility
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
06-03-25
>
Presentation - 2026 Street&Utility Order Feasibility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 10:10:32 AM
Creation date
8/15/2025 10:10:21 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Improvements <br />Street and drainage improvements for those identified in the 2026 CIP, the <br />type and extent of improvements based on geotechnical investigation. <br />01 <br />Existing bituminous curb will be replaced with new concrete curb and gutter.02 <br />03 <br />Exis ting public wate rmain s e rve s all prope rtie s within the proje c t are a. A <br />review of the system will be completed and repairs will be <br />recommended if necessary. <br />04 Exis ting s torm s e we r ins pe c tions will be c onduc te d to ide ntify any re pairs <br />or corrections deemed necessary to restore or improve the drainage <br />systems. <br />Street geometrics and widths together with on-s tre e t parking re s tric tions will <br />be reviewed to determine if any improvements or changes are recommended. <br />All streets in the project area are outside of the MUSA boundaries and are <br />served by private wastewater treatment systems, no sanitary sewer <br />extensions are proposed as part of the project. <br />05 <br />06
The URL can be used to link to this page
Your browser does not support the video tag.