My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#05 - Pavement Management Program
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
07-01-25
>
#05 - Pavement Management Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 10:19:08 AM
Creation date
8/15/2025 10:19:00 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Prepared by: Bolton & Menk, Inc. <br />Pavement Management Plan ǀ City of Lake Elmo Page 1 <br />I. PURPOSE AND EXECUTIVE SUMMARY <br />This Pavement Management Plan (PMP) has been developed for the city to document a systematic <br />program of maintenance, repair, and improvement for the city street network. The City of Lake Elmo has <br />a commitment to its residents and the traveling public to maintain over 98 miles of public streets in a <br />condition that provides for functional, safe and efficient travel in a cost-efficient manner. <br />The policies and practices outlined in this PMP are intended to provide a blueprint for the city to maximize <br />the expected useful life of the city streets while minimizing maintenance and rehabilitation costs. The <br />program is comprised of four main components; including: 1) street inventory and condition assessment; <br />2) policies that will guide the timing and type of maintenance and rehabilitation activities and prioritizes <br />a schedule of preventative maintenance; 3) implementation of a 10-year Street Capital Improvement Plan; <br />and 4) understanding and committing adequate financial resources to maintain a consistent average <br />pavement standard. <br />The Report findings and recommendations are as follows: <br />· There are currently 98 miles of city roadways. From 2007 to 2013 the city street mileage remained <br />unchanged at 71 miles. The city has added 27 miles of new streets since 2013. <br />· The average condition rating for today’s streets is 89 (88.6). This overall rating has increased from <br />83 (82.7) in 2023. This generally represents a street network in excellent condition. However, <br />when looking at the street segments with no curb (typically the older portions of the street <br />network), the average PCI rating falls to 74.7, up from 72.1 in 2023. <br />· 88.0% of streets are in the “good” or “excellent” category and require only preventative <br />maintenance. This is up from 78.3% in 2023. <br />· 6.5% of streets are in the “fair” category and will require additional maintenance considerations, <br />such as a Mill and Overlay. This was 6.3% in 2023. <br />· 5.5% of streets are in the “poor” and “failing” categories, requiring a Full Depth Reclamation or <br />complete Reconstruction. This is down from 15.5% in 2023. <br />· The city should maintain an annualized street maintenance budget in the amount of $600,000 <br />over the next 10 years to adequately address its preventative maintenance, including Mill and <br />Overlays when applicable. <br />· The city should proceed with the implementation of the 2026–2035 Street Capital Improvement <br />Plan to address the 5.5% +/- of streets that remain “poor” to “failing” and to address the <br />increasing number of aging pavements over the next ten years. The plan estimates $26.7 million
The URL can be used to link to this page
Your browser does not support the video tag.