My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#05 - Pavement Management Program
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
07-01-25
>
#05 - Pavement Management Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 10:19:08 AM
Creation date
8/15/2025 10:19:00 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Prepared by: Bolton & Menk, Inc. <br />Pavement Management Plan ǀ City of Lake Elmo Page 4 <br />· The current PCI rating for each street segment is graphically depicted on the Street Ratings Map <br />found in Appendix A. <br />· Appendix B provides a listing of the current PCI rating for each street segment in Table form <br />together with segment ID, length, and area. <br />· The PCI – Pavement Conditions Breakdown by Total Pavement Surface Area is depicted on the <br />following Table and Bar Chart. <br /> <br />PCI - Pavement Conditions Breakdown <br />PCI Category <br />PCI <br />Range Maintenance/Rehabilitation Needs % (SF) <br />Est. <br />Miles <br />Excellent 85 100 Preventative Maintenance 79.7% 76.2 <br />Good 70 84 8.3% 7.8 <br />Fair 55 69 Rehabilitation / Mill and Overlay 6.5% 5.7 <br />Poor 40 54 Reclamation / Reconstruction 1.3% 1.5 <br />Failing 0 39 Reconstruction 4.2% 4.4 <br /> Total Street Miles 95.6 <br /> <br /> <br />PCI -PAVEMENT CONDITIONS BREAKDOWN <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.