Laserfiche WebLink
Page: 2 <br /> <br /> <br /> <br />SITE PLANS, TRAFFIC AND ACCESS MANAGEMENT <br />1. Access Management for East Parcel. The east parcel is allowed a single access location to 5th Street <br />as shown at the Inwood Circle intersection and is required to have a secondary access location <br />along Island Trail as shown. <br />2. Access Management for West Parcel. The west parcel may have a single new access location along <br />Island Trail, aligned with the Island Trail access location for the east parcel. <br />3. Secondary access for the proposed 123-unit apartment building is required per Fire Code. The <br />secondary access must connect to the shared driveway for Outlot A of the Inwood 6th Addition as <br />shown. A shared driveway easement has been created for this connection as part of the Inwood <br />6th Addition. The access design should be improved to encourage equal distribution of traffic to <br />the 5th Street and Island Trail access locations. <br />4. Turn lanes must be added along Island Trail for both the east and west access locations, each having <br />more than 35 new units. The west parcel has 131 units, or 3.7 times the City standard practice and <br />the east parcel has 140 units, or 4.0 times the City standard practice. Turn lanes were not installed <br />as part of the original Island Trail construction since the two parcels, that are now proposed for <br />subdivision, were proposed as Outlots as part of the Inwood Preliminary Plat approval. Therefore, <br />the approved Inwood Preliminary Plat/Plans did not include the preliminary plan submittal <br />information needed for City review, and no defined access location was proposed. <br />5. Right-of-way dedication. No additional right-of-way dedication is required along 5th Street. <br />Additional right-of-way dedication is required along Island Trail to accommodate the required turn <br />lanes at the new proposed site accesses. The Site Plans adjacent to the right-of-way will need to <br />be revised accordingly to adjust setbacks. <br />6. The layout proposes a pedestrian crossing at the new street access location and Island Trail. The <br />City recognizes the benefit for pedestrian connectivity for the high-density subdivision, however <br />the crossing may act as a mid-block crossing along a City collector roadway and may create a <br />potentially unsafe crosswalk. Any crosswalk at this location must be subject to the design and <br />approval of the City’s transportation engineer. The Preliminary Plans must be revised accordingly <br />once the design is completed by the City. <br /> It is recommended that a sidewalk connection be added to the apartment building to help <br />justify the crosswalk. <br />7. A phasing plan must be added to the plan set to demonstrate phasing for subdivision access, street <br />construction, water and sewer utilities, and stormwater management. The phasing plan must <br />provide secondary access for both the east and west parcels at 30 or greater units (per Fire Code <br />adopted by the City). <br />8. Small dry/utility corridor preservation. The Preliminary Plat/Plans must be revised to preserve the <br />existing 10-ft. small/dry utility corridor along 5th Street North and Island Trail. The small/dry utility <br />corridor layout must be revised to include these corridors along all existing right-of-way frontage, <br />and all site plans must be revised to eliminate all encroachments. <br /> Revise storm sewer layout along the frontage of Lots 6 and 7, Block 6; along the frontage of <br />Lot 1, Block 4; and along the frontage of Lots 13-16. Storm sewer and structures must be at <br />least 10-feet from right-of-way line and may only cross the small/dry utility corridor <br />perpendicular. <br /> Building locations remain too close to 5th Street in the vicinity of the right turn lane. Increase <br />building setbacks for Lots 18-24, Lots 22-25, and Lots 26-30 such that ALL subdivision work can <br />be completed internal to the site without impacts to the public right-of-way or small/dry utility <br />corridor. All grading operations shall match existing conditions at a point 10-ft. internal from <br />the public right-of-way. The existing trees and street light were placed as part of the 5th Street <br />design standards and should not be relocated.