My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#15 - Inwood 8th Add Prelim Plat, PUD & Comp Plan Amend
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
06-17-25
>
#15 - Inwood 8th Add Prelim Plat, PUD & Comp Plan Amend
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 10:17:20 AM
Creation date
8/15/2025 10:14:13 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Inwood Townhomes <br />Page 1 <br />INTRODUCTION <br /> <br />M/I Homes of Minneapolis/St. Paul, LLC (M/I Homes) is submitting application for a Comprehensive Plan <br />Amendment, Preliminary Plat, Development Stage Planned Unit Development (PUD) Plan for a development <br />containing 148 townhomes and a 123-unit apartment building. M/I Homes will be constructing the townhomes <br />and partnering with Rachel Development, Inc. for the apartment building. Townhomes and an apartment <br />building were shown on the approved Inwood preliminary planned unit development plans, and the Inwood <br />Preliminary Plat and Planned Unit Development (PUD) Resolution 2014-94 approved the PUD which includes <br />275 single family homes and 264 multifamily units. An Environmental Assessment Worksheet (EAW) and <br />Traffic Study were completed and approved with the approval of this preliminary plat. M/I Homes (dba <br />Hans Hagen Homes) developed Inwood, including the extension of sewer and water to the multi-family <br />property, as well as the construction of 5th Street and Island Trail. M/I Homes also constructed ponding and <br />an infiltration basin to serve the subject property. <br /> <br />We brought forth the application to the April 14, 2025, Planning Commission, and it was communicated that <br />some changes would need to be made to the plan in order for the Planning Commission to recommend <br />approval. Since then, we’ve made several changes to the site plan, which are outlined below. <br /> <br />S I T E P L A N <br /> <br />We are proposing private streets throughout the community with one street connection to 5th Street North and <br />one connection to Island Trail. All townhomes will be our City Collection Townhomes, which are our new rear- <br />loaded three-story townhomes. The proposed apartment is located on the northwest corner of the site, <br />separated from all but one townhome building by Island Trail. M/I Homes and Rachel Development have <br />experience working together on multi-family projects similar to this one. One such project is Marsh View which <br />is located at 137th Avenue North in Rogers, Minnesota. An aerial photo of this development is included in this <br />narrative. <br /> <br />Changes since Sketch Plan. M/I Homes previously submitted a sketch plan review application to City staff <br />and have subsequently made amendments to the proposed plan. We have revised the street layout to <br />eliminate dead-end road and have provided an additional access to the apartment building. We also <br />increased the front yard setbacks from the private street from 25 feet to 30 feet. Additionally, we have <br />combined two access points off Island Trail to one and have rotated the townhome buildings to the west of <br />Island Trail to face the public street and have combined those buildings, creating parking in the rear. <br /> <br />Changes since Planning Commission. As previously mentioned, the Preliminary Plat, PUD and <br />Comprehensive Plan applications were considered at the April 14, 2025 Planning Commission. Since this <br />meeting, the following changes have been made: <br />• We aligned the access points from the east and west of Island Trail. <br />• We created a 28-foot-wide street through the center of the development. This will create an <br />aesthetically pleasing streetscape with front entrances of the townhomes facing the entrance street. <br />Alleys will circulate the development to accommodate the rear-loaded garages. <br />• Stub streets were removed on the east side of the plan. <br />• Entrance landscaping was added as well as a landscaping feature in the middle of the site and <br />landscape buffering from the bank’s parking lot to the south. <br />• Increased open space from 8.63 acres to 9.21 acres. <br /> <br />Staff Report/Planning Commission Feedback Responses. The following provides response to comments <br />received from both the Staff Report included in the April 14, 2025 Planning Commission meeting packet as <br />well as feedback received from said meeting:
The URL can be used to link to this page
Your browser does not support the video tag.