My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#15 - Inwood 8th Add Prelim Plat, PUD & Comp Plan Amend
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
06-17-25
>
#15 - Inwood 8th Add Prelim Plat, PUD & Comp Plan Amend
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 10:17:20 AM
Creation date
8/15/2025 10:14:13 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Inwood Townhomes <br />Page 7 <br />• Parking is screened from public streets. <br />• Townhomes that front a public street are rear loaded. <br />• Buildings provide multiple roof lines and visual interest. <br /> <br />P H A S I N G <br /> <br />We are proposing to begin construction on the first phase in spring of 2025, the second phase in the spring of <br />2026, and the third phase in spring of 2027. <br /> <br />L A N D S CA P I N G / TR E E P R ES E RVAT IO N <br /> <br />The landscaping plan is included with the submittal. M/I Homes has also previously completed all of the <br />landscaping and berming along 5th Street as part of the Inwood PUD. This landscaping includes the <br />boulevards adjacent to the subject property. There are only six boulevard trees proposed to be removed <br />along 5th Street North to facilitate construction, which will be replaced in similar locations. We have provided <br />sufficient boulevard trees, meeting the 50-foot spacing requirement for both the townhome and apartment <br />site and have provided the sufficient number of trees required per area of disturbance (this includes the trees <br />that will remain on site). Parking lot landscaping meets landscaping area and shade tree requirements. <br /> <br />TOW N H O ME IN FO R M AT I O N <br /> <br />The townhomes in the proposed development will consist of M/I’s Carriage and City Collection townhomes. <br />The different townhome designs provide for added character and visual interest within the neighborhood as <br />well as varying prices. The two-story Carriage Collection is planned to be positioned to the south and east of <br />the site, adjacent to the existing single-family homes, with the three-story City Collection along public street <br />frontages. A variety of exterior colors will be used throughout the neighborhood to provide additional visual <br />interest while avoiding a monotony of colors. <br /> <br />The Carriage Collection offers a range of design features and options and ranges in size from 1,667 square <br />feet to 1,772 square feet with 3 bedrooms and 2.5 bathrooms. The City Collection plans will provide up to 4 <br />bedrooms and 3.5 bathrooms ranging from 1,898 square feet to 2,080 square feet. <br /> <br />R E S T R I C T IV E C OV E N A N TS <br /> <br />Inwood Townhomes will have a Homeowners Association (HOA) that will provide for the maintenance of the <br />overall common elements in the community, including landscaping and irrigation of the common areas, snow <br />removal from sidewalks and private streets, and exterior maintenance. In the unlikely event that the site runs <br />out of snow storage, the HOA service will haul out snow from the site. The HOA will also provide for <br />restrictions on outdoor storage, parking (no boats, campers, or trailers) in order to keep the community looking <br />orderly and well maintained. <br /> <br />FEES <br /> <br />With the single-family portion of the development, the Developers Agreements for each addition detailed the <br />following: <br />• Parkland. The Development Contract for Inwood dated June 9, 2015 detailed that park dedication <br />fees were satisfied for the single-family portion of the Inwood Development with the dedication of <br />Outlot L (net 10.73 acres) and that the 1.16 acres of excess park dedication credit was to be applied <br />for the future multi-family residential area as conceptually shown on the Inwood PUD concept plan. <br />• Sewer and Water Availability Charges. M/I Homes was responsible for paying $3,000 for both <br />Sewer Availability Charge (SAC) and Water Availability Charge (WAC) per residential equivalency
The URL can be used to link to this page
Your browser does not support the video tag.